Waste Supporting Paper

This is a HTML friendly version of the waste supporting paper

Leeds Local Plan

Waste Supporting Paper

Executive Summary

This Outline Waste Needs Assessment (WNA) provides a high-level evidence base

on current and future waste management needs in Leeds up to 2042. It will inform

the new Leeds Local Plan (Regulation 18 draft) by identifying how much waste is

generated, what capacity exists to manage it, and where there are shortfalls or

surpluses in capacity now and at the end of the new Plan period.

The WNA covers all major controlled waste streams in Leeds, including Local

Authority Collected Waste (household and similar waste) (LACW), Commercial and

Industrial (C&I) waste, Construction, Demolition and Excavation (CDE) waste,

Hazardous waste, and Agricultural waste, and assesses requirements against

existing waste infrastructure. Other waste types such as wastewater sludge and lowlevel

radioactive waste are outside the scope of this assessment. This assessment

has been prepared using the West Yorkshire Combined Authority (WYCA) Waste

Capacity Model as the primary data source, alongside local knowledge, but it does

not constitute a detailed investigation using other datasets such as the Environment

Agency Waste Data Interrogator (WDI). Key terms used are defined in Appendix 6.

The findings presented should be seen as a starting point for dialogue, providing a

broad understanding of indicative capacity gaps and surpluses, and forming the

basis for public consultation. Comment and feedback from the waste management

industry, neighbouring authorities, and other stakeholders on the suggested

approaches and assumptions is especially welcomed to help refine the evidence

base and ensure that ultimately local waste planning policy is robust, deliverable,

and aligned with national and other local policy and strategies.

It is estimated that approximately 2.3 million tonnes of solid waste was produced in

Leeds in 2023. The largest proportions arise from construction, demolition and

excavation activities (c43% of the total) and from commercial and industrial (C&I)

sources (c40%). Local Authority Collected Waste (mainly household) waste makes

up around 14% of the total, with hazardous and agricultural wastes forming a small

remainder (c3% and <1% respectively).

Different growth and waste management scenarios have been developed as part of

this WNA. Under the scenarios modelled, projections indicate only modest growth in

overall waste arisings by 2042. Under a Median Growth scenario, total waste in 2042

is forecast at c2.4 Mt, while a Maximum Growth scenario yields c2.53 Mt (about 5%

higher). Figure 1 illustrates the projected 2042 arisings by waste stream under these

two scenarios. Notably, the difference between scenarios is most pronounced for

Construction/Demolition and Excavation wastes (reflecting higher assumed growth in

the maximum scenario), whereas household and hazardous wastes show very little

variation between scenarios.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 4 of 60

Figure 1: Projected waste arisings by 2042 under two scenarios (Median vs Maximum

growth).

Despite anticipated policy measures to reduce waste and increase recycling, it is

expected that Leeds will remain a major producer of waste within the region due to

its large population and it being an economic hub. The Plan area is broadly well

served with waste management capacity for recycling and energy recovery, but it is

estimated that there are significant capacity gaps in key areas as outlined below.

Recycling

There is extensive recycling capacity in Leeds (estimated at c2.7 million tonnes per

annum across all waste streams – see Table 1), which exceeds the forecast

quantities of waste needing recycling in 2042. In other words, there is an overall

surplus of recycling capacity in Leeds, particularly for LACW, C&I and C&D wastes.

This suggests net self-sufficiency in recycling these waste streams can be achieved

in Leeds, and is likely importing waste from outside to make full use of its recycling

facilities. However, one exception is organic (food/garden) waste treatment as there

is currently there is no significant composting or anaerobic digestion capacity within

Leeds, meaning any large-scale roll-out of separate food waste collections will rely

on facilities outside the Plan area or development of new capacity. Composting

capacity is identified as an area to keep under review (current arrangements for

garden waste involve contracts with external processors).

Other Recovery – Energy from Waste (EfW)

Leeds benefits from a major Energy from Waste facility (the Recycling and Energy

Recovery Facility (RERF) at Cross Green) with c200,000 tpa capacity dedicated to

LACW, plus additional commercial residual waste treatment capacity (e.g. production

of refuse-derived fuel and access to regional EfW facilities) amounting to c0.54 Mt.

2,900

988,016

272,500

706,100

83,393

346,586

3,285

1,030,731

295,894

766,720

86,999

348,560

AGR C&I CD E HAZ LACW

PROJECTED WASTE ARISINGS BY

2042 UNDER TWO SCENARIOS

Med Growth Max Growth

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 5 of 60

Capacity for residual waste treatment exceeds requirements for waste produced in

Leeds, resulting in a surplus. By 2042, with increased recycling, the Leeds RERF is

expected to have spare capacity, e.g. under median growth, residual LACW falls to

c118,000 tpa by 2042, well below the plant’s capacity. Both scenarios indicate a

surplus in energy recovery capacity for non-hazardous waste. This provides

resilience and opportunities to import residual waste from neighbouring areas.

Landfill (Disposal)

There is no non-hazardous landfill and no hazardous waste landfill capacity in

Leeds. Currently 100% of non-inert waste landfill needs in Leeds are met by

exporting waste to sites outside the Plan area. This represents a critical capacity gap

in achieving self-sufficiency for final disposal. However, it aligns with national policy

to reduce reliance on landfill – by 2035 no more than 10% of municipal waste should

be landfilled. Inert excavation waste disposal capacity is also insufficient: while there

are two inert landfill/recovery sites (at Britannia Quarry and Blackhill Quarry) in

Leeds accepting excavation and rubble, their combined remaining void is roughly 0.9

million tonnes, which is far below the forecast cumulative excavation waste that will

need management through to 2042. Even assuming most excavation waste can be

beneficially reused (e.g. in restoration or construction projects), there is a projected

shortfall of suitable void space in the order of several million tonnes. In summary,

there is a major shortfall in disposal capacity and so Leeds will remain dependent on

regional landfill and other deposit to land sites for the foreseeable future, especially

for residues that cannot be recycled or burned (e.g. asbestos, certain hazardous or

inert wastes).

Hazardous Waste Treatment

There are several permitted hazardous waste treatment facilities in Leeds which

handle wastes such as oils and chemicals, as well as some vehicle depollution

activity with a combined capacity of c30,000tpa. This covers only a portion of the

c80,000+ tonnes of hazardous waste arising in Leeds each year. By 2042,

hazardous arisings are projected to be c83,000 tpa (assuming modest growth). A

capacity gap for hazardous waste treatment is forecast in the region of 50,000 tpa –

meaning much of the hazardous waste arising in Leeds must continue to be handled

by specialist facilities elsewhere. No hazardous landfill capacity exists in Leeds, so

hazardous landfill requirements (e.g. for asbestos) are 100% met by exporting to

regional sites. This situation is common for most Waste Planning Authorities given

the high cost and specialist nature of hazardous waste infrastructure.

There is also an apparent surplus in hazardous waste transfer capacity (transfer

stations for sorting/aggregating hazardous wastes) relative to the hazardous waste

arising in Leeds.

The following summarises recommendations to address the above findings:

Plan for Capacity Gaps

The Local Plan should recognise the shortfall in local landfill and inert waste disposal

capacity and reflect the availability of capacity and plan for provision where it is

considered necessary. While new non-hazardous landfill in Leeds is unlikely (and

inconsistent with waste reduction targets), the plan can support alternative strategies

for residual waste, e.g. maximising diversion from landfill and working with

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 6 of 60

neighbouring authorities to ensure continued access to regional landfill capacity. For

inert excavation waste, the Council should consider allocating additional capacity

(e.g. extensions to existing inert landfill or identifying new sites for land reclamation

with excavated waste) to help close the gap for construction spoil management,

provided environmental safeguards are met.

Safeguard and Optimise Existing Capacity

Existing recycling and other recovery facilities in Leeds are critical assets that enable

net self-sufficiency in those areas. The Local Plan should include policies to

safeguard existing waste management sites from incompatible development or

closure. It should also support the full use of available capacity – for example,

encouraging commercial waste to be directed to local facilities (reducing exports)

and potentially allowing Leeds facilities to handle a share of other areas’ waste

where capacity surpluses exist, in line with the proximity principle.

Encourage New Capacity Where Needed

Where clear gaps are identified – notably for organic waste treatment (food/green

waste) and hazardous waste management – the Plan should support the

development of appropriate new facilities. For example, national policy requires

separate food waste collections and so local or regional anaerobic digestion or invessel

composting capacity will be needed. The Plan can include criteria-based

policies to facilitate such facilities in suitable locations (e.g. on industrial land), which

might offer regionally significant capacity. Similarly, if opportunities arise for

hazardous waste treatment capacity (or high-tech recycling of specific hazardous

waste streams), supportive policy within the Plan would help make such proposals

acceptable within Leeds, though it should be recognised that many hazardous

wastes will continue to be managed at a regional (not local) level due to economies

of scale.

Regional Cooperation

The Council should continue to engage with neighbouring authorities and regional

waste fora to address cross-boundary waste needs. A Duty to Cooperate approach

is vital, given the reliance on facilities beyond the Plan area boundary for certain

waste types arising in Leeds (and vice versa). A Statement of Common Ground on

waste planning within West Yorkshire (and potentially with areas receiving waste

requiring landfill waste from Leeds) is recommended to ensure that sufficient

capacity is available and mutually agreed upon throughout the plan period. This

includes cooperating on the provision of landfill, hazardous waste facilities, and

sharing surplus capacity such as energy-from- waste plants.

Policy Alignment with National Targets

Planning policies should be aligned with the circular economy and waste reduction

targets set by government. For example, policies should reflect the drive to recycle

65% of municipal waste by 2035 and to reduce landfilling to under 10%, as well as

the longer-term target to halve residual waste to 287 kg per person by 2042. Local

targets or monitoring indicators can mirror these. For example the Plan can require

space for separate storage of recyclables in new development and promote on-site

waste reduction in construction, and re-use of demolition materials.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 7 of 60

Monitoring and Flexibility

Given the uncertainties in waste forecasting, the WNA should be treated as a living

document. The Council should monitor waste arisings and capacity on an ongoing

basis (through annual monitoring reports and updates to the waste data interrogator

returns). If assumptions change, for example, if waste growth accelerates beyond

the ‘maximum’ scenario or if significant capacity is lost, the Council should be

prepared to update the needs assessment and adjust its plans. Flexibility can be

built into Local Plan policies to allow a rapid response to any significant changes in

waste management technology, legislation (e.g. new Extended Producer

Responsibility impacts) or infrastructure capacity. This adaptive approach will ensure

adequate waste management provision can be maintained in Leeds up to 2042 and

beyond.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 8 of 60

1. Introduction

Purpose and Scope

1.1 This report presents an Outline Waste Needs Assessment for Leeds City

Council, forming part of the evidence base for the new Leeds Local Plan (to 2042).

The purpose is to estimate current and future waste arisings in Leeds and to

compare these with existing waste management capacity, in order to identify any

capacity gaps or surpluses over the plan period. The assessment will inform local

plan policies on waste, including decisions on safeguarding existing facilities and the

need (if any) for additional waste infrastructure or site allocations. For definitions of

technical terms used within this report please see Appendix 6.

1.2 The WNA addresses all key solid waste streams for which the Council has

planning responsibilities, specifically:

• Local Authority Collected Waste (LACW): waste collected by or on behalf of

the Council, principally household waste.

• Commercial and Industrial (C&I) Waste: wastes generated by businesses,

offices, shops, factories and other industrial or commercial activities managed

by private sector arrangements.

• Construction, Demolition and Excavation (CD&E) Waste: materials from

building sites, civil engineering projects, roadworks etc. This includes rubble,

concrete, soil, stones and similar wastes arising from the construction and

demolition process. C&D waste (hard construction/demolition materials) is

sometimes distinguished from Excavation waste (mainly soils) where relevant,

as their management can differ.

• Hazardous Waste: wastes that are harmful to human health or the

environment (e.g. certain chemicals, asbestos, contaminated soils, oils, some

electrical waste). These require specialist treatment or disposal.

• Agricultural Waste: waste from farming and horticultural activities. Typically

this is a very small waste stream in an urban authority like Leeds, and much

of it is managed on-site (e.g. manure spreading) rather than entering the

waste management system.

1.3 Other waste streams including wastewater, sewage sludge, and low-level

radioactive wastes are excluded from this assessment.

1.4 This WNA includes estimates of current waste arisings (tonnages by waste

stream), forecasts of how those might change by 2042 under different scenarios, an

estimate of existing waste management capacity in Leeds (with capacities), and an

evaluation of whether there is enough capacity to manage an equivalent amount of

waste arising in Leeds within the Plan area (‘net self-sufficiency’) and whether there

will be a need to rely on capacity elsewhere.

Planning Context

National Policy

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 9 of 60

1.5 This WNA has been undertaken in accordance with national waste planning

policy and guidance. The National Planning Policy for Waste (NPPW, 2014) requires

Waste Planning Authorities to plan for sustainable waste management, including

identifying needs for facilities. The NPPW also highlights the need for planning

policies to support the delivery of waste infrastructure in line with the waste

hierarchy. Detailed guidance is provided in Planning Practice Guidance (PPG) on

how to assess waste needs, aiming for communities to take responsibility for their

own waste (proximity principle).

1.6 Key national strategies influencing this WNA include the Government’s Our

Waste, Our Resources: Strategy for England (2018) and subsequent policy updates.

These set ambitious targets in line with the EU Circular Economy Package, now

embedded in UK law. Notably, by 2035 at least 65% of municipal waste by weight

should be recycled, and no more than 10% of municipal waste should be landfilled.

There is also a commitment to ‘near elimination’ of biodegradable waste to landfill by

2028 – effectively phasing out landfilling of food, paper, and other putrescible wastes

to cut greenhouse gas emissions. More recently, the Environment Act 2021 led to a

statutory target to halve residual waste (excluding major mineral wastes) per capita

by 2042, which translates to a target of no more than 287 kg of residual waste per

person in 2042 (from a baseline of 574 kg in 2019). These targets underpin the drive

for greater recycling, composting and other recovery capacity, and imply a

diminishing role for landfill other forms of recovery such as EfW.

1.8 Several upcoming national policies will impact waste arisings and management

in Leeds as outlined below.

Consistency in Collections and Food Waste

1.9 From 2026, all English local authorities must provide separate weekly food waste

collections to households. This will significantly divert biodegradable waste from

residual waste streams into composting/anaerobic digestion (AD) treatment.

Extended Producer Responsibility (EPR) and Deposit Return Schemes (DRS)

1.10 The introduction of EPR for packaging in 2025 and a DRS for drinks containers

by 2027 is expected to reduce municipal residual waste (by an estimated c18% by

2035 compared to 2020 levels, according to Government analysis) by incentivising

recycling and waste reduction at source.

Plastic and Waste Export Bans

1.11 Changes in global markets and potential bans on exporting certain wastes (like

plastics) may require more domestic reprocessing capacity, affecting local facility

needs.

Local and Regional Context

1.12 There is an existing adopted ‘Natural Resources and Waste Local Plan’

(NRWLP) 2013 for Leeds, which sets out waste planning strategy to 2026. That plan

identified Leeds as the largest waste producer in West Yorkshire, generating an

estimated c2 million tonnes per year, with construction/ demolition waste as the

largest fraction. The vision was for ‘a zero waste, high recycling society’ – supporting

waste reduction, maximised reuse/recycling, and minimal landfill. Since 2013,

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 10 of 60

progress has been made in Leeds (e.g. opening of the RERF energy recovery

facility and improvements in LACW recycling rates), but some targets (like recycling

50% of household waste) remain challenging. The new Local Plan update extends to

2042, requiring a fresh assessment of waste capacity requirements in light of current

data and future changes.

