Lake Stevens Outlet Restoration Project

Lake Stevens Outlet Restoration Project

At the heart of the City of Lake Stevens a broad-scale revitalization effort is getting underway: The Lake Stevens Outlet Restoration Project. This initiative draws on traditional management of the lake and scientific studies that advance goals in managing downtown flooding, supporting water quality, and augmenting fish habitats. The lake's Outlet Channel is a ditched stream that was central to local commerce since the early 20th Century when the Rucker Brothers Lumber Company erected a mill at North Cove. Community values of the original Lake Outlet Channel (historically referred to as Lower Stevens Creek), with a broad floodplain supporting wildlife and scenic views, is regained in this innovative approach to restoring the historic creek. It will touch upon the past while securing a better future.

Moving forward, the past research, studies, and endeavors focused on the Outlet Channel and Lower Stevens Creek inform the next steps to restoring this channel and addressing the flooding downtown. This project will design the restoration of a portion of the historic channel along Hartford Drive. The project includes channel restoration and bridge infrastructure. Preliminary site sites will include site data collection, hydrologic modeling, and permit coordination. This work will improve aquatic and terrestrial habitats, reduce localized flooding, and enhance water quality. This project is financed by grant funding administered by the U.S. Environmental Protection Agency (EPA) through its Community Grant Program.

Stay tuned for more information on this project and ways to engage with the City through the design phase!

Manténgase informado

Reciba notificaciones sobre los próximos compromisos y las últimas noticias relacionadas con el proyecto.

"Make a meaningful difference in our community by participating in the Lower Stevens Creek Restoration Project. Your engagement can shape the future direction of this monumental effort to improve flood management, water quality, and fish habitat - while seeking to restore parts of a historic stream that flows through the heart of the City of Lake Stevens."
Olin Anderson
Surface Water Coordinator

Fases del proyecto

Hartford Reach - Design and Construction

January 2025 - December 2029

20th St NE Reach - Design and Construction

January 2027 - December 2030

Main Street Reach - Planning and Conceptual Design

January 2029 - December 2031

Project Updates

October 8th: Hartford Drive Closed - access only to local traffic. Drilling rigs will be on Hartford Drive near the Catheriner Creek/Hartford Drive crossing. We are doing an additional geotechnical investigation to support the design of the new bridge at this crossing.

Important Dates

22
sep 2026

Wetland Delineations: September 22 - 24

Crews will be around Hartford Drive and along Catherine Creek collecting additional wetland data.

5
oct 2026

Survey Work: October 5 - 8

Crews will be around Hartford Drive and north of Hartford Drive in the wetland to collect additional survey points.

8
oct 2026

Hartford Drive Closed - local access only

An additional geotechnical evaluation will be performed on Hartford Drive near the Catherine Creek/Hartford Drive crossingsupport. This work will sipport the bridge design at this location.