Newton Rayzor Safe Routes to Schools (SRTS) Sidewalk Project

The City is working to enhance walkability and improve pedestrian access near Newton Rayzor Elementary, fostering a stronger, more accessible community for all. With support from TxDOT and NCTCOG through the SRTS Grant Program, we are continuing our safe routes to schools initiative.

PROJECT INFORMATION

Transforming pedestrian accessibility and safety is a top priority for the City of Denton. Through the valuable support of the Texas Department of Transportation (TxDOT) and the North Central Texas Council of Governments (NCTCOG), we’re leveraging the Safe Routes to Schools (SRTS) Grant Program to enhance routes for students traveling to and from Newton Rayzor Elementary. This initiative aims to install much-needed sidewalks in targeted areas, ensuring a safer and more user-friendly experience for pedestrians of all ages. In addition to improving student access, this project also addresses broader connectivity needs by closing key sidewalk gaps, creating a more seamless pedestrian network for the neighborhood.

SRTS Sidewalk and Bicycle Locations Improvements

Maps showing planned SRTS sidewalk and bicycle facility locations

SEGMENTS FINALIZED

City staff have finalized the sidewalk segments to ensure the project is within the SRTS Program Funds of 4.6M. (see Sidewalk Locations Map)

We appreciate the communities input that helped us prioritize this area's needs while staying within the budget.

Due to the SRTS Program project boundaries, some streets could not be included in this project and are being evaluated for future sidewalk improvements as funding becomes available.

FAQ

My street is not in the Newton Rayzor School Zone. Why is it getting a sidewalk?
At the time this project was submitted for SRTS Funding consideration, this area was in the Newton Rayzor zone. The sidewalk will still provide a safe route to students attending Reeves Elementary.

How do I know when this project will start construction?
After a contractor is selected but prior to construction starting, the City will hold a community meeting to introduce the contractor and share project information including what to expect during construction and 24 hour contacts for any project related issues.

Is the homeowner responsible for sidewalk maintenance after the city installs it?
No. The city maintains sidewalks within the city's right of way.

Who is responsible for moving my sprinkler heads and irrigation?
The contractor installing the sidewalks will have an irrigation subcontractor who will relocate, replace and/or repair any irrigation issues.
Prior to construction on your block, the contractor will ask each resident with an irrigation system to run their sprinkler system to ensure it is in good working condition and/or document any issues.

Will my driveway be cutoff during construction?
The contractor will notify residents 48 hours in advance of when they plan to install the sidewalk and new driveway. While the driveway and sidewalk are curing, the resident(s) will need to park on the street.

Will my mailbox have to be relocated? What if I have a brick mailbox?
In some cases, the contractor may move your mailbox closer to your driveway in the greenspace where it provides more room behind the mailbox for the sidewalk. If a brick mailbox needs to be relocated, it will be discussed with the homeowner to understand their wishes. If needed, a brick mailbox can be disassembled and reassembled with the same bricks. If you have a special mailbox you are concerned about, please don't hesitate to contact the Project Manager at robin.davis@cityofdenton.com.

I have a large tree in the path of the new sidewalk. Will the city remove it?
We try very hard NOT to remove mature, healthy trees. If you have a large, healthy tree in the city's right of way where the sidewalk needs to go, the Project Manager will reach out to you to discuss the possibility of going around the tree. This may require the city to obtain a sidewalk easement from the homeowner. These instances are handled on a case by case basis. If you would like to discuss a tree on your property you feel may be affected, please contact the Project Manager at robin.davis@cityofdenton.com

I have large rocks/boulders in the path of the sidewalk. What will the city do with them?
Any large items in the path of the sidewalk will be worked out with the property owner and relocated to another area on the property (within reason).

If you have questions not shown here, please contact the Project Manager at robin.davis@cityofdenton.com.

Project Planning and Initiation

November 2024 - October 2025

Preliminary Design

October 2025 - March 2027
This extended time is for the review process required by TxDOT and NCTCOG at all 30, 60, 90 & 100% design submittals

Final Design

April 2027 - April 2028
This extended time is for the review process required by TxDOT and NCTCOG at all 30, 60, 90 & 100% design submittals

Stay Informed

Get notified about new projects, the latest updates, and new opportunities to engage.

Contact Information

To provide feedback on this project, please contact the Project Manager listed below.

picture of Project Manager Robin Davis
Robin Davis, PMP
Construction Projects Manager