Hobson Lift Station Electrical Upgrade
Thank you for visiting our site! We are excited to share updates about our latest project at the Hobson Lift Station.
In continuous service since 1980, the Hobson Lift Station's electrical components have suffered from corrosion due to hazardous sewer gases. To address this, we are relocating the electrical system away from the wet well to prevent ongoing damage and ensure reliable operations.
Project Highlights:
- Relocate the electrical system away from the wet well to stop corrosion and reduce downtime.
- Elevate the electrical pad to protect components from flooding, ensuring long-term reliability.
- Upgrade to modern standards to improve redundancy and system performance.
These improvements will enhance the Hobson Lift Station's efficiency and reliability, ensuring it continues to serve our community effectively for years to come.
Thank you for your interest in our project. Stay tuned for more updates as we enhance our infrastructure!
Stay Informed
Get notified on upcoming engagements and the latest project related news.
Project Updates
Electrical Pole Being Moved
Our team just nailed the drilling of a test hole, setting the stage for the piers that’ll make this project rock-solid. It’s a huge step forward, and we’re pumped!
Old Wet Well Filled in
The old wet well has been successfully filled in and secured, marking a significant milestone in the project's progression.
Exciting News! Construction Has Commenced
Construction is underway!
Ongoing Collaboration
Our collaborative team, consisting of city staff, the construction company, and the engineering firm, is making significant progress on the construction plans.
Project Update
We’ve been actively collaborating with the Engineering firm, construction contractor, and city staff through several productive meetings to refine and finalize the design changes for the electrical fixtures on this project.
Preconstruction Meeting
A preconstruction meeting has been successfully conducted, bringing together the City of Denton Project Management staff, Gupta & Associates engineering team, Harendt Construction Group, and the Pecan Creek Water Treatment Plant electricians.
Benefits of Variable Frequency Drives (VFDs) over Switchgear
Variable frequency drives (VFDs) offer several advantages over traditional switchgear systems in wastewater treatment.