Visit Fargo, ND Homepage
Next phase of 32nd Avenue South construction is set for April 15th 2026
Project

Phase 1 32nd Avenue South 2026

32nd Ave. S (BR-26-H1)

Construction crews are preparing to begin Phase 1 of Segment 3 for the ongoing 32nd Avenue South reconstruction project, set to begin Wednesday, April 15.

Phase 1 impact:

32nd Avenue South is closed to through traffic for roadway, pedestrian, and utility infrastructure improvements. This portion of the project closes 32nd Avenue South between University Drive South and the Lift Station.

Access Notice

To reach 1101 32nd Avenue South (Lantern Light), follow the posted detour via 30th Avenue South to 11th Street South, as shown on the Road Closure Map below.

Local access to the following properties remains available via 11th Street South and Harwood Drive South:
• 3207 11th Street South
• 3200 11th Street South
• 3231 11th Street South

32nd Ave S Detour

32nd Ave S Local Access Detour

Stay Informed

Stay in the loop with all the latest updates on upcoming engagements and project news by signing up for notifications.