The city will perform a roadway asphalt grind and overlay with associated ADA curb ramp upgrades, sidewalk improvements, and crosswalk updates as required, based on the impacted areas.
The project also includes some full-depth spot repairs, utility adjustments, and replacing existing roadway markings. The project locations are:
Site 1: 113th Ave NE from SR92 to 32nd St NE
Site 2: 20th St. NE from Ashley Pointe to 116th Ave NE
Site 3: 4th St. NE from SR9 to 99th Ave NE
Site 4: Vernon Road from the bridge (1706 Vernon Rd) to Lundeen Parkway roundabout
Site 5: Vernon Road from Lundeen Parkway to 91st Ave NE
Site 6: 22nd Place NE from 130th Dr. NE to Cul-de-sac
Erik Mangold, PMP
Capital Projects Manager
Phone:
425.622.9443
Email: emangold@lakestevenswa.gov
Pavement preservation is essential to ensure the longevity and reliability of the city's road infrastructure. By proactively maintaining roads through techniques like crack sealing, chip sealing, and overlays, Lake Stevens can prevent minor issues from escalating into more costly repairs or full replacements. This approach not only extends the lifespan of existing pavements but also enhances road safety and driving comfort for residents and visitors. Furthermore, pavement preservation strategies in Lake Stevens contribute to the overall economic vitality of the region by reducing long-term maintenance expenses and minimizing disruptions caused by extensive roadwork. By prioritizing pavement preservation, Lake Stevens demonstrates its commitment to efficient resource management and sustainable urban development, ensuring its roads remain durable and functional for years to come.
Who is coordinating the project?
Weekly Construction Hours
Get notified on upcoming engagements and the latest project related news.