1.13 Leeds is part of the West Yorkshire sub-region, collaborating with Bradford,

Calderdale, Kirklees, and Wakefield on strategic waste issues. A West Yorkshire

Combined Authority (WYCA) waste capacity model exists (used in this study) and

the authorities have historically cooperated on waste infrastructure (for example, the

residual LACW contract for Leeds also processes some waste from Bradford). Dutyto-

Cooperate discussions will ensure that any shortfalls in one area can be

addressed by capacity in another where appropriate. In particular, regional facilities

such as the Ferrybridge Multifuel energy-from-waste plant (in Wakefield) and

regional hazardous waste sites play a role in the wider strategic waste management

network.

1.14 Leeds City Council’s priorities, such as its Climate Emergency declaration and

goals to become carbon-neutral, also influence waste planning which can contribute

to these objectives. Diverting biodegradable waste from landfill (which produces

methane) and improving resource efficiency contribute to climate change mitigation.

National Waste Management Context – Policy and Targets

1.15 Waste management in the UK is guided by the waste hierarchy and an

increasing suite of targets aimed at moving towards a circular economy. The

following national policies and targets are particularly relevant to waste planning in

Leeds:

Waste Reduction and Recycling Targets

1.16 By 2035, recycle at least 65% of municipal waste and landfill no more than 10%

of municipal waste. These targets, derived from the Circular Economy Package and

now in the Waste (England and Wales) Regulations 2011 (as amended), set a clear

direction for local authorities to dramatically increase recycling rates (current

household recycling in Leeds is c38%) and virtually eliminate landfill for household

waste over the next decade. Higher recycling targets for specific material streams

(e.g. 70% recycling of packaging by 2030) are also being implemented through EPR

schemes.

Landfill Diversion

1.17 Achieving the near-elimination of biodegradable municipal waste to landfill by

2028 is a government commitment to prevent food, paper, wood, textiles and garden

waste from being landfilled, due to their greenhouse gas impacts. It implies separate

collection and treatment of these materials (e.g. recycling, composting, anaerobic

digestion, energy recovery) must be in place. The Leeds Waste Disposal Authority

will need to ensure infrastructure or contracts to handle collected food/garden waste

by this date.

Residual Waste Reduction

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 11 of 60

1.18 The Environmental Targets (Residual Waste) Regulations 2023 set a binding

goal to halve residual waste per capita by 2042 (vs 2019). For Leeds (with a

population approaching 850,000 by 20411), this means a steep reduction in the

quantity of waste needing final disposal or treatment. Achieving this will require not

only higher recycling but also significant waste prevention (through redesign, reuse,

etc.). The target equates to 287 kg or less of residual waste per person in 2042 –

which guides long-term strategy for waste minimisation in the city.

Climate Change and Net Zero

1.19 Waste policy is linked to climate goals – e.g., the Climate Change Committee

has recommended banning biodegradable waste in landfill by 2025 to cut methane.

The City Council’s Climate Emergency agenda reinforces the need for waste policies

that reduce emissions (e.g. capturing energy from waste, electrifying waste collection

fleets, etc.). National policy also pushes for Energy from Waste facilities to supply

heat (Combined Heat and Power) to improve efficiency.

Producer Responsibility and Resource Efficiency

1.20 New or expanded schemes for Extended Producer Responsibility (starting with

packaging in 2025), a Deposit Return Scheme for beverage containers (expected

2027), and product standards (for durability, repairability) all aim to reduce waste

generation or divert it to recycling. Over the plan period, these measures should

reduce certain waste streams (e.g. less packaging in residual waste) and change

composition (e.g. more source-separated recyclables).

1.21 In summary, the national policy context is one of driving waste up the hierarchy

– prevention, reuse, and recycling – and minimising landfill. The Leeds WNA

incorporates these trajectories by modelling scenarios with increasing recycling

performance and reducing residual waste.

Approach and Methodology

1.22 The WNA methodology follows established guidance (including Defra’s Waste

Needs Assessment guidance and the approach developed by the Yorkshire and

Humber Waste Technical Advisory Body), adapted to circumstances in Leeds. The

methodology comprises the five main steps described below.

1. Establish Current Waste Arisings (Baseline)

1.23 Determine how much waste of each type is currently produced in Leeds. For

non-LACW, the West Yorkshire Waste Capacity Model (WYWCM) data (2017

baseline) apportioned to Leeds based on relevant metrics (e.g. population or

economic activity) was used. For example, Leeds accounts for about 37% of West

Yorkshire’s C&I waste (using GVA as a proxy) and c48% of the sub-region’s C&D

waste (based on construction activity). These factors were applied to the West

Yorkshire totals to estimate Leeds-specific arisings values. Local Authority Collected

Waste was taken from actual Council data (e.g. 323,000 tonnes in 2021/22). The

baseline provides a starting point (around 2022) for each waste stream. (Appendix 1

details the derivation of baseline arisings and the apportionment factors used.)

1 https://observatory.leeds.gov.uk/wp-content/uploads/2022/06/JSA-Summary-Report-Oct-21-FINAL-

1-1.pdf

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 12 of 60

2. Project Future Waste Arisings (Growth Rates)

1.24 Apply growth assumptions to each waste stream to forecast how annual

arisings may change by 2042. Two growth scenarios were modelled:

• Median Growth Scenario: Assumes moderate growth reflecting historical

trends or central forecasts. For Leeds, this meant near-zero growth for

construction waste (0% p.a., per PPG recommendations for C&D) and

agricultural waste (0% p.a.), modest growth for LACW (c0.37% p.a., based on

recent household waste trends), and moderate growth for C&I and hazardous

waste (c0.33% p.a., aligned with the WYCA model’s median scenario).

• Maximum Growth Scenario: A higher growth outlook providing an upper

bound. This scenario assumes higher annual growth rates were assumed for

key waste streams (e.g. C&I waste at 0.5% p.a., LACW at 0.4% p.a.). For

C&D and Excavation waste, which had 0% in the median case, a cautious

growth of 0.33% p.a. was applied (recognising potential increases in

development activity). Even this ‘maximum’ scenario is relatively restrained

(for example, it uses 0.5% for C&I waste vs the WYCA model’s own high of

0.71%, on the rationale that 0.71% seemed excessive given current UK

economic forecasts). Both scenarios extend to 2042, ensuring the 15-year

horizon from plan adoption as required by NPPF.

1.25 These growth rates were used to calculate 2042 arisings for each waste type.

(Intermediate years can be interpolated but for this outline assessment the focus is

on requirements at the end of the Plan period.) The resulting forecasts are shown in

Table 2 in Section 3. In general, the maximum scenario yields only slightly higher

quantities than the median – reflecting that waste generation in Leeds is not

expected to grow dramatically, due in part to waste prevention efforts and economic

trends (more efficient resource use).

3. Define Future Waste Management Profiles (Management Scenarios)

1.26 Determine how the forecast waste in 2042 is likely to be managed by method

(recycled, composted, recovered, landfilled, etc.), taking into account future targets

and initiatives. Two management scenarios were considered for the end-state

(2042):

• Scenario 1: Achievement of Recycling Targets – This scenario assumes that

national recycling targets (65% municipal recycling by 2035) are met or

exceeded. By 2042, high recycling rates were assumed to have been

achieved for each waste stream e.g. 65% recycling for LACW, 75% for C&I

waste, 95% for C&D waste (consistent with current best practice in the

construction sector), and similarly ambitious values for other waste streams

(see Tables in Appendix 4). Residual wastes under this scenario are allocated

largely to energy recovery (EfW) with only a minimal landfill fraction (e.g. c1%

of LACW and C&I waste to landfill, essentially for contingency/disposal of

process rejects). This scenario reflects a policy-driven push to maximise

recycling.

• Scenario 2: Residual Waste Reduction Lead – This scenario is driven by the

2042 residual waste target (287 kg per person). It assumes even greater

waste reduction and recycling by 2042 to achieve the per-capita residual goal.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 13 of 60

In practice, for LACW this meant a recycling rate of c79% by 2042

(considerably above the 65% minimum) and corresponding deeper reductions

in residual waste. C&I waste was adjusted to a similar 79% recycling. The net

effect is less waste needing disposal than Scenario 1, albeit from a slightly

higher total waste arising (because this pairs with the maximum growth

scenario). Scenario 2 can be seen as a ‘high recycling, high growth’ scenario,

whereas Scenario 1 is ‘moderate recycling, moderate growth’. Table 3

(Section 3) details the percentage breakdown of the different types of

management of each waste stream under both scenarios.

1.27 Both scenarios incorporate national policy commitments such as 10% or less

municipal waste to landfill for and virtually eliminating biodegradable waste to landfill

by 2028 – effectively only a token landfill amount (around 1%) was modelled for nonhazardous

waste, to account for residues that cannot be otherwise recovered. For

C&D and Excavation waste, continued high rates of reuse/recovery (e.g. use of

excavated soils in restoration projects) were assumed, but acknowledged that a

portion (especially of Excavation soils) might still require disposal due to

contamination or lack of reuse opportunities.

1.28 Appendix 4 provides the detailed management profile assumptions and

justification for the chosen percentages, referencing national targets and local

performance data.

4. Assess Existing Waste Management Capacity

1.29 Capacity of current waste management facilities in Leeds and the waste types

they handle was primarily based on the WYCA Waste Capacity database, which lists

all permitted waste sites in Leeds (around 100 facilities) and their capacities by

broad management category (see Appendix 2). For landfill capacity, the Environment

Agency landfill void data (2023) and local knowledge was utilised.

1.30 An important part of this step was to classify each facility’s capacity by waste

stream and management method, to enable comparison with the requirements from

step 3. Some facilities handle multiple waste streams or have vague permit

descriptions, so a number of assumptions were made (documented in Appendix 2).

For example, sites handling both LACW and C&I waste were split 50:50 in capacity

between those waste streams (unless specific data indicated otherwise).

• Transfer stations (with no end disposal on-site) were generally treated as

contributing to recycling capacity (on the premise that they facilitate waste

going on to recycling) – except for hazardous waste transfers, which were

kept separate.

• ‘Treatment’ facilities (a generic term) were assumed to equate to recycling if

they produce usable outputs, and vehicle depollution sites were counted

under hazardous waste recycling (recovering scrap metals etc.).

• The capacity values in the database often reflect permitted maximum

throughput. In reality actual throughput can be lower. The permitted (or

design) capacities were applied as the best available measure, but it should

be noted this may overstate practical capacity in some cases.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 14 of 60

1.31 After assigning each site’s capacity to waste streams and management

methods, these were aggregated to derive total capacity values (tonnes per annum,

or tonnes for landfill void) by stream and method. Table 1 in Section 4 provides a

summary of the existing waste management capacity in Leeds by waste stream and

management type, based on this analysis. In simple terms, there is substantial

capacity for recycling (metals recycling yards, material recovery facilities, aggregate

recycling, etc.), significant EfW capacity (one major plant and some smaller

facilities), no active non-hazardous landfill capacity, finite inert landfill/beneficial

reuse capacity (two sites as mentioned), one hazardous treatment facility, and a few

hazardous waste transfer stations.

5. Identify Capacity Gaps or Surpluses

1.32 Finally, the future waste management requirements (from step 3’s scenarios)

were compared with the current available capacity (from step 4) for each waste

stream and management category. This identifies where Leeds would have a

shortfall (‘capacity gap’) – meaning the forecast waste needing management

exceeds the capacity in Leeds – and where there would be a surplus (capacity

exceeds the need, implying Leeds could import waste or has more than enough

capacity). The analysis was done for both Scenario 1 and Scenario 2 at 2042 to see

how different assumptions might change the balance. Gaps/surpluses are generally

expressed in tonnes per annum (tpa) for throughput capacity or total tonnage for

landfill. A negative (-) value indicates a gap (deficit), while a positive value indicates

a surplus (excess capacity). For example, if there is 500,000 tpa of recycling

capacity in Leeds but the modelled requirement is 450,000 tpa, that would show as

+50,000 tpa (surplus). Conversely, zero capacity with 100,000 tpa need would be -

100,000 tpa (gap).

1.33 It is important to emphasise that these values are broad, indicative estimates.

Spurious precision has been avoided by rounding results to the nearest hundred or

thousand tonnes and should be interpreted as orders of magnitude. The reliability of

the gap analysis is constrained by data accuracy (e.g. any overestimation of capacity

would understate a gap) and by the assumptions in the scenarios (e.g. if recycling

performance is lower than assumed, residual waste needs would be higher).

Nonetheless, this step highlights the key areas where planning intervention may be

required (gaps) and where Leeds has strength or flexibility (surpluses). The findings

are presented in Section 5, including a summary table of surpluses/gaps by

management type.

1.34 This methodology aligns with national guidance (PPG) which suggests using a

mix of extrapolation, trend analysis, and scenario testing to predict future waste

needs, and anticipates consideration of strategic capacity beyond Plan areas.

Assumptions and caveats are clearly noted where relevant in this report, and further

detailed calculations are provided in the Appendices for transparency. In particular,

given the ‘outline’ nature of this WNA, certain limitations (e.g. lack of up-to- date site

throughput data, or not fully accounting for unrecorded waste like that managed

under exemptions or re-used on site) mean the results should be used with caution.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 15 of 60

Overview of Key Waste Streams in Leeds

1.35 The following provide information on the relative scale and nature of the main

waste streams in Leeds:

Construction, Demolition and Excavation (CD&E) Waste

1.36 This is the single largest source of waste in Leeds. Based on the baseline

estimates, CD&E waste (including soils) accounts for roughly 43% of all waste

generated in Leeds. In 2022, this is estimated to be about 979,000 tonnes (272,500t

of C&D waste materials and 706,100t of excavation soils). This waste stream comes

from construction sites, infrastructure projects, building demolitions, and excavations

(foundations, utilities, etc.). A large proportion of C&D waste (e.g. bricks, concrete,

metals) is already recovered or recycled by the industry – often crushed for

aggregate or sent for off-site recycling. Excavation waste (mostly clean spoil) can be

reused in landscaping or quarry restoration. Leeds, as a growing city, will continue to

produce high volumes of CD&E waste, but much of it is inert material. The

management focus is on reusing this material beneficially and providing enough sites

for any excess to be deposited (as inert fill) without causing environmental harm.

CD&E waste is usually non-hazardous (except certain components like asbestos in

demolition waste).

Commercial & Industrial (C&I) Waste

1.37 This is the next largest contributor at around 40% of total waste arising in

Leeds, estimated to be about 930,000 tpa currently. It includes a broad range of

wastes from businesses – for example, packaging waste, food waste from

restaurants, paper/card from offices, process waste from factories, and so on. The

composition of C&I waste is heterogeneous; a significant portion can be recycled

(paper, cardboard, plastics, wood, metals) if segregated. Unlike household waste,

C&I waste management is largely market-driven (private contracts). Leeds, being an

economic centre with numerous industries, generates substantial C&I waste. Trends

affecting C&I waste include economic growth, changes in manufacturing processes,

and waste prevention efforts by businesses. Commercial wastes may be managed

alongside LACW at the same facilities (e.g. a commercial skip of general waste

might end up at the same energy-from-waste plant as household waste). In Leeds, a

large quantity of C&I waste recycling is handled by scrap yards, material recycling

facilities and specialist contractors present in the city.

