Overview:
This project aims to apply the final layer of asphalt on the streets. This will ensure the street section reaches its designed thickness and corrects any deficiencies that have developed over time.
Adding an asphalt wear course will improve the quality of the road, providing a smoother ride and better drainage.
As part of this project, the contractor will be responsible for...
*Mud-jack and repair the curb as needed to address drainage issues, only replacing the sections that require attention.
*Repair sections of damaged pavement.
*Replace sections of sidewalk that require repair to meet Americans with Disabilities Act standards.
Impacts:
Traffic will continue during construction; however, some lanes may close temporarily, and parking could be reduced for the work being done.
Certain sidewalks will be closed at times to facilitate construction work.
SPECIAL ASSESSMENT
Some properties within the project area may be subject to special assessments to help fund the improvements. If you’re a property owner and would like to check whether your parcel is affected, you have two options:
- Visit Fargo Parcels directly.
- Or, click on a parcel in the interactive map below, then select the “Fargo Parcels” button to be taken to the corresponding property page.
Note: Estimated special assessment costs will be posted as the project gets closer to starting. These amounts stay on your property as estimates throughout the project and won’t become final until the work is completed.
Once on the Fargo Parcels site, you can:
- Search by your address or parcel number
- View your assessment history
- See estimated special assessment costs related to this project (if applicable)
For more special assessment information click here.
PN-26-A1 Wear Course Locations
Important Dates
Bid Date
Contractor - Border States Paving Inc