Visit Denton, TX Homepage
Project

Trenching and Conduit Boring - US 380 Lighting Project

US 380 Lighting

Utility trenching is now in progress along the US‑380/University Drive corridor, accompanied by subsurface boring for conduit installation. These activities mark the next step in the City’s effort to bring continuous street lighting to this vital roadway. This improvement is designed to enhance safety, visibility, and overall travel conditions in alignment with DME standards and TxDOT guidelines.