Local Authority Collected Waste (LACW)

1.38 This waste stream is most visible to residents, though it forms only about 14%

of total waste by weight. In 2021/22, approximately 323,000 tonnes of LACW was

collected in Leeds. This includes household waste (residual black-bin waste,

kerbside recyclables, garden waste, household bulky items, etc.) as well as some

commercial waste collected by the Council (e.g. from schools or businesses that use

Council trade waste services). LACW composition is roughly: c55% household

residual waste (much of which is organic or recyclable material); c20% collected

recyclables (paper, glass, plastics, metals); c15% garden waste; and the rest from

services like street sweepings and bulky waste. Leeds has made strides in diverting

waste from landfill by sending residual waste to the RERF for energy recovery and

increasing recycling to about 38%. Still, a large fraction of LACW is not recycled.

With upcoming policies like universal food waste collection, the composition will

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 16 of 60

change (food will shift from residual to an organic waste stream). LACW tends to

grow in line with population, but waste prevention campaigns and lighter- weight

packaging have kept growth low.

Hazardous Waste

1.39 Hazardous waste is a small fraction (c3%) of waste arising in Leeds, but it

requires special attention due to its nature. c77,000 tonnes of hazardous waste is

produced annually in Leeds. This includes a wide range of materials e.g.

contaminated soils from brownfield sites, asbestos materials, industrial solvents and

chemicals, waste oils, lead-acid batteries, clinical wastes, certain electronic wastes,

and so on. Some hazardous wastes are generated by households too (like paint,

pesticides) but in small quantities. The majority is from commercial/industrial

activities (for example, a chemical plant or hospital waste incinerator ash). Because

hazardous waste facilities are specialist and relatively small in number, a lot of

hazardous waste produced in Leeds is exported for treatment or landfill (e.g. stable

non-reactive hazardous waste to dedicated landfills in other areas, or waste oils to

recovery facilities). The hazardous waste stream in Leeds is not expected to grow

significantly; it may even decline if cleanup of contaminated sites is completed and

as regulations phase out certain hazardous substances. However, managing legacy

hazardous materials (like asbestos from building refurbishments) will still require

capacity. Ensuring Leeds has access to regional hazardous waste infrastructure (or

developing more local capacity for certain hazardous streams) is part of planning for

this waste type.

Agricultural Waste

1.40 Agriculture is a minor land use in Leeds (some farms on the outskirts).

Agricultural waste (excluding manure used on farms) is estimated at only 2,900 tpa (

<1% of total waste). These wastes could include farm plastics, agrochemical

containers, etc., much of which are handled by specialist take-back schemes. Given

its negligible scale and the likelihood that farmers deal with many wastes on-site or

via niche services, agricultural waste does not drive major capacity needs for Leeds.

It is noted for completeness, but no capacity gaps are identified specific to

agriculture (other than that agricultural waste can generally be handled at C&I or

hazardous waste facilities depending on the type).

1.41 In summary, CD&E waste and C&I waste dominate waste arisings in Leeds,

and thus the capacity for recycling aggregates, managing excavation soils, and

processing commercial waste streams is crucial. LACW, while smaller in tonnage

must meet clear recycling and diversion targets. Hazardous waste, though small in

quantity, poses unique challenges that typically rely on regional solutions.

Agricultural waste is minimal and has no significant impact on capacity planning.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 17 of 60

2. Principal Data Sources

2.1 This WNA has been prepared using several key data sources which are

described below.

2.2 West Yorkshire Combined Authority Waste Capacity Model (WYWCM)

This is a Microsoft Access database originally developed in 2016 by WYCA to

assess waste arisings and capacities for each of the West Yorkshire authorities. It

provides baseline (2017) tonnages for each waste stream at a local planning

authority level and includes a comprehensive list of waste management facilities

(with their permit details and capacities) in the sub-region. The WYWCM was used

as the starting point for both arisings (apportioning West Yorkshire totals to Leeds –

see Appendix 1) and capacity (filtering the database for sites in Leeds (see Appendix

2)). The model’s in-built scenarios were not fully relied on (they include obsolete

growth rates and targets), but it was an important source of raw data. NB. The model

doesn’t cover certain wastes (like sewage sludge or radioactive waste).

Environment Agency Waste Data Interrogator (WDI)

2.3 The EA’s Waste Data Interrogator is an annual dataset detailing waste

movements (by origin, destination, tonnage, and waste type) for permitted facilities.

The 2021 WDI was utilised to derive a value for residual waste arisings which was

used to inform the Scenario 2 management profile. The WDI was also used to crosscheck

baseline values. The 2022 WDI indicated around 2.1 million tonnes of waste

from Leeds was handled at EA permitted sites, which gave confidence that the

estimated total baseline (2.29 Mt) is in the right order. While the WDI is

comprehensive, it has limitations as some site returns have errors or use broad

waste codes, and it doesn’t capture unpermitted or activity at exempt sites.

WasteDataFlow (WDF)

2.4 This is the national database for local authority collected waste statistics. Data on

Leeds City Council’s LACW tonnages, recycling rates, disposal routes, etc., were

derived from WDF (e.g. for 2021/22, LACW tonnages by material). WDF was used to

ensure the LACW baseline is exact. WDF also provides information on current

performance that underpins the growth/recycling scenarios (for example, knowing

the current recycling rate helps in projecting to future targets). WDF is very reliable

for the LACW stream and is the source for all local authority reported waste KPIs.

Environment Agency Landfill Void Data

2.5 The EA publishes annual data for remaining landfill capacities for each permitted

landfill. 2023 data was used for the Blackhill Quarry landfill which showed this had

501,086 m³ of void remaining at end 2023. Britannia Quarry capacity is uncertain – it

has permission to be filled to original ground levels with inert waste, but no

volumetric figure was readily available; Council officer insight suggests it could take

several hundred thousand tonnes, but activity there has been limited recently. The

EA data confirmed that there are currently no active non-hazardous or hazardous

landfill voids in Leeds.

Leeds City Council site intelligence

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 18 of 60

2.6 Council officers provided updates on any new facilities or changes not yet

reflected in EA databases. For example, if a waste site recently expanded or closed,

or if a permit was granted in 2023 outside the EA 2022 datasets, then this

information was taken into account.

2.7 Operators will have a chance to validate capacity assumptions during

consultation, but at this outline stage local knowledge has been used where

available (e.g. adjustments to capacity where double-counting was suspected in the

database, or reclassification of a misidentified site such as the BW Skip Hire site,

which the WYCA database listed under an incorrect category and was corrected as a

C&D waste recycling facility).

2.8 Combining these sources has helped ensure consistency, for example, the

baseline total arisings from the apportionment method was compared against the

WDI recorded tonnage for Leeds waste in the same year, to check for large

discrepancies (they were within c10%, which is acceptable given some wastes are

not captured in WDI).

Data Limitations

• The WYCA capacity data lacks a user guide, and capacities may not always

represent usable throughput. It has been assumed that permitted capacity

equals actual, which may result in an overestimate in some cases.

• There may be overlap between facilities (e.g. one site handling multiple waste

codes could be counted in multiple categories). Each site’s capacity was

allocated to a primary function to avoid double counting, but some judgement

was involved.

• Some waste arisings are not recorded (exempt sites managing <50,000 tpa of

inert waste, on-site reuse under the DoWCoP, fly-tipped waste, etc.). These

could mean actual waste generation is higher than reported, but the capacity

analysis inherently focuses on permitted infrastructure, so as long as those

exemptions don’t strain capacity, this is not considered a significant issue.

2.9 By using multiple data sources, confidence in the assessment was improved. For

example, knowing the 2022 AMR recorded 2.1 Mt of waste handled in Leeds

suggests that the estimate of c2.29 Mt generated is ‘in the right ball park’ (the slight

difference could be accounted for by exports or timing). It can therefore be said that

the data underpinning this high level WNA is sufficiently robust.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 19 of 60

3. Current Waste Arisings and Capacity Overview

3.1 This section provides an overview of waste arisings in Leeds used as a baseline

and a summary of existing waste management capacity in the Plan area.

Baseline Waste Arisings

3.2 Using the methodology described, baseline annual waste arisings for Leeds were

estimated. Table 1 below summarises the baseline tonnages by waste type:

Table 1: Estimated Annual Waste Arisings in Leeds

Waste type

2017 West

Yorks Arisings % Leeds

Leeds

Arisings

Leeds

Rounded

Arisings

Agricultural 10,261 28.70% 2,945 2,900

C&I 2,472,581 36.80% 909,910 909,900

C&D 571,447 47.70% 272,580 272,500

Excavation 1,480,248 47.70% 706,078 706,100

Hazardous 208,731 36.80% 76,813 76,800

LACW N/A N/A 323,059 323,100

Total 2,291,300

3.3 Key points from the baseline data are as follows:

• c2.3 million tonnes of waste is produced in Leeds each year. This confirms

Leeds as one of the largest waste producers in the region (as expected given

its population and economic size).

• Construction, Demolition and Excavation (CD&E) waste dominates, at roughly

43% of the total (272,500 + 706,100 = 978,600 tonnes). This reflects the

ongoing construction activity in the Plan area. Within CD&E, excavation (soils)

is particularly large – almost three-quarters of CD&E tonnage. However, these

materials are largely inert.

• Commercial & Industrial waste is the second-largest category at c910,000t

(about 40%). It covers a vast range of waste streams, from manufacturing

scrap to retail packaging.

• LACW at 323,100t forms a significant but smaller share (around 14%).

• Hazardous waste (76,800t) is relatively small in tonnage (c3%) but includes

some high-cost management items. A notable portion of this is contaminated

soil and asbestos from redevelopment sites, as well as industrial process

wastes.

• Agricultural waste is negligible in Leeds (c2,900t), as might be expected for an

urban area.

3.4 The Leeds Authority Monitoring Report 2022/23 corroborated these proportions,

noting that construction, demolition and excavation waste and C&I waste are the

major contributors, while municipal waste is a quarter or less. (The AMR indicated

‘municipal’ around 25% of waste, which likely counted some overlap or a different

definition).

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 20 of 60

3.5 Overall, the baseline confirms that efforts to manage waste in Leeds must pay

particular attention to the large quantities of CD&E and C&I waste. It also highlights

opportunities, for example, the large quantity of excavation waste suggests potential

for reuse in restoration projects.

Existing Waste Management Capacity in Leeds

3.6 There is a broad range of waste management facilities in Leeds. Based on the

WYCA database and updates, Table 2 below presents a summary of the estimated

existing waste management capacity in Leeds by waste stream and management

method. This essentially catalogues how much waste could be managed within

Leeds in each category per year (for treatment) or in total (for landfill void).

Table 2: Estimated Existing Waste Management Capacity in Leeds

Source: WYCA waste capacity model and EA landfill database.

Waste

Stream

Recycling2

(Tpa)

Compost EFW

(Tpa)

Beneficial

Deposit

(Tonnes)

Non Haz

Landfill

(T)

Haz

Landfill

(T)

Haz

waste

TFS

(Tpa)

Haz

waste

treat’t

(Tpa) (Tpa)

Agricultural N/A3 0 N/A N/A N/A N/A 0 0

C&I 1,238,805 40,0004 434,100 0 0 0 0 0

C&D 427,929 0 110,513 0 0 0 0 0

Excavation 0 0 0 398,818 501,086 0 0 0

Hazardous 103 0 0 0 0 0 21,559 30,150

LACW 1,040,931 14,339 200,000 0 0 0 0 0

Total 2,707,768 54,339 744,613 899,9045 0 0 21,559 30,150

3.7 Table 2 shows the following:

Recycling Capacity

3.8 It is estimated that there is a total of over 2.7 million tonnes per annum of

recycling capacity in Leeds (LACW, C&I, and C&D wastes). This includes major

metal recyclers, the City Council’s material recovery facility (MRF) for dry

recyclables, several private commercial waste MRFs, aggregate crushing/recycling

sites for C&D waste. The largest contributions are in LACW (the 1.04 Mt value

includes the input capacity of the RERF’s front-end mechanical pre-treatment which

can recover recyclables, plus transfer stations handling recyclable materials, etc.)

and in C&I waste (1.24 Mt, which likely includes scrap metal yards with large

throughput capacity). This capacity exceeds current arisings – suggesting a surplus,

2 Recycling includes material recycling facilities, inert waste recycling, and any treatment producing

recovered materials.

3 N/A = not applicable (stream typically managed within other categories)

4 This relates to a single Yorkshire Waste Service AD facility managing sewage sludge which

currently cannot be utilised for composting green or food wastes from other sources.

5 Beneficial Deposit refers to capacity for using inert material in restoration or land reclamation

(including inert landfill). The total capacity includes the tonnage identified within ‘Non Haz Landfill’

category as this capacity relates to inert excavation waste used for restoration of non haz landfills.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 21 of 60

although ‘excess’ capacity is likely utilised to manage waste arising in other areas.

For example, metal recyclers in Leeds might be treating metal scrap from across

West Yorkshire, not just Leeds. Nonetheless, it indicates Leeds is well supplied with

recycling infrastructure. The C&D waste recycling capacity (427,929 tpa) is also

notable – this includes a few large construction and demolition waste recycling

operations which can process construction waste into recycled aggregates.

Organic Waste/Composting

3.9 Table 2 shows 54,339 tpa in Leeds. However, 40,000tpa under this category

relates to a single Yorkshire Waste Serviced AD facility used for managing sewage

sludge which is therefore an ‘in-house’ facility that cannot contribute to composting

green or food wastes from other sources. The Council currently sends collected

garden waste to a composting site in Bradford. Food waste is not yet separately

collected (though it is planned), so it currently goes to the RERF (EfW). This lack of

local organics capacity suggests an opportunity to develop a facility in the future

(especially in light of imminent separate food waste collection requirements) or rely

on facilities in other areas.

Energy from Waste (EfW) Capacity

3.10 The Leeds RERF (operated by Veolia) contributes the bulk of the 200,000 tpa

for LACW. The 434,100 tpa listed for C&I waste likely represents capacities at

facilities like RDF production or merchant EfW accessible to commercial waste

produced in Leeds. Also, 110,513 tpa for C&D waste corresponds to capacity to

incinerate waste wood or other combustibles from construction (possibly at biomass

plants or co-incineration). In total, around c745,000 tpa of EfW capacity exists that

could handle residual waste produced in Leeds. This far exceeds the residual waste

currently produced in Leeds (c400,000 tpa across all waste streams), highlighting a

surplus in residual waste treatment capacity. This is consistent with the fact that the

RERF often operates below full capacity managing just waste from Leeds and also

manages waste from other areas. It’s also worth noting Leeds is within reasonable

transport distance of large residual waste facilities outside of the Plan area such as

energy recovery at Ferrybridge.

Landfill and Inert Fill

3.11 There is no non-hazardous or hazardous landfill capacity in Leeds thus 100% of

that need is met by exporting waste. The only disposal capacity is for inert waste at

Blackhill Quarry which has c0.5 million tonnes (or m³) void remaining. Britannia

Quarry can accept inert waste for restoration (capacity not formally quantified, so an

estimate of c0.4 million tonnes has been included). Combined, roughly 0.9 million

tonnes of inert waste capacity remains. In context, c0.7 million tonnes of excavation

waste is estimated to be produced in Leeds each year, so this void would be filled in

less than two years if all excavation waste was managed in Leeds. In practice much

excavation waste is traditionally reused on development sites (under exemptions) or

goes to other sites in the region, so the actual fill rate is slower. But this emphasises

that inert deposit to land capacity is a scarce finite resource locally.

