Visit City of Bellbrook Homepage
Road Drainage

Lower Hillside Drainage Improvements

The City of Bellbrook has allocated ARPA funds to help improve storm water drainage in an area that has been problematic for some time. Lower Hillside has seen storm srainage issues so sever that homes have flooded in the are with just modest amounts of rain and run-off. Since there are not curb and gutters tied into a storm drainage system, it was determined improved catch basins and larger pipes for increased flow and drainage of water runoff would need to be installed.

This project installs larger and additional catch basins, larger and better sloped drainage pipes, and improved outlet to allow gethering and better flow of water run off during rain events.

Stay Informed

Get notified on upcoming engagements and the latest project related news.

"We are excited to make improvements to the City's infrastructure to protect and increase the quality of life for our residents."
Mike Schweller
Mike Schweller
Mayor

Project Timeline and Phases

Engineering and Design

Spring 2023

Bid Design and Advertisement

Fall 2022

Bid Award and Project Preparation

Fall 2022

Project Updates