
Leeds City Council Flood Resilience
Leeds City Council and partner organisations are working on a range of Flood Alleviation Schemes across the city region.
Have your say on Sheepscar Beck Flood Alleviation Scheme, keep up to date on ongoing projects by signing up to Leeds City Council mailing list, and find out more about our completed projects below.
About the project
Information on upcoming studies

Thorner Beck Flood Alleviation Scheme
Find out how we’re reducing the risk of flooding to properties in Thorner from Thorner Beck

proposal-3
Description

Potternewton Flood Risk Study
Find out how we’re lowering the risk of flooding around Potternewton Park with our flood risk study

Wortley Beck Flood Risk Study
Find out how we’re lowering the risk of flooding to properties from Wortley Beck with our Flood Risk Study

Hybrid Ecologies: Creative Interpretation at Sheepscar Beck
There's a new engaging artwork coming to Sheepscar Beck, co-created by the local community and artist Katie Surridge, inspired by the hidden wildlife in our urban environment.
Information on completed projects

Leeds Flood Alleviation Scheme Legacy Information

proposal-2
Description

Farnley Wood Beck Legacy Information
Information on the works to alleviate flooding in Churwell from Farnley Wood Beck

Sheepscar Beck Flood Alleviation Scheme Legacy Information
Find out more about the scheme to repair and sustain the existing level of flood risk in the area.
Want to sign up to Leeds City Council mailing list for more information on Leeds City Council projects?
Timeline
Lowther Road FAS
Leeds Flood Alleviation Scheme Phase 1
Ramsden Street FAS
Glebelands FAS
Barley Hill FAS
Westfields FAS
Wyke Beck FAS
Hawthorn Terrace FAS
Leeds Flood Alleviation Scheme Phase 2
Mickletown Pit Lane FAS
Otley FAS
Farnley Wood Beck FAS
Sheepscar Beck FAS
Proposals
Have your say on Wortley Flood Risk Strategy
HAVE YOUR SAY

Consultation - Flood Risk Management Strategy
Have your say on our draft Local Flood Risk Management Strategy

Hybrid Ecologies: Creative Interpretation at Sheepscar Beck
There's a new engaging artwork coming to Sheepscar Beck, co-created by the local community and artist Katie Surridge, inspired by the hidden wildlife in our urban environment.

Feedback on the Meanwood Valley Farm Demonstrator Site and Meanwood Rain Chain
A short survey to accompany the information given at the Meanwood Valley Farm Summer Fair

Thorner Beck Flood Alleviation Scheme Preferred Option
Have your say on the preferred option for reducing flood risk to properties in Thorner from Thorner Beck

Farnley Wood Beck Natural Flood Management scheme
Find out how we're delivering NFM measures to help reduce flood risk

Leeds Flood Alleviation Scheme Legacy Information

Sheepscar Beck Flood Alleviation Scheme Legacy Information
Find out more about the scheme to repair and sustain the existing level of flood risk in the area.

Leeds Flood Alleviation Scheme Murals
Information on the installation of two murals on the Leeds FAS control room buildings

Sheepscar Beck FAS
We aim to carry out repair works to sustain the existing level of flood risk in the area.

Farnley Wood Beck Legacy Information
Information on the works to alleviate flooding in Churwell from Farnley Wood Beck

Potential Embankments/Flood Walls on Left Bank Pudsey to Farnley Balancing Reservoir
Some provisional options that could reduce flood risk from Wortley Beck. Have your say on these potential options before they are studied further.

Daylighting watercourse - Farnley Balancing Reservoir to Lower Wortley
Some provisional options that could reduce flood risk from Wortley Beck. Have your say on these potential options before they are studied further.
Team
Each of these teams is responsible for different aspect for this project. You may see some of us around the area.