Hazardous Waste Management Capacity

3.12 There appear to be several hazardous waste treatment facilities in Leeds.

There are also some hazardous waste transfer stations (with a combined throughput

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 22 of 60

capacity around 21,559 tpa), which consolidate hazardous wastes for shipment

elsewhere. A very small capacity (103 tpa) is noted under hazardous recycling – this

could be the result of classifying a vehicle depollution site as ‘hazardous waste

recycling’ (since end-of-life vehicles are hazardous until depolluted). In effect,

hazardous waste handling in Leeds is limited, and anything beyond c30k treatment

or any need for hazardous landfill has to be dealt with beyond the Plan area.

3.13 In summary, the existing waste management capacity profile in Leeds is

characterised by excess capacity in recycling and other recovery, and deficient

capacity in final disposal and certain specialist treatments. The city hosts many

private waste companies that provide capacity well above what the city alone

requires for recycling metals, construction materials, etc. Conversely, the deliberate

policy shift away from landfill means there is no non-hazardous waste landfill

capacity in Leeds which is a capacity gap addressed by using facilities in other

areas. The inert waste void capacity, while currently adequate in the short term, is

insufficient long-term if all excavation waste produced in Leeds were to be managed

at dedicated land disposal sites in the Plan area.

Caveats on Capacity Data

3.14 It should be noted that the above capacity values, particularly the large ones for

recycling, are likely upper limits. For example, the listed 1.04 million tpa ‘LACW

recycling’ capacity might include the maximum throughput of several transfer

stations or MRFs that in practice handle far less. The actual operational capacity (or

throughput in recent years) could be lower. Likewise, some facilities counted under

C&I waste recycling may not currently operate at full capacity. The implication is that

while there appears to be a large surplus, available capacity in practice might be

somewhat less. Nonetheless, the scale of surplus is such that even if halved, there

would likely be sufficient capacity to meet requirements for recycling (not including

composting) waste arising in Leeds.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 23 of 60

4. Assessing the Waste Management Capacity Gap in Leeds

4.1 Using the information on future waste arisings (demand) and existing capacities

(supply), capacity gaps or surpluses likely by 2042 can be determined. The position

is considered in terms of net self-sufficiency and an analysis by waste stream is

provided. Two scenarios – Median Growth with Recycling Targets (Scenario 1) and

Maximum Growth with Residual Reduction (Scenario 2) – are compared to assess

the sensitivity of the gaps to different assumptions.

Principle of Net Self-Sufficiency

Net self-sufficiency means having enough capacity within the Plan area to

manage an amount of waste equivalent to that generated within the area. The

principle takes account of waste moving across Plan area boundaries as part

of normal commercial arrangements. Net self- sufficiency is achieved if

exports are balanced by imports or unused local waste capacity.

4.2 The current position with regard to net self sufficiency for different management

capacities is as follows:

Recycling and Other Recovery

4.3 Leeds is currently net self-sufficient or better. It has surplus capacity and most

likely imports waste for recycling/EfW.

Landfill

4.4 Leeds is not self- sufficient for landfill. Waste requiring landfill is essentially

exported for management and there are no sites which can receive waste from

elsewhere.

Hazardous Waste

4.5 Leeds is not self-sufficient for final hazardous waste treatment/disposal with the

majority being exported. There are facilities in Leeds which may treat some waste

from other areas but more hazardous waste is exported from Leeds for management

than is imported. In terms of transfer, capacity in Leeds might handle some waste

from other areas (e.g. regional hazardous waste contractors in Leeds are likely to

serve clients beyond Leeds), which could make Leeds a net importer.

Inert Waste to Land

4.6 There is some inert waste void capacity in Leeds and likely imports some inert

waste from adjacent areas to those sites (likely when contractors find it convenient if

a site they are working is in relatively proximate. However, inert waste is likely

exported from Leeds to other sites (if those are closer to a construction project or

cheaper). On balance, given the scale of construction in Leeds, it’s likely more inert

waste is exported from Leeds than is imported.

Conclusion on Net Self-Sufficiency

4.7 Leeds can be considered net self-sufficient for waste management needs except

in the categories of final disposal (landfill) and certain hazardous waste operations.

This is similar to many urban authorities which have high levels of processing

capacity but are reliant on strategic landfill in other areas.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 24 of 60

Future Waste Management Requirements by Waste Stream

4.8 Using the forecast arisings and assumed management profile from Section 3 (for

Scenarios 1 and 2), the quantity of waste requiring each type of management in

2042 for each waste stream were calculated. These ‘requirements’ were then

compared to available capacity in Leeds in that category (from Section 3) to find

gaps or surpluses. The results of this exercise are shown in the Tables 3 and 4

below.

4.9 Note that in these tables, values shown in green are surpluses and values shown

in red are shortfalls (gaps).

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 25 of 60

Table 3 Estimated Waste Management Capacity Gaps/Surpluses at 2042 (Median Growth - Recycling Targets Lead scenario)

Waste

Stream

Recycling

(Tpa)

EFW (Tpa)

Beneficial

Deposit (T)

Non Haz

Landfill (T)

Haz

Landfill (T)

Haz waste

TFS (Tpa)

Haz waste

treatment

Compostg

(Tpa) (Tpa)

Agricultural6 N/A N/A N/A

see total

below

see total

below

0 0 0

C&I 498,000 197,000 0

see total

below

see total

below

0 0 40,000

C&D 169,000 100,00 0

see total

below

see total

below

0 0 0

Excavation -35,300 0 -10,500,000

see total

below

see total

below

0 0 0

Hazardous 100 0 0

see total

below

see total

below

21,600 -49,000 0

LACW 815,600 82,200 0

see total

below

see total

below

0 0 14,300

Total 1,447,400 379,200 -10,500,000 -1,001,000 -112,300 21600 -49,000 54,300

6 Agricultural waste management capacity gaps have not been separately identified as it is assumed the small quantities arising for management off site

would be managed at sites managing C&I and C&D waste.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 26 of 60

Table 4 Estimated Waste Management Capacity Gaps/Surpluses at 2042 (Maximum Growth - Residual Waste Target Lead scenario)

Waste

Stream

Recycling

(Tpa)

EFW

(Tpa)

Beneficial

Deposit (T)

Non Haz

Landfill

(T)

Haz

Landfill

(T)

Haz

waste

TFS

(Tpa)

Haz waste

treatment

Composting

(Tpa) (Tpa)

Agricultural7 N/A N/A N/A

see total

below

see total

below

0 0 0

C&I 424,500 228,000 0

see total

below

see total

below

0 0 40,000

C&D 147,000 98,600 0

see total

below

see total

below

0 0 0

Excavation -38,300 0 -11,483,000

see total

below

see total

below

0 0 0

Hazardous 100 0 0

see total

below

see total

below

21,600 -52,500 0

LACW 766,700 130,600 0

see total

below

see total

below

0 0 14,300

Total 1,300,000 457,200 -11,483,000

-

1,024,000

-129,000 21,600 -52,500 54,300

7 Agricultural waste management capacity gaps have not been separately identified as it is assumed the small quantities arising for management off site

would be managed at sites managing C&I and C&D waste.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 27 of 60

4.10 The capacity gap findings for each waste stream are described and discussed

below.

Local Authority Collected Waste (LACW)

4.11 LACW in 2042 – projected arisings:

- Scenario 1 (median growth): c346,500 tonnes.

- Scenario 2 (max growth): c348,600 tonnes (virtually the same, as growth

rates differ only slightly).

4.12 This is only a modest increase from c323,000t in 2022, due to low annual

growth (0.3–0.4%). This reflects assumptions of only a slight rise in waste per

household, offset by prevention measures (e.g. lighter packaging, etc.).

4.13 Management profiles at 2042:

- Scenario 1: 65% recycling by 2042 (this aligns with achieving the 2035 target

and holding that level). The remaining 35% goes to residual treatment

(assumed c34% to EfW, 1% to landfill). Also included in ‘recycling’ is

composting of organics (the 65% includes food/garden waste recycling).

- Scenario 2: 79% recycling by 2042. This ambitious level comes from driving

down residual waste to meet the 287 kg per person target. Residual LACW

would then be c21% (20% to EfW, 1% to landfill).

4.14 Forecast Requirements:

- Scenario 1: c225,000t recycled/composted; c118,000t residual to EfW;

c3,500t to landfill.

- Scenario 2: c275,000t recycled/composted; c70,000t residual to EfW; c3,500t

to landfill.

4.15 Capacity vs Requirement (LACW):

- Recycling/Composting: Current LACW recycling capacity is c1,041,00 tpa

(which included transfer). Even if some is discounted as transfer, it is

estimated that capacity is well in excess of requirements e.g. to compost

maybe 40kt of organics (food and garden) and process c230kt of dry

recyclables (in scenario 2’s worst-case need c275kt), the 1.04Mtpa capacity

would ensure targets are met. In fact, a surplus of around 750kt+ tpa is

suggested. This surplus could allow handling of more material (and indeed

likely includes capacity not specifically needed for LACW with some facilities

counted also serving the C&I waste stream). No gap – large surplus.

- N.B Separate food waste is 20ktpa and there is currently no capacity for

managing this waste stream in Leeds. A capacity gap in local LACW

composting therefore exists, but for the high-level assessment, since overall

recycling capacity is large, the model treated it as not a shortfall (the need for

food waste treatment may be met by capacity in other areas).

- EfW: LACW EfW capacity = 200,000 tpa at the RERF. Scenario 1 needs

c118ktpa, Scenario 2 requires c70ktpa. So surplus of 82ktpa to 130ktpa would

exist. This surplus may be utilised by other wastes e.g. commercial waste. No

gap.

- Landfill: LACW landfill requirement in 2042 is c3–4kt. Capacity = 0. Landfill

requirements for LACW are added to the general non-hazardous landfill gap

The scenario tables show that over the Plan period there is a combined

cumulative non-hazardous landfill gap of -c1,001,000t. This gap may not be

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 28 of 60

sufficient to make the development of a new landfill site viable and so there

will be reliance on other areas or development of a larger strategic site.

Implications for LACW

4.16 Residual LACW arisings in Leeds, and that requiring recycling, can largely

easily be managed at existing facilities provided they remain operational to 2042 e.g.

the RERF’s current contract runs into the 2030s and so if the life is not extended

alternatives will be required. In any event the Plan should seek to safeguard these

facilities and avoid their encroachment by incompatible development nearby. There

is a relatively small annual landfill requirement that without the development of new

capacity could not be met within the Plan area, however the requirement is not

sufficient by itself to make such a development viable. Therefore, no new capacity is

needed specifically for LACW aside from possibly an organics processing solution

(which might be addressed via a contract rather than a facility in Leeds).

Alternative assumptions

4.17 LACW only achieved 55% recycling (short of target) then residual to EfW would

be c45%. That would be c155kt residual but RERF can manage 200kt so there

would still be adequate capacity.

Commercial and Industrial (C&I) Waste

4.18 C&I waste in 2042 – projected arisings:

- Scenario 1: c988,000 tonnes.

- Scenario 2: c1,031,000 tonnes.

These are increases from the c909,900t baseline via growth of 0.33%p.a. and 0.5%

p.a. respectively. C&I waste remains the largest waste stream by 2042.

4.19 Management profiles at 2042:

- Scenario 1: 75% recycling; 24% EfW; 1% landfill.

- Scenario 2: 79% recycling; 20% EfW; 1% landfill (aligned with residual waste

reduction scenario, pushing recycling a bit higher).

4.20 Forecast Requirements:

- Scenario 1: c741kt recycled; c237kt to EfW; c9.9kt to landfill.

- Scenario 2: c814kt recycled; c206kt to EfW; c10.3kt to landfill.

4.21 Capacity vs Requirement (C&I):

- Recycling: Current C&I waste recycling capacity c1,238,800 tpa. Requirement

in 2042 is 741kt–814kt. The findings showed a surplus of +498,000tpa for C&I

waste recycling in Scenario 1, and +424,000t in Scenario 2. Scenario 2

requires c74kt more recycling but still within capacity limits. This suggests the

requirement to recycle C&I waste arising within the Plan area can easily be

managed within Leeds and potentially some imported C&I waste can also be

accommodated. No gap.

- EfW: C&I waste EfW capacity is c434,000 tpa and the modelled requirement

is between 197ktpa and 228ktpa suggesting a surplus of c237ktpa (Scenario

1) or c206ktpa (Scenario 2). Due to the higher recycling rate Scenario 2 has

lower requirement for EfW as there is less residual C&I waste to be managed,

this is despite a higher forecast of total C&I waste. No gap.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 29 of 60

- Landfill: C&I waste landfill requirement is c10ktpa. Capacity 0. Like LACW the

requirement is combined and aggregated over the Plan period to reveal a total

cumulative non-hazardous landfill gap of just over 1 million tonnes.

Implications for C&I waste

4.22 There is sufficient capacity to manage C&I waste and even if waste growth is

greater than expected, it is likely there will be sufficient capacity to accommodate it

(e.g. if growth was 1% p.a., making c1.1Mt by 2042 this would still be within capacity

availability). Surpluses in recycling and EfW mean Leeds will likely continue to be a

hub for waste processing.

4.23 A small portion of C&I waste would still go to landfill (e.g. residues or certain

wastes not suitable for EfW), which cannot be managed within Leeds though the

annual requirement of c10kt is trivial relative to regional capacity.

4.24 No new facilities are required for C&I waste, though existing capacity should be

maintained. It should be noted that some capacity (e.g. scrap metal yards) might not

operate at full permitted capacity; but even if one or more closed, this would not be

an issue due to headroom at other sites. The Plan should safeguard waste uses and

protect them from encroachment by other development to ensure ongoing resilience

in capacity.

4.25 Therefore, there is greater than net self-sufficiency in C&I waste management.

Indeed, the Plan could consider supportive policy for new reprocessing facilities (like

plastic recycling plants or textile recycling) to maximise the potential of the waste

streams available.

Construction and Demolition (C&D) Waste

4.26 C&D waste (hard materials) is considered separately to Excavation waste.

4.27 C&D waste in 2042 – projected arisings (excluding excavation):

- Scenario 1: c272,500 tonnes (same as baseline (0% growth)).

- Scenario 2: c296,000 tonnes (0.33% growth; c8% increase overall).

4.28 Management profile at 2042:

Both scenarios assumed 95% recycling; 4% other recovery (EfW – likely for wood);

1% landfill. No difference between scenarios as C&D waste management is already

approaching best practice.

4.29 Forecast Requirements:

- Scenario 1: c259kt recycled; c10.9kt to EfW (wood waste fraction c4%);

c2.7ktpa to landfill (43kt overall).

- Scenario 2: c281kt recycled; c11.8kt to EfW; c3.0ktpa to landfill (49kt overall).

4.30 Capacity vs Requirement (C&D):

- Recycling: Capacity c428,000 tpa. Requirement 259kt to 281kt. Surplus:

+169kt (Scenario 1), +147kt (Scenario 2). No gap - large surplus in C&D

waste recycling.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 30 of 60

- EfW (assume C&D): Capacity 110,500 tpa. Requirement c11kt–12kt means

surplus of c100kt. Assumed that this is mainly for biomass i.e. waste wood.

Surplus indicates Leeds is an importer of C&D wood waste. No gap.

- Landfill: c2.7 to 3ktpa Non-hazardous landfill capacity is needed. Capacity is

0t. Cumulative gap of c46 to 49 kt included in the overall non-hazardous

landfill gap.

4.31 The above suggests there is more than sufficient capacity to recycle C&D waste

and meet requirements for EfW. In fact there appears to be excess capacity meaning

C&D waste recyclers in Leeds likely process material arising beyond the Plan area.

