Webster Street Waterline Replacement Project
About
Webster Avenue from College Place to Stadium Drive
- 1,300 linear feet of 6" main & 105 linear feet of 12" main will be replaced
- Pavement Repair and Resurfacing
Existing main from College Place to Grand Avenue upsized to an 8" main
Grand Avenue to the 12-inch tie in replaced with 8" main.
Additional work includes:
- fire hydrant replacements
- installation of main line valves
- service line transfers
- pavement and site restoration
- replacement of a section of drainage.
Water service will be temporarily shut off during replacement. Surfaces disturbed during construction (e.g. paved roads, driveways, lawn strips and lawns, etc.) will be restored upon completion of line replacements.