New Laboratory Building
Project No: 107032
Current stage: Construction
Schedule: Construction to be complete by end of July, 2026
Consultant: Think Architecture
Contractor: T.R. ORR
Description:
The City’s existing laboratory is located in an area of the Mulberry Treatment Plant building and was originally part of the treatment process prior to being converted to a laboratory. In February 2023 a safety inspection was performed, and it was determined in order to better meet regulatory compliance a new laboratory facility should be constructed.
Location: Northeast of the existing Mulberry Wastewater Treatment Plant and immediately southwest of the intersection of Cypress Dr and Oak Dr.
Contact: Capital Programs Manager - (928) 854-0789