Annual landfill requirement is minimal.

Implications for C&D waste

4.32 No new capacity needed for C&D waste. Retention of recycling sites e.g. for the

production of recycled aggregate is important noting that some activity may be timelimited

if permission linked to a temporary use such as a construction site or a quarry

(Britannia Quarry, for example, had an aggregate recycling facility on site). The Plan

should at least seek to help ensure that aggregate recycling capacity does not

decline overall.

Excavation (E) Waste

4.33 Excavation Waste in 2042 – projected arisings:

- Scenario 1: c706,100 tonnes (no growth).

- Scenario 2: c764,700 tonnes (0.33% growth).

4.34 Management profile at 2042:

Same for both scenarios: 5% recycling, 0% EfW (not applicable), 95% beneficial

deposit/landfill. Essentially, nearly all excavation waste is deposited on land via

backfilling or inert landfill though some can be used in other beneficial applications

such as landscaping and noise mitigation bunds.

4.44 Forecast Requirements:

- Scenario 1: c35,300 tpa recycled (e.g. some soils processed/stabilised or

reused directly); c670,800 tpa deposit on land (inert use/landfill) (overall

11.4Mt).

- Scenario 2: c38,300 tpa recycled, c726,300 tpa deposit on land (overall

12.4Mt).

4.45 Capacity vs Requirement (Excavation):

- 0t capacity dedicated for recycling excavation waste (though some soil

recycling could occur at aggregate sites). Requirement c35kt–38kt i.e. a gap

of c35kt in Scenario 1 and c38kt in Scenario 2. This gap basically means

there is no soil washing plant, etc. in Leeds, that could recycle some of the

excavation waste. It’s a relatively small gap compared to total excavation

waste tonnage and realistically, a soil treatment plant for 5% of soil may not

be viable and so it may be better to focus on reuse at construction sites which

doesn’t need a standalone ‘facility’. Nonetheless, the WNA identifies a modest

gap in ability to ‘recycle’ excavation waste.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 31 of 60

- Beneficial deposit of land: Capacity c900,000 tonnes remaining (as of c2023).

Requirement in one-year is estimated as between c670kt and c726kt.

Scenario 1 shows a -c11,400,000 tonnes gap and Scenario 2 a -c12,400,000

tonnes gap for ‘Beneficial Deposit (Tonnes)’. These significant negative

values represent the cumulative shortfall in inert deposit on land capacity from

2025 to 2042 if all excavation waste required deposit in Leeds. Essentially a

c12 million tonnes gap which is by far the largest capacity shortfall identified.

4.46 For Excavation waste there is therefore an apparent significant capacity gap

related to final deposit. There will not be enough dedicated void capacity in Leeds to

absorb excavation waste arisings beyond the early years of the Plan. This means a

heavy dependence on exporting inert waste to other areas’ quarries or land

reclamation sites making this a strategic issue. As mitigation, on-site reuse via the

DoWCoP protocols could be encouraged. If developers reuse soil on their own sites

or share soil between local sites (direct transfer under DoWCoP), then it doesn't

enter the ‘waste’ system or need permitted capacity. This practice already happens

but could be expanded, however, with the scale of construction, some surplus inert

excavation waste is inevitable.

Implications for Excavation Waste

4.47 The Plan should acknowledge the inert excavation waste capacity gap and set

out how it will be addressed. This might include working with regional partners, in

accordance with the Duty to Cooperate, to ensure sufficient regional inert waste

deposit to land capacity, and by encouraging development practices that minimise

off-site spoil. New inert waste facilities in Leeds may also be feasible with any new

quarry voids or brownfield sites potentially offering opportunities. Identifying even

small additional voids would help. Realistically though, the majority of excavation

waste will likely continue to go to large voids outside Leeds as part of site

restoration. Consideration should also be given to how the Plan could support the

beneficial deposit of inert waste associated with engineering projects such as

landscaping and flood mitigation.

Hazardous Waste

4.48 Hazardous waste in 2042 – projected arisings:

- Scenario 1: c83,100 tonnes;

- Scenario 2: c86,556 tonnes. (Both assume low rates of growth: 0.33 and 0.5%

respectively)

4.49 Management profile at 2042:

In both scenarios c95% hazardous waste is treated/recycled, 5% is managed by

hazardous landfill.

4.50 Forecast Requirements:

- Scenario 1: c83,000t to hazardous treatment/recovery per annum, c4,200t to

hazardous landfill per annum (cumulative total over the Plan period =

69,049t);

- Scenario 2: c87,000t to hazardous treatment, c4,350 t to hazardous landfill

per annum (cumulative total over the Plan period = 71,100t).

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 32 of 60

4.51 Capacity vs Requirement (Hazardous):

- Hazardous Treatment/Recycling: Capacity is 30,150 tpa. Requirement 83kt–

87kt resulting in capacity gaps: c -53kt (Scenario 1), -57kt (Scenario 2). This

is significant and requires development of additional capacity within Leeds or

export of 60 to 64% of hazardous waste for management beyond the Plan

area.

- Hazardous Landfill: Capacity 0. Cumulative requirement of between c112kt

(Scenario 1) and c129kt (Scenario 2) over the Plan period (based on declining

linear trend of arisings requiring landfill to achieve treatment targets at the end

of the Plan period). Annual landfill requirements are regionally relatively minor

as a single hazardous landfill site would typically manage tens of thousands of

tonnes per year.

- Hazardous Transfer: Existing capacity of c21,500tpa recorded though as this

does not offer final fate management, the need for transfer has not been

specifically identified and hence this is shown as a surplus.

4.52 For hazardous waste there is a clear capacity gap in treatment (55ktpa range),

and no local disposal. Without development of capacity within the Plan area there

will be an ongoing reliance on capacity elsewhere. In Scenario 2 hazardous waste

grows at a slightly higher rate than in Scenario 1 and so the capacity gap increases

slightly.

Implications for Hazardous Waste

4.53 Leeds should continue regional cooperation for hazardous waste as it is entirely

usual, and acceptable, for hazardous waste management facilities to receive waste

from a wide catchment due to economies of scale, indeed this is recognised by

NPPW. Some formal acknowledgement within West Yorkshire of the strategic

patterns related to hazardous waste management and shared reliance on particular

facilities and areas would be helpful. It will also be necessary to monitor and confirm

the ongoing availability of management routes with host authorities.

4.54 The Plan should also provide in principle support for new hazardous waste

management capacity. For example, if a company proposes a new chemical waste

treatment plant or expansion of current one, planning policy should be favourable.

The Plan could also identify potential land within industrial areas if consultation

reveals market demand (e.g. chemical industry cluster).

Agricultural Waste

4.55 Agricultural waste production is relatively negligible (less than 1% of the total

waste produced). Slight growth in arisings is forecast by Scenario 2 (0.5% p.a.) to

3,269 t vs 2,900t baseline. The management profile aligns with C&I waste as that

which leaves farms for management will be of a similar composition. This results in

c2,500t to recycling, c700t to ‘EfW’, and negligible to landfill by 2042.

4.56 There are no dedicated agricultural waste facilities in Leeds, but related wastes

(e.g. farm plastics, machinery, packaging) usually enter C&I waste streams

(collected by contractors and taken to C&I waste facilities). Given the negligible level

of arisings this isn’t shown as needing separate bespoke capacity. No specific gap is

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 33 of 60

identified as the assumption is that this is managed within existing systems e.g. farm

waste like silage wrap goes to plastic recyclers via producer schemes, etc.

Summary of Surplus/Shortfall Against Requirements

4.57 From the above stream by stream analysis, the major capacity surpluses and

shortfalls for Leeds by 2042 can be summarised as follows:

Surpluses (capacity > requirement)

• Recycling capacity for LACW, C&I, and C&D waste. There are hundreds of

thousands of tonnes of extra capacity in these categories. This suggests no

new recycling facilities are needed; rather the focus is on maximising the use

of existing capacity.

• Other recovery capacity (Energy from Waste) for LACW, C&I (and by

extension some wood within the C&D waste stream). Significant surplus

exists. Non-landfill residual waste treatment infrastructure in Leeds is more

than adequate. Indeed Scenario 2 suggests the RERF could be only c50%

utilised for waste produced in Leeds by 2042, meaning a surplus capacity that

will likely be utilised by residual waste imported from elsewhere.

• Hazardous waste transfer capacity. This allows the collection and bulking of

hazardous waste for transportation beyond the Plan area for management.

• Composting. A theoretical surplus for composting is identified as the

requirement to meet recycling targets is modelled as being addressed by

existing recycling capacity. This masks the need for capacity to manage local

authority collected green and food waste though this may be met by capacity

beyond the Plan area.

Shortfalls (Gaps) (requirement > capacity)

• Inert excavation waste (beneficial deposit). This is by far the largest capacity

gap identified. There is a cumulative c11 to 12 million tonne shortfall over the

Plan period to 2042.

• Non-hazardous waste landfill (for residual LACW/C&I waste). There is no

capacity of this type within the Plan area. However, the annual requirement is

should decline over the Plan period (projected c15ktpa combined LACW +

C&I waste by 2042) which should be manageable via exports to strategic

facilities though confirmation of the quantum and availability of such capacity

should be obtained via Duty to Cooperate discussions with host authorities.

• Hazardous waste treatment. There is an estimated shortfall of c55ktpa.

Capacity within Leeds allows for management of c54% of its hazardous waste

with the remainder being managed elsewhere.

• Hazardous waste landfill. There is an estimated annual shortfall of c4ktpa with

100% reliance on capacity elsewhere.

• Excavation waste recycling. There is a moderate shortfall of c36ktpa if a level

of 5% recycling is assumed for example by soil washing. If on site reuse were

counted towards this target, then it may be achievable within the Plan area.

4.58 These findings reflect observations in the adopted NRWLP 2013 that while

there is plenty of treatment capacity for the main waste streams, there is little landfill

in the Plan area. The findings also align with traditional urban waste capacity

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 34 of 60

challenges relating to a lack of opportunities for landfill development and reliance on

a regional network, and hazardous waste requiring needing regional/national

management solutions.

4.59 Comparing the two scenarios shows that the differences between them are

quantitative and not qualitative. Both scenarios identify the same types of gaps and

surpluses e.g. inert waste to land and hazardous waste are gaps in both; recycling

and EfW surpluses in both. Scenario 2 (higher growth, higher recycling) results in

smaller surpluses and slightly larger gaps. For example, the inert waste to land gap

is greater by c0.9M tonne, the hazardous waste gap by c4ktpa and recycling

surpluses are smaller by around 10 to 15%. But broadly, the Plan needs are similar

in either case. The presence of surpluses in recycling/EfW capacity even under the

higher requirement scenario (2) suggests there is capacity resilience to high waste

growth and achieving higher recycling rates will not be limited by capacity.

4.60 In light of the above the suggested the strategy for future waste management

capacity in Leeds is:

- Maintain and optimise surpluses (ensure their capacity is fully utilised to

reduce the need for additional development)

- Address or mitigate shortfalls through planning policy, partnership, and

possibly new capacity where feasible (though some local shortfalls such as

landfill might be intentionally left to be addressed by capacity elsewhere).

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 35 of 60

5. Recommendations

5.1 The following recommendations suggest how identified capacity gaps and

surpluses might be addressed in the Local Plan. The recommendations cover

capacity planning, cross-boundary cooperation, policy directions, and monitoring and

are based on the above assessment of current and future waste management needs

in Leeds.

Addressing Capacity Gaps

Inert Excavation Waste Capacity

5.2 The analysis shows a very large shortfall in capacity for managing excavation

(inert) waste within Leeds. Alternative provisions for inert waste should be planned

for as follows:

• Regional Solutions. Proactively engage with neighbouring authorities (e.g.

Bradford, Wakefield, etc.) to ensure continued access to inert landfill and/or

recovery sites for excavation waste arising in Leeds. This could be through

Memorandums of Understanding (MoU) or Statements of Common Ground

(SoCG), under the Duty to Cooperate, which acknowledge that inert

excavation waste will be exported from urban Leeds to available void in the

region. Ideally this should be addressed at the combined authority level and

facilitated by WYCA.

• Local Opportunities. Investigate whether any new inert waste recovery

capacity can be created in Leeds. For example, if any quarries or large

construction voids might become available (even temporarily). Policy

supporting their development involving for inert waste placement could be

included in the Local Plan. There might be brownfield sites (low-lying land or

void spaces) where inert waste could be used beneficially (for example,

raising land for flood defence, or restoring derelict sites). The Council could

issue a call for sites and/or consult industry to identify whether any such

capacity can be realised.

• Development Management Policy. Policy should be included in the Plan

requiring large construction projects in Leeds to have robust Site Waste

Management Plans that maximise on-site reuse of excavated soils.

Encouraging developers to use the Definition of Waste: Code of Practice

(DoWCoP) will enable more spoil to be reused on other local sites without

needing disposal as ‘waste’. Utilising quarry voids for temporary soil storage

and reuse hubs may also facilitate the protection and reuse of soil which is an

acknowledged important resource. Local Plan policy can provide in principle

support for such activity.

Summary

5.3 The Local Plan should explicitly recognise and address the inert waste capacity

gap and include a policy commitment that Leeds will continue to rely on a network of

regional inert waste facilities, rather than trying to achieve self-sufficiency in inert

landfill capacity. This realistic, deliverable approach should be coupled with in

principle support for any proposals that do come forward for inert waste recycling or

recovery in Leeds.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 36 of 60

Non-Hazardous Landfill (Residual Waste Disposal)

5.4 There is no non-hazardous landfill capacity in Leeds, but the need for landfill is

small and shrinking (aiming <10% of waste). Rather than seeking new landfill

capacity the following is recommended:

• Maintaining a Zero Waste to Landfill Strategy. Policies that direct residual

waste to energy recovery and other treatments and reserve landfill strictly for

unrecoverable fractions should be retained. The fact that there is no landfill in

Leeds should act as an incentive for industry to seek other management

solutions.

• Regional Agreement on Landfill. Work with neighbouring authorities to

acknowledge, via MoU or SoCG, that non-hazardous landfill capacity is a

strategic resource to be planned for on a cooperative basis, ideally facilitated

by WYCA. This may also be a matter that could usefully be considered in the

future Spatial Development Strategy for West Yorkshire.

• Policy Position. The Local Plan can include policy that no new non-hazardous

landfill capacity is proposed in Leeds due to adequate regional availability and

the objective to minimise landfill. This sets clear expectations for industry.

Only in exceptional circumstances (e.g. if regional capacity became critically

low) would this position be reconsidered.

Hazardous Waste Management

5.5 There will continued reliance on capacity beyond the Plan area to manage much

of the hazardous waste arising in Leeds which requires treatment and landfill.

• Duty to Cooperate on Hazardous Waste. The management of hazardous

waste needs to be included in discussions with local authorities with such

capacity in their area. For example, the Yorkshire and Humber Waste

Technical Advisory Body could coordinate a study that considers the

adequacy of hazardous waste infrastructure in the region. Leeds City Council

would contribute data on its hazardous waste exports (by type and

destination) and management capacity to support such a study.

• Support New Hazardous Waste Management Capacity. The Local Plan

should contain a policy that provide in principle support for proposals for new

or expanded hazardous waste management facilities in Leeds. For example, if

an operator wanted to build an oil recovery plant or an asbestos waste

transfer station in Leeds, policy should be welcoming (subject to normal

development management considerations).

• Safeguard Existing Capacity. Policy should be included in the Local Plan to

safeguard existing hazardous waste treatment (and transfer) capacity against

redevelopment for other uses and encroachment by incompatible

development that might hinder/prevent normal operations.

