Project

Holbeck Housing Group Retrofit

Find out more about the Holbeck Housing Repair Scheme and how the refurbishments are going.

Heart of Holbeck

Scaffolding on housing

The Holbeck Group Retrofit Project is a strategic initiative led by the Council to provide financial support for the enhancement of external elements of residential properties (regardless of tenure), implemented on a block-by-block basis. Please see the red boundary map below of the properties that are able to apply for financial support.  

Construction works to properties started in early 2026 and will run until Spring 2027.  The primary objectives of the scheme are to:

  • Extend the lifespan of properties by a minimum of 30 years
  • Enhance thermal efficiency
  • Improve home security
  • Contribute to a more attractive and cohesive streetscape

Typical works carried out under the scheme include:

  • Re-roofing, including insulation of roof voids
  • Chimney repairs
  • Installation of high-performance double-glazed windows
  • Replacement of guttering and downpipes
  • Fitting of secure, thermally efficient external doors
  • Application of external wall insulation with a brick-effect finish

Owner/Owner-occupiers and Private Landlords are required to contribute no more than 25% of the total cost of the improvements.

Owner-occupiers may not be required to contribute financially, subject to an assessment of their ability to pay.

All works are designed to be completed with minimal disruption, allowing occupants to remain in their homes throughout the process.

All retrofit measures are undertaken in accordance with the PAS 2035 energy efficiency standard, ensuring compliance with best practices in sustainable building performance.

We have received highly positive feedback from both tenants and property owners regarding the completed works. These improvements have significantly enhanced the thermal efficiency of the properties, resulting in lower energy costs for occupants and contributing to the reduction of fuel poverty within the community.

Contact details for the team are as follows: 

Email: group.repair@leeds.gov.uk

Tel: 0113 3788360.

Below you’ll find a map outlining the designated target area for Holbeck Phase 3. This highlights the specific streets where the scheme will be delivered. Please note that properties located outside this defined area are not eligible for inclusion.

Target area of the scheme:

Discover more

tovbed6b0qjjfazk8qb5.png

Local Centre Consultation

The feedback from the consultation over the summer on how you want to see your local spaces improved.

Posted:
Read More
Image of a public consultation.

Consultation Events

View our upcoming consultation events on the local centre schemes.

Posted:
Read More
Image of the Heart of Holbeck banner.

Local Centre FAQs

View some frequently asked questions about the schemes.

Posted:
Read More
Side view picture of St Matthews Church in Holbeck

St Matthew's Community Centre and The Old Box Office

Find out more about the improvements to St Matthew's and the Old Box Office building, both operated by community anchor Holbeck Together

Posted:
Read More
Heart of Holbeck logo
Closed

Neighbourhood Greenspace: Bowling Green proposals and survey

Give your feedback before 28 July and be entered into a prize draw.

Project:Heart of Holbeck
Arial view of Churchyard.
Closed

Community Greenspace: St Matthew's Churchyard proposals and survey

Give your feedback before 28 July and be entered into a prize draw.

Project:Heart of Holbeck
Heart of Holbeck logo
Closed

Holbeck wayfinding and walking route proposals and survey

Give your feedback before 28 July and be entered into a prize draw.

Project:Heart of Holbeck
Ariel image of Holbeck Moor Park.
Closed

Community Greenspace: Holbeck Moor Park proposals and survey

Give your feedback before 28 July and be entered into a prize draw.

Project:Heart of Holbeck
Technical concept drawing of the proposed gyratory system in Holbeck
Closed

Local centre highway and public realm proposals and survey

Give your feedback before 28 July and be entered into a prize draw.

Project:Heart of Holbeck