City of Buellton, California
Polo Village South Elevations

Polo Village

The Polo Village Project consists of the construction of a new 49-unit multi-family residential development on a 2.16 acre site, located at 560 McMurray Drive, Assessor’s Parcel Number 137-090-067.

The property is zoned for General Commercial with an Affordable Housing Overlay Zone (CR-AHOZ) allowing residential development with a minimum density of 25 units/net buildable acre and minimum 20% affordability. The Project proposes to provide 48 units affordable to households with income qualifying as “very-low” and “low.” For a single-person household in 2023, the income limits are $37,550 in gross annual income to qualify as “very-low income” and $60,100 to qualify as “low income.”

The proposed development includes:

  • Mission Revival style architecture
  • Two three-story apartment buildings, with 6 one-bedroom units, 30 two-bedroom units, and 12 three-bedroom units, ranging in size from 604 to 1,003 square feet of living area
  • A three-story community building with one three-bedroom manager's unit
  • An outdoor recreation area with a playground, multi-sport ball court, BBQ, and picnic area
  • 81 total parking spaces, of which 8 are Electric Vehicle Charging Stations
  • Landscaping and lighting

The Project qualifies under Senate Bill 35 (SB 35), which grants qualifying projects a streamlined, ministerial permitting process. For an SB 35 project, a local government may only apply objective development and design standards, and cannot require a public hearing to be held for discretionary approval of the project. The Project also qualifies under the State Density Bonus Law for requests to be granted on decreased parking and concessions on development standards, which include exceptions to fencing, landscaping, and screening standards.

In accordance with the requirements of the California Environmental Quality Act and the Environmental Impact Report Guidelines of the City of Buellton (collectively, “CEQA”), the proposed Project is exempt from environmental review, as it is a ministerial project.

Polo Village Elevations

Stay Informed

Get notified on upcoming engagements and the latest project related news.

Important Dates

10
Mar 2022

Application Submittal

Application for a Final Development Plan submitted.

30
Jun 2022

Project Approval

The Project is approved by the Planning Director.

25
Jul 2023

Grading Permit Issued

10
Apr 2025

Final Inspections in Progress

Inspections underway on the project from the Santa Barbara County Office of Building and Safety, the Santa Barbara Count Fire Department, and the City of Buellton Planning Dept.