At the heart of the City of Lake Stevens a broad-scale revitalization effort is getting underway: The Lake Stevens Outlet Restoration Project. This initiative draws on traditional management of the lake and scientific studies that advance goals in managing downtown flooding, supporting water quality, and augmenting fish habitats. The lake's Outlet Channel is a ditched stream that was central to local commerce since the early 20th Century when the Rucker Brothers Lumber Company erected a mill at North Cove. Community values of the original Lake Outlet Channel (historically referred to as Lower Stevens Creek), with a broad floodplain supporting wildlife and scenic views, is regained in this innovative approach to restoring the historic creek. It will touch upon the past while securing a better future.

Moving forward, the past research, studies, and endeavors focused on the Outlet Channel and Lower Stevens Creek inform the next steps to restoring this channel and addressing the flooding downtown. This project will design the restoration of a portion of the historic channel along Hartford Drive. The project includes channel restoration and bridge infrastructure. Preliminary site sites will include site data collection, hydrologic modeling, and permit coordination. This work will improve aquatic and terrestrial habitats, reduce localized flooding, and enhance water quality. This project is financed by grant funding administered by the U.S. Environmental Protection Agency (EPA) through its Community Grant Program.

Stay tuned for more information on this project and ways to engage with the City through the design phase!

Manténgase informado

Reciba notificaciones sobre los próximos compromisos y las últimas noticias relacionadas con el proyecto.

"Make a meaningful difference in our community by participating in the Lower Stevens Creek Restoration Project. Your engagement can shape the future direction of this monumental effort to improve flood management, water quality, and fish habitat - while seeking to restore parts of a historic stream that flows through the heart of the City of Lake Stevens."
Olin Anderson
Surface Water Coordinator

Fases del proyecto

Hartford Reach - Design and Construction
January 2025 - December 2029
20th St NE Reach - Design and Construction
January 2027 - December 2030
Main Street Reach - Planning and Conceptual Design
January 2029 - December 2031

Actualizaciones del proyecto

Fechas importantes

26
ene 2026

Wetland Delineations

A crew from Shannon and Wilson will be visiting properties in the beginning of this week as approved for determining wetland and waterbody boundaries in the project area.

2
feb 2026

Hartford Drive Road Closure

Upcoming Road Closure for Geotechnical Drilling
To support the design of the road and bridge for this project, crews will be performing geotechnical drilling the week of February 2. This work is essential to ensure a safe and durable design.

What to Expect:

  • The road will be closed for the entire week of February 2 during the day and will open in the evening.
  • Please plan ahead and use alternate routes during this time. Local access will remain available to residents.
23
feb 2026

(approximate date) Site Surveying

In late February or early March 2026, a crew will be locating property corners and important features in the project area, as feasible.