City Wide Annual Pavement Management Program
Project Overview
The City of Dunedin implements an annual paving program meticulously crafted to address street conditions, assessed using advanced software. Through this system, streets undergo thorough evaluation based on their overall condition rating, initially examined by the software and subsequently reviewed by city staff.
Project Budget
The comprehensive project encompasses milling and paving streets in need of repair, along with the replacement of curbs and gutters. Allocating an annual budget of approximately $1 million for paving, sourced from the County Gas Tax fund and Penny fund, as well as $200 thousand for curb and gutter replacements from the Stormwater Utility Fund, the city is committed to enhancing its infrastructure.
Project Elements
Residents residing in areas undergoing street milling and paving can anticipate a temporary but impactful transformation within their neighborhood. The process involves the meticulous removal of old asphalt through milling, succeeded by the precise placement and compaction of new asphalt. While this operation progresses, some noise, vibrations, and temporary restrictions in access and traffic flow may occur. Additionally, residents may experience dust and a faint asphalt odor. Adhering to local guidelines and notices is essential to navigate these temporary inconveniences seamlessly.
Objective
The ultimate outcome will be a freshly paved street, contributing significantly to improved road quality and enhancing the overall appeal of the neighborhood.
Concrete Curb/Gutter Work Clarification
This part of the project is a crucial endeavor aimed at enhancing the infrastructure within our community. This project specifically revolves around the installation and repair of curbs and gutters in targeted locations within our neighborhood. It's important to emphasize that this initiative does not encompass the entirety of the subdivision's curb and gutter system; instead, it focuses on identified areas requiring immediate attention.
Roads to be paved in 2026:
- Bay St (Bass Blvd to MLK)
- Milwaukee Ave (Skinner Blvd to Bay St)
- Oak St (Skinner Blvd to Bay St)
- Jackson St (MLK to Douglas Ave)
- Palmetto St (Douglas Ave to Jackson St)
- Santa Monica Dr (San Salvador Dr to Patricia Ave)
- Santa Clara Dr
- San Diego Dr
- Santa Monica Ct
- San Pedro Dr
- San Salvador Dr (Patricia Ave to Pinehurst Rd)
- St. Catherine Dr (North, East & West)
- Glynwood Pl
- Shetland Terrace
- Haywick Terrace
- Prestwick Pl
- Patricia Ave (San Salvador Dr to Mclean St)
- Overcash Dr (Main St (SR580) to Hitching Post Lane)
- Simmons Ct
- Ranchwood Dr South
- Ranchwood Dr East
- Hitching Post Ln
- Stony Brook Ln
- Dinnerbell Ln South
- Dinnerbell Ln East (Dinnerbell Ln S to Copper Kettle Lane)
- Copper Kettle Lane (Dinnerbell Ln E to Overcash Dr)
- Robmar Rd
- Cardinal Dr
- St. Anne Dr
- St. Mary Dr
If you have any questions or concerns please contact the Engineering Inspector at 727-298-3181