• Monitor Hazardous Waste Movements. Using EA data monitor where

hazardous waste from Leeds is being managed and establish the resilience of

the management routes. If facilities receiving hazardous waste from Leeds

are nearing capacity or closure (e.g. a hazardous landfill set to close by a

certain date), this should impact attitudes (and/or policy) towards granting

permission for proposals intended to provide alternative capacity. Again such

monitoring co-ordinated a regional level would be more helpful.

Organic Waste Treatment

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 37 of 60

5.6 While not highlighted as a specific numerical gap in capacity (due to recycling

capacity requirements being met via dry recycling), the lack of local composting/AD

capacity is an important matter for further consideration especially when separate

food waste collections from households are imminent.

• Encourage Local AD Capacity. While AD capacity beyond the Plan area may

be available for the management of food waste arising in Leeds, development

of local capacity would bring benefits to the area including the production of

energy and reductions in transport. The Plan should therefore offer in principle

support for the development of such capacity in the Plan area. The Plan could

so far as to identify broad locations where the development of such capacity

would be preferred. For example, co-locating an AD plant at Knostrop WWTW

or at sites operated by the Council. Ultimately the Plan could allocate land for

an organic waste treatment facility if a suitable site were to be

proposed/identified.

Utilising Surplus Capacity

5.7 The surplus recycling and other recovery capacity in Leeds presents an

opportunity for ongoing and future management of waste in Leeds.

• Safeguard Existing Facilities. As previously mentioned, the Local Plan should

identify and safeguard key waste management sites (MRFs, EfW, transfer

stations, C&D waste recycling sites, etc.) from encroachment or

redevelopment to non-waste uses. This will help ensure the surplus capacity

is maintained through to 2042. Such policy could specify that existing waste

capacity will be protected unless equivalent capacity is provided elsewhere.

• Maximise Throughput at Facilities. Local Plan policy should proposals

intended to help maximise use of available capacity.

• Regional Role. The authority should be open about how surplus capacity

within Leeds can be relied upon by other authorities seeking to meet

requirements for the management of waste in arising in their areas. While not

over-encouraging imports (which could conflict with proximity principle),

sharing capacity makes sense to avoid over-development. Duty to Cooperate

discussions should reflect how capacity in Leeds can be relied upon by

others.

• Future Flexibility. Surplus capacity provides headroom if waste grows faster

than expected or if capacity is lost. The Plan can highlight capacity surpluses

in Leeds as a strength that contributes to resilience of the wider waste

management network.

Engagement with Neighbouring Authorities

5.8 In light of cross-boundary movements associated with imports and exports of

waste, and their likely importance in future, Duty to Cooperate activity concerning on

waste planning is important for Leeds.

• Formalise Cooperation. Statements of Common Ground with relevant Waste

Planning Authorities should be prepared (or updated).

• Landfill provision. Hazardous waste management; Inert waste (coordination

with authorities that have quarry voids in their areas which could accept inert

waste from Leeds.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 38 of 60

• West Yorkshire Coordination. Work with the West Yorkshire Combined

Authority and/or the Yorkshire and Humber Waste Technical Advisory Body

should be pursued with other authorities to collectively address capacity

issues. For example, West Yorkshire as a whole might plan to meet net selfsufficiency.

The City Council could champion a ‘West Yorkshire Waste

Position Statement’ to underpin local plans in the area, confirming how waste

will flow between areas and identifying any joint infrastructure needs.

• Notification and Monitoring. Request that neighbouring authorities consult

Leeds on planning applications for major new waste facilities or landfill

closures that could impact Leeds. Early knowledge of, say, a major regional

landfill closing in 5 years time would allow time to adjust the strategy.

5.9 By maintaining ongoing meaningful dialogue and establishing formal agreements

(expected in any case by the provisions of the DtC), risks associated with reliance on

external capacity can be mitigated. Similarly, willingness to allow reliance on waste

capacity surpluses in Leeds constitutes good planning and helps avoid overdevelopment.

Policy Implications for the Leeds Local Plan

5.10 As already indicated above, the findings of this WNA inform the approaches on

waste management to be taken in the new Local Plan as outlined below.

• Spatial Strategy. The Plan should articulate that net self-sufficiency will be

pursued for most waste streams (LACW, C&I, C&D) through existing capacity,

but will rely on regional facilities for landfill and specialist hazardous waste

management capacity. This transparent approach is consistent with the

NPPW that expects needs to be identified and acknowledgment where other

areas are to be relied upon to meet needs.

• Site Allocation. On the basis that there is no pressing need for new waste

management capacity (due to surpluses and resilience of exports (to be

confirmed)), allocation of land for waste management is unnecessary.

However, the Plan should allow for the possibility of development for capacity

for inert waste deposit on land, non-hazardous landfill (albeit in exceptional

circumstances) and hazardous waste. Allocation of an area within a suitable

industrial estate as ‘suitable for waste uses’ should be considered. In any

event allocation of industrial areas in the Local Plan should specify how well

suited they would be to accommodating waste management capacity

(especially for hazardous or organics).

• Development Management Policies. Criteria for assessing waste facility

proposals should be reviewed and updated. Such criteria should generally

support development associated with modernisation/intensification at existing

waste sites (to maximise the potential of existing sites). Temporary on-site

waste treatment during major construction projects (crushers, screeners on

development sites) should be supported in principle. Site Waste Management

Plans or Circular Economy Statements should be required to demonstrate

how waste will be minimised and recycled materials used on construction.

• Safeguarding Policy. As already noted a schedule of existing waste sites in

Leeds to which safeguarding policy applies should be included and

maintained.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 39 of 60

• Promotion of Waste Hierarchy and Circular Economy. Local plan policies

should promote waste reduction and reuse initiatives in all forms of

development (not just waste). For example the Plan could encourage

provision of space for repair/reuse facilities in large developments (tying into

circular economy e.g. reuse shops at HWRCs, library of things etc.). The

London Plan provides an example of ambitious policy in this area.

• Climate Change Links. Policy should require utilisation of surplus heat from

EfW development. Improving recycling and reducing landfill contributes to

climate emergency goals in Leeds by cutting greenhouse gas emissions from

waste. The WNA’s assumptions on biodegradable waste diversion from

landfill (virtually none to landfill) align with climate objectives and so this could

be incorporated as targets within policy and/or monitoring.

5.11 By implementing such policies, the Local Plan will address the findings of this

WNA. Put simply, the Plan’s approach will be: ‘There is enough capacity of type X,

so this will be safeguarded; there is a lack capacity of type Y, and this will be met via

external cooperation and in principle support for any new proposals.’

Monitoring and Data Updates

5.12 To monitor the Plan and keep the WNA evidence up to date a robust monitoring

framework should be established as described below.

• Annual Monitoring Report (AMR). Annual waste management performance

should be reported against indicators including:

- Quantity of each waste stream arising (to check against forecasts);

- Percentage recycled/landfilled (to check progress against targets).

- Capacity changes (any new facilities opened/closed/expanded).

• 5 Yearly WNA Update. A full refresh of the Waste Needs Assessment should

take place at least every 5 years to align and inform, the review of the Local

Plan. A refresh may also be triggered by specific events such as a major

facility closing or the introduction of additional policy/legislation. A refresh

could assess the impact of new policies (like EPR/DRS).

• Operator Engagement. A periodic survey of waste facility operators in Leeds

to get additional insights may be beneficial. Information gleaned can feed into

future planning (and possibly prompt interventions if imminent capacity issues

are identified.

• Data Quality Improvements. Work with WYCA, the Environment Agency and

local authority officers to improve data on waste sites (to address data

gaps/misclassifications). For example, ensure clarity on how capacity is

attributed if a site handles multiple waste streams, to improve the accuracy of

future capacity assessments.

• Monitoring of Exports/Imports. Use WDI data to monitor how much waste is

exported to which authority and how much is imported. If an import/export

pattern shifts significantly e.g. landfill capacity is being exhausted, the Council

can proactively address it e.g. by finding alternative sites/options.

5.13 Through monitoring the Council can respond to changing patterns in

management and arisings e.g. if waste growth deviates (e.g. starts declining due to

dematerialisation or remote working, etc.), or if recycling stalls below target, the

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 40 of 60

Council may adjust its attitude to new development or potential plan for additional

capacity.

6. Summary

6.1 This Outline Waste Needs Assessment (WNA) provides a high level, strategic

assessment of the needs for waste management capacity to manage waste arising

in Leeds to 2042 to inform the content of the consultation draft (Regulation 18) of the

new Leeds Local Plan. Using the West Yorkshire Combined Authority (WYCA)

Waste Capacity Model as the principal data source, the assessment compared

baseline and projected waste arisings under two growth and management scenarios

with existing local capacity.

6.2 Key findings include the suggestion that Leeds is broadly self-sufficient in

recycling and other recovery, but there are ongoing deficits in landfill capacity, inert

waste to land capacity and hazardous waste management. The identified capacity

surpluses and gaps are consistent across both the median and maximum growth

scenarios, though the scale of surplus or shortfall varies depending on assumptions.

6.3 The assessment emphasises the importance of safeguarding existing capacity,

supporting new facilities where capacity gaps exist (particularly for organic waste

treatment and hazardous waste), and maintaining strong cross-boundary

cooperation, especially in relation to final disposal requirements.

6.4 The findings are indicative and based on high-level modelling rather than

detailed site-by-site analysis. The assumptions and limitations applied (including

reliance on permitted capacities, not actual throughput, and exclusion of

exempt/unpermitted waste streams) should be carefully noted.

6.5 If alternative assumptions were made, for example lower recycling performance,

faster-than-expected waste growth, or sudden changes in facility availability, then the

capacity gaps could widen, requiring more urgent policy responses. Ongoing

monitoring, review, and stakeholder engagement will be essential to maintain an up

to date picture of waste needs across the plan period. This document may be

updated in light of the consultation on the draft Leeds Local Plan.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 41 of 60

Appendices

Appendix 1: Waste Arisings Data and Baseline Calculations

The following is a detailed breakdown of how 2017 West Yorkshire values were

apportioned to Leeds and updated to 2022.

Derivation of Factors for Estimating Waste Baseline Arisings

1. Population

Data source: ONS Mid-Year Population Estimates

Leeds proportion = Population of Leeds/Total Population of West Yorkshire

https://www.gov.uk/government/statistics/non-domestic-rating-stock-of-properties-includingbusiness-

floorspace-2023

As of recent mid-year estimates (2022–2023):

• Leeds: c812,000

• Bradford: c550,000

• Kirklees: c444,000

• Wakefield: c353,000

• Calderdale: c211,000

• West Yorkshire total: c2.37 million

So: 812,000/2,370,000 = c34.2%

Based on population data Leeds produces c34% of West Yorkshire’s total waste.

2. Number of Dwellings

Data source: ONS Household Estimates or MHCLG Live Table 100

Leeds proportion = Number of dwellings in Leeds/ Total number of dwellings in West

Yorkshire

As of 2023:

• Leeds: 363,395

• Bradford: 222,130

• Kirklees: 189,797

• Wakefield: 163,894

• Calderdale: 97,024

• West Yorkshire total = 1,036,240

So: 363,395/1,036,240 = 35.1%

Based on dwellings Leeds produces c35% of West Yorkshire’s total waste.

3. Employment

Data source: Nomis official labour market stats

Leeds proportion = Number of people in employed in Leeds/ Total number of people

employed in West Yorkshire

As of 2023–2024:

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 42 of 60

• Leeds: 368,000

• Bradford: 244,200

• Kirklees: 215,800

• Wakefield: 162,800

• Calderdale: 102,700

• West Yorkshire total = 1,093,500

So: 368,000/1,093,500 = 33.7%

Based on employment Leeds produces c34% of West Yorkshire’s total waste.

To be applied to C&I waste.

4. Gross Value Added (GVA)

Data Source: ONS, regional gross value added (income approach)8

Leeds proportion = GVA Leeds/Total GVA of West Yorkshire

As of 2017:

• Leeds: £23,407,000

• Bradford: £10,185,000

• Wakefield: £7,373,000

• Kirklees and Calderdale: £12,381,000

• West Yorkshire total = £53,346,000

So: £23,407,000/£53,346,000 = 43.9%

Based on GVA Leeds produces c44% of West Yorkshire’s total waste.

To be applied to C&I waste.

5. Business Count - Registered VAT/PAYE Businesses

Data source: ONS, UK business: activity, size and location

Leeds proportion = Registered VAT/PAYE Businesses/ Total Registered VAT/PAYE

Businesses in West Yorkshire

As of 2024:

• Leeds: 29,020

• Bradford: 16,510

• Kirklees: 15,385

• Wakefield: 9,930

• Calderdale: 8,090

• West Yorkshire total = 78,935

So: 29,020/78,935 = 36.8%

Based on Registered VAT/PAYE Businesses Leeds produces c36.8% of West

Yorkshire’s total waste.

6. Housing Completions

Data source: DLUHC Housing Live Tables or local planning authority AMRs

Leeds proportion = Housing completions in Leeds/ Total housing completions in West

Yorkshire.

As of 2023-2024:

• Leeds: 2170

• Bradford: 830

• Kirklees: 600

8 Table 1

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 43 of 60

• Wakefield: 720

• Calderdale: 260

• West Yorkshire total = 4580

So: 2170/4580 = 47.7%

Based on Housing Completions Leeds produces c48% of West Yorkshire’s total

waste.

To be applied to Construction, demolition and excavation (C,D&E) waste.

7. Business Floorspace

Data source: Non-domestic rating: stock of properties including business floorspace, 20239

Leeds proportion = Business floorpsace in Leeds/ Total business floorspace in West

Yorkshire.

As of 2023:

• Leeds: 8,963 km2

• Bradford: 6,106 km2

• Kirklees: 5,299 km2

• Wakefield: 5,064 km2

• Calderdale: 2,950 km2

• West Yorkshire total = 28,382 km2

So: 8,963/28,382 = 31.6%

Based on Business floorpsace Leeds produces c32% of West Yorkshire’s total

waste.

To be applied to Commercial and Industrial Waste (C&I) waste.

8. Total Land Area (hectares)

Data source: ONS Open Geography Portal10

Leeds proportion = Total land area of Leeds/ Total land area of West Yorkshire

As of 2023:

• Leeds: 552 km2

• Bradford: 366 km2

• Kirklees: 409 km2

• Wakefield: 339 km2

• Calderdale: 364 km2

• West Yorkshire total = 2030 km2

So: 552/2030 = 27.2%

Based on total land area Leeds produces c27.2% of West Yorkshire’s total waste.

9. Non-developed land11 use area

Data source: DLUHC land use statistics live tables12

9 NDR Business Floorspace Tables, 2023 -Table/sheet FS1.1

10

https://geoportal.statistics.gov.uk/datasets/e0e00383f27d4437ae87d26e673c2d54_0/explore?location

=53.451560%2C-0.712723%2C8.99

11 This includes agriculture, forest, open land and water, outdoor recreation and residential gardens.

12 Land use statistics: England 2022 - live tables - Sheet P400b

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 44 of 60

Leeds proportion = Leeds non-developed land use area/ Total non-developed land

use area of West Yorkshire

As of 2022:

• Leeds: 43,621 hectares

• Bradford: 29,892 hectares

• Kirklees: 34,517 hectares

• Wakefield: 27,481 hectares

• Calderdale: 32,742 hectares

• West Yorkshire total = 168,253 hectares

So: 43,621/168,253 = 25.9%

Based on non-developed land use area Leeds produces c25.9% of West Yorkshire’s

total waste.

