City of Buellton, California
Buellton Garden Apartments

Buellton Garden Apartments

The proposed Buellton Garden Apartments Project consists of the construction of a new 89-unit multi-family residential development on a 3.06 acre site, located at 10 McMurray Drive, Assessor’s Parcel Number 137-200-087.

The property is zoned for General Commercial with an Affordable Housing Overlay Zone (CR-AHOZ) allowing residential development with a minimum density of 25 units/net buildable acre and minimum 20% affordability. The Project proposes to provide 88 units affordable to households with income qualifying as “very-low” and “low”. For a single-person household in 2023, the income limits were $37,550 in gross annual income to qualify as “very-low income” and $60,100 to qualify as “low income”.

The proposed development includes:
• Agrarian style architecture
• Two three-story apartment buildings, with 30 one-bedroom units, 37 two-bedroom units, and 22 three-bedroom units
• A community room and kitchen, learning center, and computer lab for residents
• Staff offices for the resident property manager, a visiting licensed social worker/resident services providers, and one floating office space for guest service providers
• Outdoor courtyards with half basketball court, play structure, shaded seating areas, and BBQ and picnic areas
• 148 total parking spaces, of which 15 are electric vehicle charging spaces
• Landscaping and lighting
• Cul-de-sac for the McMurray terminus
• Connection path to River Trail easement on southern adjacent parcel

In accordance with the requirements of the California Environmental Quality Act and the Environmental Impact Report Guidelines of the City of Buellton (collectively, “CEQA”), the City prepared an Initial Study and a Mitigated Negative Declaration for the project.

Map of Buellton showing location of the Buellton Garden Apartments

Stay Informed

Get notified on upcoming engagements and the latest project related news.

Important Dates

17
Nov 2022

Public Hearing

The Planning Commission held a Public Hearing on the project and Initial Study/Mitigated Negative Declaration and approved the project with conditions.

17
Nov 2023

Encroachment & Grading Permits Issued

An Encroachment Permit and a Grading Permit have been issued for the Project. Grading of the site is permitted to begin.

18
Jun 2024

Building Permits Issued

The County of Santa Barbara Building and Safety Division issued building permits for this project.