Robson Ranch Lift Station and Water Treatment Plant Upgrades
Bypass and Vault Progress
The contractor is diligently engaged in operations at the lift station site.
The contractor is diligently engaged in operations at the lift station site. The bypass process was successfully initiated at the lift station on January 28th. The contractor has skillfully replaced the outdated vault and has completed the tie-in process with precision. Currently, the contractor is addressing groundwater seepage concerns by expertly performing crack injection procedures to ensure the integrity and longevity of the infrastructure.