10. Agricultural Land

Data source: DLUHC land use statistics live tables13

Leeds proportion = Leeds agricultural land area/ Total agricultural land area of West

Yorkshire.

As of 2022:

• Leeds: 24,321 hectares

• Bradford: 13,947 hectares

• Kirklees: 17,208 hectares

• Wakefield: 17,297 hectares

• Calderdale: 12,096 hectares

• West Yorkshire total = 84,869 hectares

So: 24,321/ 84,869 = 28.7%

Based on agricultural land area Leeds produces c29% of West Yorkshire’s total

waste.

13 Land use statistics: England 2022 - live tables - Sheet P400b

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 45 of 60

Appendix 2: Waste Management Facilities in Leeds (Source WYCA database)

Site Name Operator Facility Type

Capacity

(tpa)

53 Pontefract Road EML Metal Recycling 2,500

Acanthus Golf Centre

Oakland Golf &

Leisure Ltd

Deposit of waste to

land (recovery) 137,266

Aireborough Waste

Traders

Mr Mark Paul

Sandham & Mr

Terence George

Sandham

Non-HazWaste

Transfer 1,734

Arthington Quarry

Physical Treatment 2

Associated

Waste

Management Ltd Physical Treatment 9,442

Arthington Quarry, Land

Recovery

Associated

Waste

Management Ltd

Deposit of waste to

land (recovery) 113,330

Arthington Quarry,

Physical Treatment 1

Associated

Waste

Management Ltd Physical Treatment 1,254

Asbestos Store

Leeds City

Council Haz Waste Transfer 562

Asbestos Waste Transfer

Station

Aspect Contracts

Ltd Haz Waste Transfer 200

AWM Ltd, Skelton

Grange Road, Stourton,

Leeds AWM Ltd

Material Recycling

Facility 0

B W Skip Hire

B W Skip Hire

Ltd

Vehicle Depollution

Facility 68,002

Babington Car Spares Mr Leon Parrish Car Breaker 2,380

Bagnall & Morris Skelton

Grange MRF

Bagnall & Morris

(Waste Services)

Ltd

Material Recycling

Facility 75,000

Beechgrove Farm,

Wetherby Road,

Scarcroft, TD Goodall Energy from waste 1,000

Betta Skip Hire

Mr Philip

Metcalfe

Non-Haz Waste

Transfer 116

Bill Dyson Skip Hire

Robert William

Dyson

Non-Haz Waste

Transfer 11,766

Blackhill Quarry

Mone Brothers

Ltd Landfill (inert) 8,003

Brancepeth Place

D L R Holdings

Ltd

Physical-Chemical

Treatment 3,180

Britannia Quarry

Booth Ventures

Ltd Landfill (inert) 46,914

Britannia Quarry

EPR/LP3133FK

Booth Ventures

Ltd

Landfill (nonhazardous)

257,154

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 46 of 60

Site Name Operator Facility Type

Capacity

(tpa)

Brown Lane Beeston S&W Paper

Material Recycling

Facility 0

Capitol Garage Richard Dolan

Vehicle Depollution

Facility 103

Carr Crofts Site

Associated

Waste

Management Ltd

Material Recycling

Facility 73,680

Chartist Way

Rentokil Initial U

K Ltd

Clinical Waste

Transfer 1,482

Cross Green Autos 1997 John Eastwood C a r B r eaker 214

Cross Green Industrial

Estate Energy Recovery

Facility

Veolia ES Leeds

Ltd Energy from waste 200,000

Cross Green Industrial

Estate Mechanical Pre-

Treatment Facility Veolia Residual MRF 214,000

Cross Myrtle Street Motorhog Metal Recycling 1,000

Dixons Car Dismantlers

Ltd Mr Paul Dixon Car Breaker 552

East Leeds Household

Waste Sorting Site, CA

site

Leeds City

Council CA Site 12,732

East Leeds Household

Waste Sorting Site, Non-

Haz Transfer

Leeds City

Council

Non-Haz Waste

Transfer 4,158

Ellar Ghyll Site

Leeds City

Council CA Site 4,924

European Metal

Recycling

European Metal

Recycling Ltd Metal Recycling 95,226

Fireclay

Mone Brothers

Excavations Ltd Physical Treatment 228,325

gelderd road Biffa

Non-Haz Waste

Transfer 2,500

Grangefield Industrial

Estate, Richardshaw

Road, Stanningley,

Pudsey BW Skip Hire

Material Recycling

Facility 75,000

H W Martin Waste Ltd

H W Martin

Waste Ltd

Non-Haz Waste

Transfer/Treatment 66,465

Haigh Park Road, Sturton JM Haulage

Recycling

(aggregates, other C

and D) 75,000

Halfway Garage Ltd

Halfway Garage

( Robin Hood )

Ltd Car Breaker 1,073

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 47 of 60

Site Name Operator Facility Type

Capacity

(tpa)

Holmewell Road Sorting

Site

Leeds City

Council

Material Recycling

Facility 11,283

Howley Park Quarry

Phase 3

Moorhead

Excavations Ltd

Deposit of waste to

land (recovery) 65,630

Howley Park Road East,

Morley Booth Ventures

Recycling

(aggregates, other

C&D) 30,000

Hub 45

OCO Technology

Ltd & Carbon8

Aggregates Ltd

Recycling

(aggregates, other

C&D) 120,000

J Alderson And Son

John Alderson

And Son Ltd Haz Waste Transfer 148

J Murphy & Son Shaun Murphy P h y s i c a l Treatment 960

J W Hinchliffe Ltd

J W Hinchliffe

Ltd Haz Waste Transfer 7

Kirkstall H W S S,

Material Recycling

Leeds City

Council

Material Recycling

Facility 107

Kirkstall H W S S, Non-

Haz Waste Transfer

Leeds City

Council

Non-Haz Waste

Transfer 21,988

Knostrop Wastewater

Treatment Works

Yorkshire Water

Services Ltd Composting 40,363

Knostrop Waste

Treatment Facility,

Chemical Treatment

FCC Recycling

(UK) Ltd Chemical Treatment 259,380

Knostrop Waste

Treatment Facility,

Incineration without

energy recovery

FCC Recycling

(UK) Ltd

Incineration without

Energy Recovery 10,000

Knostrop Waste

Water/Sludge Treatment Yorkshire Water Treatment Facility 12,000

Knowsthorpe Way

Transfer Station Skelton Ltd

Material Recycling

Facility 69,580

L S S Waste

Management Ltd

L S S Waste

Management Ltd

Non-Haz Waste

Transfer 176,829

Land Regeneration

Management Ltd

Land

Regeneration

Management Ltd

Deposit of waste to

land (recovery) 27,675

Leeds M R F \ H W S

Leeds City

Council CA Site 7,859

Leeds Recycling

Tarmac Trading

Ltd

Inert Waste Transfer /

Treatment 31,424

Leeds RERF

Veolia ES Leeds

Ltd

Non-Haz Waste

Transfer 23,942

Lemonroyd Sludge

Treatment Facility

Yorkshire Water

Services Ltd

Physical-Chemical

Treatment 52,124

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 48 of 60

Site Name Operator Facility Type

Capacity

(tpa)

Mc Gregors Yard

Mc Gregor Bros.

Ltd Car Breaker 304

Meanwood Road H W S

Leeds City

Council CA Site 9,691

Milners Road Site, CA

site

Leeds City

Council CA Site 7,479

Milners Road Site, Non-

Haz waste transfer

S B T

Contracting Ltd

Non-Haz Waste

Transfer 24,521

Milners Road, Yeadon,

Leeds Ls19 7je

Mark

Waddington

Non-Haz Waste

Transfer 2,341

Moor Road

Robinson And

Birdsell

(Recycling) Ltd Metal Recycling 762

Moor Top Quarry RG Stone Landfill (inert)

Morley Waste Traders

Ltd, LS27 7JU

Morley Waste

Traders Ltd Metal Recycling 9,248

Morley Waste Traders,

LS27 8RU

Morley Waste

Traders Ltd Metal Recycling

No Name, Land Between

Ready Mix Site And

Cross Green Investments

Ltd, Knowsthorpe Road,

Leeds Infinity Metals Metal Recycling 75,000

Odda Quarry Ogden Estates Landfill (inert)

P H S Ltd

Personnel

Hygiene

Services Ltd

Clinical Waste

Transfer 624

Peckfield Landfill

EPR/BU9726IH

Caird Peckfield

Ltd

Landfill (nonhazardous)

Pepper Road

Morley Waste

Traders Ltd Metal Recycling 18,443

Pudsey Grangefield

Sorting Site

Leeds City

Council

Non-Haz Waste

Transfer 7,829

Ravell Drum Works Packcare Ltd

Physical-Chemical

Treatment 6,717

Red Hall Lane

Leeds Council

Parks and

Gardens dept Composting

Regain Polymers Ltd

Regain Polymers

Ltd

Material Recycling

Facility 50,224

Rhodar Rhodar Ltd Haz Waste Transfer 374

Robinson And Birdsall

Robinson And

Birdsell Ltd Metal Recycling 2,978

S R C L Leeds Clinical

Waste Facility S R C L Ltd

Physical-Chemical

Treatment 3,319

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 49 of 60

Site Name Operator Facility Type

Capacity

(tpa)

Skelton Grange Energy

from Waste

WTI EFW

Holdings Ltd Energy from waste 410,100

Skelton Grange Landfill

Site, Composting Facility

Biffa Waste

Management Ltd Composting 24,000

Skelton Grange Landfill

Site, Inert LF Biogene Landfill (inert)

Skelton Grange Landfill

Site, Non-Haz waste

transfer

Biffa Waste

Services Ltd

Non-Haz Waste

Transfer/Treatment

Skelton MRF,

Knowsthorpe Way Skelton Ltd Energy from waste 24,000

Springwell Road

Biffa Waste

Services

Non-Haz Waste

Transfer 60,000

St Bernards Mill M R F

Associated

Waste

Management Ltd

Material Recycling

Facility 172,033

Swillington Quarry

Forterra Building

Products Landfill (Inert)

T A Brotherton

Thomas Arthur

Brotherton

Vehicle Depollution

Facility 4,055

T Shea Ltd

Green North

East Trading

Bidco Ltd Physical Treatment 183,695

Tate Medical Engineering

Ltd.

Tate Medical

Engineering Ltd

Physical-Chemical

Treatment 15,895

The Drum Yard

O' Donovan

Clifford

Physical-Chemical

Treatment 263

The Sidings

Jeff Skinner Skip

Hire Ltd

Non-Haz Waste

Transfer 18,084

Thorp Arch Sorting Site

Leeds City

Council CA Site 4,532

Thorpe Lane Site A1 All Cars Ltd Car Breaker 475

Timberpak Timberpak Ltd Physical Treatment 110,513

Town Street Site

Garage Revamps

Ltd Haz Waste Transfer 88

Tyersal Avenue Transfer

Station

Mr Joseph

Stephenson, Mrs

Betty

Stephenson & Mr

Geoffrey

Stephenson

Non-Haz Waste

Transfer 2,906

Unilever U K Unilever U K Ltd Physical Treatment 579

Valley Farm Road,

Stourton TBC

Non-Haz Waste

Transfer/Treatment 140,000

Valley House

EPR/XP3892ZH WasteCare Ltd Physical Treatment 29,650

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 50 of 60

Site Name Operator Facility Type

Capacity

(tpa)

Vickersdale Works

Metal Sourcing

Ltd Metal Recycling 8,831

Wetherby Skip Services

Wetherby Skip

Services Ltd

Non-Haz Waste

Transfer 23,486

Whitehall Road Goods

Yard, Holbeck

Biffa Waste

Services

Material Recycling

Facility 60,000

Whiteways Site Gary White C a r B reaker 217

Whitewell Farm,

Bramham TBC Composting 1,976

Windmill Gate Works (

Premier Metals)

M & N

Commodities Ltd Metal Recycling 1,666

Woodland Spares Ltd

Woodland

Spares Ltd

Vehicle Depollution

Facility 46

Y M T

Yorkshire Metal

Traders Ltd

Non-Haz Waste

Transfer 4,912

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 51 of 60

Appendix 3: Growth Rate Derivations

WYCA Database average growth from 2017 to 2036 for different waste types is set

out in the table below.

Waste Stream

Median Growth Maximum

Growth

AGR 0.00% 0.00%

C&I 0.33% 0.71%

CD 0.33% 0.71%

E 0.33% 0.71%

Haz 0.33% 0.71%

LACW Secondary 0.24% 0.48%

LACWHH 0.24% 0.48%

LACWNHH 0.24% 0.48%

Two sets of growth rates have been derived as follows:

1. Median Growth Rate Scenario

The median growth rates for Agricultural, C&I and hazardous waste have been

chosen to reflect recent events that are likely to have affected growth in waste

including:

- Covid

- Economic pressures – virtually stagnant economic growth experienced in the

recent past and predicted in future

- Increases (and increasing) costs of raw materials

The production of C, D & E waste fluctuates depending on construction activity

taking place in any one year. Planning Practice Guidance advises that a zero-growth

assumption (static growth) be used when forecasting and so this has been used for

the median growth rate scenario.

Growth rates for Local Authority Collected Waste are based on recent patterns14 and

future Government initiatives and targets aimed at reducing LACW arisings,

including:

- Recycle 65% of municipal (including household) waste by 2035

- Eliminate all avoidable waste by 2050 and all avoidable plastic waste by end

of 2042

- Double resource productivity by 2050

- Halve food waste by 2030 (from 2007 levels)

- Bans on certain single-use plastics

- Mandatory food waste collections (expected across England by 2026)

- Extended producer responsibility (EPR)

14 https://www.gov.uk/government/statistics/local-authority-collected-waste-management-annualresults

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 52 of 60

- Halve residual household waste (excluding major mineral wastes) produced

per person by 2042

Historic Growth rates for LACW15 are as follows:

2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24

-0.49% 2.18% 2.29% -1.4% -4.97% 0.75% 5.09% 1.34% TBC 3.26%

The average growth rate over this period = 0.90%

If the anomalous Covid year (2020/21) is removed the average growth rate = 0.37%

0.37% has been taken as the LACW growth rate.

The median growth rates are consistent with trends reported in the 2022/23 Leeds

Authority Monitoring Report that states:

‘The total amount of waste received in Leeds increased by 8% from last year, with

small increases being seen in all waste streams. There is an apparent trend of

increasing waste being received in Leeds over the short term after decreases being

reported between 2016 and 2018, with a longer term trend also seeing slight

increases in waste being received from 2012 levels (Chart MW4).

The largest waste streams were for CD&E and C&I. 89% of this C&I waste consisted

of waste and water treatment, with the majority of this (81%) of this falling under the

'Mechanical treatment of waste (for example sorting - crushing - compacting -

pelletising)' sub-category.

All waste streams were below the waste arising projections in the Local Plan up to

2026, with the exception of MSW which was 141% above the projected waste figure.

MSW has risen each year since 2018, exceeding the projected figure since 2020.’

2. Maximum Growth Rate Scenario

The maximum growth rates chosen with explanation are set out in the table below:

Waste

Stream

Maximum

Growth

Rate

Justification

AGR 0.5%

In line with C&I growth to reflect increase in commercial

activity anticipated by the C&I growth rate

C&I 0.5%

While the WYCA model uses 0.71% as the maximum

growth rate this is considered excessive in light of recent

forecasts of economic growth in the UK

CD 0.33%

PPG recommends 0% for C, D & E waste and this has

been applied to the median growth rate. It is considered

that maximum growth rate for CD&E waste should be

greater than zero and so the WYCA median growth rate

for C,D&E of 0.33% and this has been chosen.

