Denton, TX
Construction trucks paving road with text "Elm and Locust Ph 2 Improvements" overlaid

Elm and Locust Ph 2 Improvements

This project consists of full depth reconstruction of N Elm Street from W McKinney St to University Drive (US-380) and N Locust St from W McKinney St to University Drive (US-380). This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes replacing existing aging water and sanitary sewer lines, select stormwater infrastructure, limited sidewalk improvements, and street lighting.

Graphic of construction crew working on streets

Stay Informed

Get notified on upcoming engagements and the latest project related news.