Second Bridge & Roadway Improvement Project

Lake Havasu City has entered into an Intergovernmental Agreement with the State of Arizona (ADOT) to accept the state-appropriated funding of $35,500,000 for the study, design and construction of an emergency evacuation route second bridge. The notion of a second bridge connecting Lake Havasu’s mainland to the island has been a local desire for over two decades in the making. A second bridge to the island, to complement the existing London Bridge, will provide enhanced emergency evacuation and emergency access.

Agencies We Have Been Working With:

• Arizona Department of Transportation
• Arizona State Lands
• Arizona State Parks
• Bureau of Land Management
• United States Coast Guard

Project No: 106015
Current stage: Design
Schedule: To be completed by end of August with construction to start spring of 2027
Consultant: NV5
Contractor: Ames Construction

Stay Informed

Get notified on upcoming engagements and the latest project related news.

Jason Hart
Capital Programs Manager

Project Phases

Feasibility Study

December 2023 - June 2024

Design Phase (Hire Design Firm and Initial Designs)

July 2024 - December 2024

Preliminary Design Completion (20% and 30% Bridge Design)

January 2025 - September 2025