
Pavement Management Program
Discover how Avondale is investing in smooth, durable, and well-maintained roads through proactive efforts designed to keep our community moving safely and efficiently for years to come. Stay informed about upcoming improvements and the latest project updates right here.
Introduction
The City of Avondale’s Pavement Preservation Program helps maintain safe, reliable roads and extend the life of existing pavement through proactive maintenance.
This webpage provides updates on current and upcoming pavement preservation projects. Additional projects will be added as schedules are finalized. This page will be kept up to date with the most current information, including any changes to project timelines.
Detailed project maps can be viewed by clicking on the links below.
Project Maps and Schedule
Subdivisions
Work Hours: 8am - 5pm
Traffic Impact: There will be lane restrictions and lane closures while crews are working. Signage will be posted before work begins and efforts will be made to minimize traffic delays. Please plan for possible short delays if you travel these routes during the work hours.
Crystal Gardens Subdivision August 12 - August 17
A summary of affected roads is included in this section and a color-coded map is linked below. This schedule was revised due to recent storms. The updated schedule is included below.
• 8/17 - Alvarado Rd, from east of 108th Dr to 107th Ave
• 8/17 - 107th Ave, from Alvarado Rd to Monte Vista Rd
• 8/17 - 108th Dr, from Alvarado Rd to Crystal Gardens Pkwy
• 8/18 - Alvarado Rd, from 109th Ave to just east of 108th Dr
• 8/18 - Monte Vista Rd, from 107th Ave to Cul-de-Sac
• 8/19 - 109th Ave, from Crystal Gardens Pkwy to north of Alvarado Rd (Concrete Gutter)
• 8/20 - 107th Ave, from Crystal Gardens Pkwy to Monte Vista Rd
Corte Sierra Subdivision August 12 - August 17
A summary of affected roads is included in this section and a color-coded map is linked below. Work was resceduled due to recent storms. The schedule below represents the revised schedule.
• 8/17 - 127th Ave, from Verde Ln to 126th Ave
• 8/17 - 127th Ave, from Avalon Dr to Monterey Wy
• 8/17 - Monterey Wy south half, from Santa Fe Trl to 127th Ave (Split Rd)
• 8/18 - Merrell St, from Santa Fe Trl to 127th Dr
• 8/18 - Catalina Dr, from 127th Ave to 127th Ave
• 8/18 - 126th Ave, from Catalina Dr to Earll Dr
• 8/18 - Earll Dr, from 126th Ave to 126th Dr
• 8/18 - 126th Dr, from Earll Dr to Monterey Wy
• 8/19 - Merrell St, from 127th Ave to 126th Ave
• 8/19 - 126th Ave, from Merrell St ton Verde Ln
• 8/19 - 127th Ln, from Merrell St to Verde Ln
• 8/19 - Verde Ln, from 127th Ln to 127th Dr
• 8/19 - 127th Ln, from Verde Ln to Merrell St
• 8/19 - 127th Ln, from Catalina Dr to Earll Dr
• 8/19 - Earll Dr, from 127th Ln to 127th Ave
• 8/20 - Monterey Wy north half, from Santa Fe Trl to 127th Ave (Split Rd)
• 8/20 - Avalon Dr, from 127th Ln to 127th Ave
• 8/20 - Catalina Dr, from Santa Fe Trl to 127th Ave
• 8/20 - Verde Ln, from 127th Ave to 126th Ave
• 8/20 - 127th Ave, from Thomas Rd to Verde Ln
Main Roadway / Arterials
Work Hours: 8:00 PM to 5:00 AM (Overnight)
Traffic Impact: Expect lane restrictions. A shadow truck will be utilized to protect crews while they are working. Please plan for possible short delays if you travel these routes during work hours. Signage will be posted prior to the start of construction.
Van Buren St (Manzanita Dr to Bridge)
July 10 – August 11, 2026
Dysart Rd (Indian School Rd to Thomas Rd)
August 3 – August 7, 2026
Lower Buckeye Rd (107th Ave to east of Avondale Blvd)
August 12 – August 13, 2026
Dysart Rd (Van Buren St to Buckeye Rd)
August 14 – August 19, 2026
Van Buren St (107th Ave to Avondale Blvd)
August 20 – August 25, 2026