Ryan Road Reconstruction Project

The Ryan Road Reconstruction Project will improve mobility and safety on Ryan Road from Teasley Lane (FM 2181) to Country Club Road (FM 1830) by expanding the roadway to include two 12-feet wide travel lanes with a full length 11-feet wide center turn lane, new street lighting, and a 10-feet wide sidewalk path on the south side of Ryan Road. The project is currently in the design phase.

Project Status:
In initiation and Planning & Design Phase


Estimated Project Cost: $20 million

Sponsoring Department:
Engineering Department

Funding Source: 2019 Bond Programs

Project Location: Ryan Road from Teasley Lane to Country Club Road

Contact Information:
Multi-phase projects may require different project managers. Below is the current project manager(s) and the phase(s) they manage.