a photograph of frozen flood water with a cartoon wave and birds overlayed
Project

Potternewton Flood Risk Study

Find out how we’re lowering the risk of flooding around Potternewton Park with our flood risk study

Leeds City Council Flood Resilience

Potternewton Flood Risk Study

Find out how we’re lowering the risk of flooding around Potternewton Park with our flood risk study.

Why Potternewton needs flood protectionFlooding to a footpath in Potternewton Park. Grass and trees to the left and right, frost on the ground and a significant amount of frozen flood water in between

[Flooding in Potternewton Park in 2021]

The area around Potternewton floods because the drainage system is not able to cope with the amount of water after heavy rain. This creates surface water runoff leading to flooding of properties as well as flooding from the sewer network. Properties here were flooded in 2007 and 2010, there is also frequent flooding of highways and Potternewton Park. We’re working with Yorkshire Water to reduce the risk of flooding after heavy rain.

The areas that are most at risk of flooding are on Newton Road and to the southwest of the park.

What we’re doing to reduce the risk of flooding

a map of the parts of potternewton we are considering as part of our study highlighted

[A map of the area we are considering as part of our study]

We’re working with the Environment Agency and Yorkshire Water to assess the best way to reduce flooding.

Once we have identified any viable solutions, we will be consulting with local residents, landowners and the wider public on our plans. This consultation will take the form of an online survey on Commonplace, and face to face sessions with local residents, businesses and community groups. 

Contact us

To sign up to our mailing list, please contact FRM@Leeds.gov.uk and include the name of the scheme in the subject line of your request.

For any more information, please email us at FRM@leeds.gov.uk and include ‘Potternewton flood risk study'

Discover more

new public realm at Sheepscar Beck

Hybrid Ecologies: Creative Interpretation at Sheepscar Beck

There's a new engaging artwork coming to Sheepscar Beck, co-created by the local community and artist Katie Surridge, inspired by the hidden wildlife in our urban environment.

Posted:
Read More
xu8aodfe8hr0fptl5y38.jpg

Farnley Wood Beck Natural Flood Management scheme

Find out how we're delivering NFM measures to help reduce flood risk

Posted:
Read More
gvep3zm2flmwsikbjbup.png

Leeds Flood Alleviation Scheme Legacy Information

Posted:
Read More
A photo of completed flood alleviation works with an overlay of animated images

Sheepscar Beck Flood Alleviation Scheme Legacy Information

Find out more about the scheme to repair and sustain the existing level of flood risk in the area.

Posted:
Read More
sfhqrjgamblv5mvt2ax6.jpg

Leeds Flood Alleviation Scheme Murals

Information on the installation of two murals on the Leeds FAS control room buildings

Posted:
Read More
Illustration of a home and trees
Closed

Consultation - Flood Risk Management Strategy

Have your say on our draft Local Flood Risk Management Strategy

Project:Leeds City Council Flood Resilience
Flooding at the Meanwood Valley Urban Farm
Closed

Feedback on the Meanwood Valley Farm Demonstrator Site and Meanwood Rain Chain

A short survey to accompany the information given at the Meanwood Valley Farm Summer Fair

Project:Leeds City Council Flood Resilience
Illustration of a home and trees
Closed

Thorner Beck Flood Alleviation Scheme Preferred Option

Have your say on the preferred option for reducing flood risk to properties in Thorner from Thorner Beck

Project:Leeds City Council Flood Resilience
Sheepscar Beck FAS
Closed

Sheepscar Beck FAS

We aim to carry out repair works to sustain the existing level of flood risk in the area.

Project:Leeds City Council Flood Resilience

Stay Informed

Follow our projects to get notified of upcoming engagements and the latest project related news.