Water Main Expansion
- Project Timeline: Fall 2023 - Fall 2025
- Project Manager: Water Department Director Mark Willett
- Design Engineer: James Drake, CDM Smith, Inc.
- Resident Project Representative: Ziad Kary, Environmental Partners Group, Inc.
This project is the expansion of a Town Water Main as part of the Town’s voluntary efforts to address potential PFAS contamination in private wells west of the Airport. This project is technically separate from the roadway reconstruction, drainage, and multi-use path projects underway however it does overlap on the roadway projects on Lovers Lane, Okorwaw Avenue and Monohansett Road, Phase 2, 3 and 4 respectively. Specifically, this water main project includes the remaining portions of Lovers Lane and Skyline Drive, and all of Webster Road, and Nobadeer Way.
The water main project is funded by Massachusetts’ Department of Environmental Protection’s (MADEP) State Revolving Fund (SRF). The Town’s $8.3M application for the SRF was accepted and the project was placed on the MADEP’s SRF Intended Use Plan in February 2022. 2022 ATM Article 10 – New Water Main West of Airport approved $9.0M debt exclusion and 2022 ATE Ballot Question 13 approved the $9.0M debt exclusion (approved 1,738 Yes, 496 No, 140 Blank).
Because the timeline for use of the SRF funding is faster than the existing roadway reconstruction projects (see Guide to SRF Financing), the Water Main Expansion Project is considered Phase 1 in the sequence of projects. The Water Main Expansion Project overlaps multiple Surfside area roads intended for roadway reconstruction, drainage and mixed-use path upgrades, therefore the Project Team advocates accelerating the schedule of the roadway reconstruction projects to address paving the roads following the Water Main Expansion project.
In accordance with the Massachusetts Department of Environmental Protection’s State Revolving Fund Program, the Town’s water main expansion project is being bid under Ch.30 Section 39M
Stay Informed
Get notified on upcoming engagements and the latest project related news.
Important Information
Project Updates
Important Dates
2023 Annual Town Meeting
Article 96 Real Estate Acquisition: Easements in Skyline Drive, Webster Road, Portions of Monohansett Road and Okorwaw Avenue for Water Main Extension Project was approved at the May 6, 2023 Annual Town Meeting.
Re-Post Bid (original posting 02/25/2023)
Voluntary Pre-Bid Conference
Bid opening
Posting requirement: 4 weeks from posting.
Select Board Meeting/Vote
Contract Execution
08/31/2023 deadline for contract execution per MassEP.
Construction Services Contract Award
Resident Project Representative contract awarded to Environmental Partners Group, Inc.
EGP, Inc. Service Contract
EGP, Inc. Service Contract (Exhibit B)
EGP, Inc. Service Contract (Exhibits C-E)
Construction Contract
Construction Contract awarded to CC Construction, Inc.
CC Construction Contract
Anticipated Construction Start
October 30, 2023
Anticipated start of Phase 1 construction on Monhansett Road
Construction Begins
Construction of Phase 1 begins on Nobadeer Way.