E 0.33% See above

Haz 0.5% To reflect the C&I maximum growth rate

15 Source data: Leeds Authority Monitoring Report 2022/23 and DEFRA for 2023/24

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 53 of 60

LACW 0.4%

The median growth rate has been taken as 0.37% which

reflects measured growth over recent years. Due to

Government initiatives to reduce LACW growth it is

possible that LACW reduces rather than increases and

so a maximum growth rate of 0.4% is proposed which is

only a modest increase on the median growth rate.

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 54 of 60

Appendix 4: Waste Management Profiles and Targets

A4.1 Context

A4.1.1 National policy

Municipal Waste

The UK government has committed to meet the following targets for the

management of municipal waste in England:

- Minimum 55% recycling floor by 2025;

- Minimum 60% recycling floor by 2030;

- Minimum 65% recycling floor by 2035;

- Maximum 10% on landfilling by 2035.

Commercial and Industrial Waste

There are no national policy targets addressing the management of C&I waste alone.

However, a number of policy targets concerning the management, and prevention, of

waste have been adopted by Government, which are relevant when considering

future need for management capacity for C&I waste. These are summarised below:

- A stated intention to achieve the virtual elimination of biodegradable waste

going to landfill from 2028;

- adoption of municipal waste recycling targets for 2025, 2030 and 2035 (see

above);

- adoption of a residual waste reduction target such that it does not exceed 287

kg per capita per year [from 2019 levels] by 31 December 2042 which is

supported by the following interim targets to be achieved by 31 January 2028:

- Reduce residual waste produced per person by 24%;

- reduce residual waste in total tonnes by 21%;

- reduce municipal residual waste produced per person by 29%; and,

- adoption of a long-term target for the virtual elimination of avoidable waste by

2050.

The residual waste reduction targets set out above are expected to be achieved

through a combination of increased recycling rates and waste prevention measures.

Government modelling has shown recycling rates may need to reach 75% by 2042.

This is expected to be achieved by the introduction of Extended Producer

Responsibility initiatives including a deposit return scheme relating to packaging

waste, and the adoption of a more consistent approach to recycling involving the

statutory requirement for the separate collection of at least five materials: glass,

metals, plastics, paper, and food waste from all households and business premises

by 2028.

Construction and Demolition Waste

Under the EU Waste Framework Directive, the UK was required to recover at least

70% of non-hazardous C&D waste by 2020. England surpassed this target,

achieving a recovery rate of 93.8% in 201816.

16 https://www.gov.uk/government/publications/progress-report-on-recycling-and-recovery-targets-forengland-

2020

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 55 of 60

A4.1.2 Adopted Leeds NRWLP

Paragraph 4.14 states:

‘The additional capacity required to meet the needs of the plan (as shown in table

4.1), is based on achieving the following re-use, recycling and composting targets

which our evidence has shown are achievable in Leeds during the plan period17:

- 50% for MSW;

- 70% for C&I; and

- 70 - 85% for CD&E.’

A4.2 Proposed Targets

Two sets of targets have been derived, the principal difference between the two sets

is that one set is driven by achievement of the municipal waste recycling targets and

the other is driven by achievement of the 2042 residual waste per head target of

287kg. Their derivation is described below.

Target Scenario 1 – Government Recycling Target Lead

A4.2.1 Local Authority Collected Waste

The 2022/23 Authority Monitoring Report states that 61% of LACW was treated

through incineration with energy recovery, 37% was recycled and just under 1% was

sent to landfill.

Recycling/composting

It is assumed that by 2042 the 2035 65% recycling target will be achieved.

Landfill

There is no reason why landfilling rates should increase and so it is proposed that

the landfill rate of 1% be maintained.

Other Recovery (Energy from Waste)

This is the remainder between recycling and landfill with equates to 34%. This is a

drop from the most recent recorded rate, and it is assumed that any other recovery

capacity that would not be required for LACW would be utilised for other waste

streams.

A4.2.2 Commercial and Industrial Waste targets

Recycling/composting

The adopted Leeds NRWLP includes a target of 70% recycling/composting by 2026.

This target was an ambitious target at the time, however it is assumed national

initiatives (as described above) will result in a further increase in recycling and

composting and therefore a target of 75% by 2042 is proposed.

17 To 2026

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 56 of 60

Landfill

There is no convincing reason why the rate of landfilling of C&I waste should diverge

significantly from the 1% rate for LACW and so a similar 1% is proposed for C&I

waste for the end of the plan period.

Other Recovery (Energy from Waste)

If 75% is recycled and composted and 1% is landfilled, then the percentage of waste

being managed by other recovery will be 24%.

A4.2.3 Construction and Demolition Waste

Under the EU Waste Framework Directive, the UK was required to recover at least

70% of non-hazardous C&D waste by 2020. England surpassed this target,

achieving a recovery rate of 93.8% in 201818.

Recycling/composting

In light of the above it is reasonable to assume that a recycling rate for C&D waste of

95% could be achieved by 2042

Landfill

Very little C&D waste should need to go to landfill and so a rate of 1% by 2042 is

assumed consistent with LACW and C&I waste.

Other Recovery (Energy from Waste)

If 95% is recycled and composted and 1% is landfilled, then the percentage of waste

being managed by other recovery will be 4%.

A4.2.4 Excavation Waste

Excavation waste comprises mainly soils and stones. Soils can be recovered in

engineering operations and harder materials can be used a recycled aggregate. The

bulk of excavation waste is soils and so it is assumed that 95% will be recovered to

land and 55 will be recycled. There is no need for any such waste to be disposed

within landfill. The use of excavation waste in landfill engineering is taken to

constitute ‘other recovery’.

Recycling/composting = 5%

Landfill = 0%

Other Recovery (beneficial use via deposit on land) = 95%

A4.2.5 Hazardous Waste

Recycling/composting

Hazardous waste does not generally readily lend itself to recycling and composting

however some hazardous wastes can be recycled such as oils and solvents. Such

wastes will constitute quite a high proportion of the total hazardous waste arising and

so a rate of 75% has been assumed.

18 https://www.gov.uk/government/publications/progress-report-on-recycling-and-recovery-targets-forengland-

2020

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 57 of 60

Landfill

For some hazardous waste landfill is the best option though other solutions further

up the waste hierarchy are preferable. Such wastes include asbestos although

arisings of such waste are declining. A rate of 5% has been assumed.

Other Recovery (Energy from Waste)

Incineration offers a solution for several types of hazardous waste and in some case

specialist high temperature units are deployed.

If 75% is recycled and 5% is landfilled, then the percentage of waste being managed

by other recovery will be 20%.

The management profile for this scenario is summarised in the table below:

Waste

Stream

Recycling

(%)

Non haz

Energy

from

Waste

(%)

Beneficial

use (%)

Non Haz

Landfill

(%)

Haz

waste

treatment

(%)

Haz

waste

landfill

(%)

AGR 75% 24% 0% 1% 0% 0%

C&I 75% 24% 0% 1% 0% 0%

CD 95% 4% 0% 1% 0% 0%

E 5% 0% 95% 0% 0% 0%

Haz 0% 0% 0% 0% 95% 5%

LACW 65% 34% 0% 1% 0% 0%

Target Scenario 2 – Government Residual Waste Target Lead

• This scenario takes account of the target in the Environmental Targets

(Residual Waste) (England) Regulations 2023 that includes a target of

reducing residual waste production to 287 kg per capita by 2042.

• According to the Office for National Statistics (ONS)19, the estimated

population of Leeds was 812,000 in 2021.

• Residual waste production in Leeds in 2021 was calculated using the Waste

Data Interrogator and found to equate to 521,088 tonnes which equates to

642kg per person. It is notable that this is significantly above the average for

England which the latest data suggests is 558kg/head (excluding major

mineral wastes)20.

19 https://www.ons.gov.uk/visualisations/censusareachanges/E08000035

20 https://www.gov.uk/government/statistics/estimates-of-residual-waste-excluding-major-mineralwastes-

and-municipal-residual-waste-in-england/estimates-of-residual-waste-excluding-majormineral-

wastes-and-municipal-residual-waste-in-england

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 58 of 60

• England's population is projected to grow more quickly than other UK nations

between mid-2022 and mid-2032: by 7.8%21. This equates to 0.75% per year.

• It should be noted that the 287kg/person cap is more ambitious and long-term

and limits how much residual waste is generated regardless of how it's treated

(landfill, EfW, RDF, etc.).

• In this scenario it is assumed that there will be a linear reduction from 642kg

per person in 2021 to achieve the 287kg/head target in 2042.

• The scenario is lead by the reduction in residual waste target and does not

‘overlay’ additional recycling targets.

• The table below shows how the factors considered above result in an

estimate of annual residual waste arisings in Leeds between 2021 and 2042.

Year

Population

% Pop’n

increase

total residual

waste (t)

Residual

waste

kg/person

2021 812,000 0.75 521,088 642

2022 818,090 0.75 511,177 625

2023 824,226 0.75 501,088 608

2024 830,407 0.75 490,819 591

2025 836,635 0.75 480,367 574

2026 842,910 0.75 469,732 557

2027 849,232 0.75 458,909 540

2028 855,601 0.75 447,898 523

2029 862,018 0.75 436,696 507

2030 868,483 0.75 425,301 490

2031 874,997 0.75 413,710 473

2032 881,560 0.75 401,921 456

2033 888,171 0.75 389,933 439

2034 894,832 0.75 377,742 422

2035 901,544 0.75 365,346 405

2036 908,305 0.75 352,743 388

2037 915,118 0.75 339,930 371

2038 921,981 0.75 326,905 355

2039 928,896 0.75 313,666 338

2040 935,863 0.75 300,210 321

2041 942,882 0.75 286,534 304

2042 949,953 0.75 272,637 287

21https://www.ons.gov.uk/peoplepopulationandcommunity/populationandmigration/populationprojectio

ns/bulletins/nationalpopulationprojections/2022based

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 59 of 60

Assuming a 1% rate of landfill at 2042 allowed calculation of an ‘other recovery’

(assumed to be Energy from Waste) rate of 20% at 2042 and hence a recycling rate

of 79%. This assumes that the reduction in residual waste is wholly due to increases

in recycling and not due to other measures such as reduction in waste produced

overall.

For excavation and hazardous waste, the same management profile used in

Scenario 1 was used.

The management profile for this scenario is summarised in the table below:

Waste

Stream

Recycling

(%)

Non haz

Energy

from

Waste

(%)

Beneficial

use (%)

Non Haz

Landfill

(%)

Haz

waste

treatment

(%)

Haz

waste

landfill

(%)

AGR 79% 20% 0% 1% 0% 0%

C&I 79% 20% 0% 1% 0% 0%

CD 95% 4% 0% 1% 0% 0%

E 0% 0% 100% 0% 0% 0%

Haz 0% 0% 0% 0% 95% 5%

LACW 79% 20% 0% 1% 0% 0%

Outline Waste Needs Assessment (2025 - 2042)

Version: 2.0 Final Draft

16 June 2025

Page 60 of 60

Appendix 5: Glossary of Terms

Term Definition

AD Anaerobic Digestion – a biological process that breaks down

organic material to produce biogas and digestate.

C&I Waste Commercial and Industrial Waste – waste generated by

businesses and industry.

CD&E

Waste

Construction, Demolition and Excavation Waste – waste from

building, demolition, and excavation works.

Capacity

Gap

The difference between forecast waste arisings and the available

management capacity.

EA Environment Agency – the environmental regulator for England

responsible for permitting and monitoring waste sites.

EfW Energy from Waste – facilities that recover energy through

combustion or other thermal treatments.

Energy

Recovery

The conversion of non-recyclable waste materials into usable

heat, electricity, or fuel.

Hazardous

Waste

Waste that poses substantial or potential threats to public health

or the environment.

LACW Local Authority Collected Waste – waste collected by or on

behalf of local councils.

Landfill The disposal of waste on land, usually by burial in voids, typically

used for residual waste that cannot be recycled or recovered.

MRF Materials Recovery Facility – a plant where mixed recyclables

are separated and processed for recycling.

Recycling The process of converting waste materials into new materials

and objects.

Regulation

18

An early stage in Local Plan preparation where the draft plan is

consulted on publicly.

RERF Recycling and Energy Recovery Facility

TS Transfer Station – a site where waste is temporarily held before

transport to final disposal or treatment.

WDI Waste Data Interrogator – an Environment Agency dataset

recording waste movements and management.

WNA Waste Needs Assessment – a study assessing current and

future waste management requirements.

WYCA West Yorkshire Combined Authority – the regional authority

providing the waste capacity model used in this assessment.

Contents

Sheet Title Contents

2 Updates

This sheets outilines updates made by different

versions

3 Baselines How arisings baselines have been calculated

4

Waste growth rates dervied from the

WYCA Capacity Model

5 Forecast waste arisings to 2042

6 Management Profiles

shows percentage management of different waste

types

7 Future management requirements

Calculation of annual management requirements by

waste type and year. Includes cumulative total

deposit on land requirements.

8 Existing Management Capacity

9 Capacity Gaps at 2042

10 Raw LACW data

Updates

16.06.25 Comparable data on arisings from the NR&WLP 2013 added

16.06.25 Forecasts (sheet 5) updated to take account of the Plan period to 2042 (previous version was to 2041)

16.06.25 Management Profile (Sheet 6) updated to take account of the Plan period to 2042 (previous version was to 2041)

16.06.25 Management Profile (Sheet 6) updated to take account of the Plan period to 2042 (previous version was to 2041)

Waste Arising from WYCA Model for 2017 Baseline

West Yorks Leeds

2017 (West Yorks) % Leeds tonnage Tonnage Rounded Tonnage CDE %

AGR 10,261 28.70% 2,945 2,900 AGR 2,900 0.1

C&I 2,472,581 36.80% 909,910 909,900 C&I 909,900 39.7

CD 571,447 47.70% 272,580 272,500 C&D 272,500

E 1,480,248 47.70% 706,078 706,100 E 706,100 978,600 42.7

Haz 208,731 36.80% 76,813 76,800 Haz 76,800 3.4

LACW N/A N/A 323,059 323,100 LACW 323,100 14.1

2,291,300 2,291,300 100.0

LACW 2022/23

Mgt Method Leeds

Landfilled Waste

(tonnes) 2,404

Incineration with

EfW (tonnes) 200,796

Incineration without

EfW (tonnes) 1,937

Recycled-

Composted Waste

(tonnes) 116,234

Other waste

(tonnes) 1,688

Waste input to

intermediate plants

(tonnes) 213,713 323,059

Total 536,772

0%

40%

12%

31%

3%

14%

WASTE ARISINGS PROPORTIONS

AGR C&I C&D E Haz LACW

Comparison v Adopted Natural Resources and Waste Local Plan 2013

Current

(2011)

Current

(2011) %

2026

Projection %

975,364 975,364 35% 1,212,000 38% 40

1,405,000 1,405,000 50% 1,556,000 48% 43

92,974 92,974 3% 103,026 3% 3

347,725 347,725 12% 347,725 11% 14

2,821,063 2,821,063 3,218,751

Waste Stream 2017 2018 Growth tpa% Growth 2019 Growth tpa% Growth 2020 Growth tpa% Growth 2021

Growth

tpa

%

Growth

AGR 10261 10261 0 0.00% 10261 0 0.00% 10261 0 0.00% 10,261 0 0.00%

C&I 2489129 2495381 6252 0.25% 2502396 7015 0.28% 2509793 7397 0.30% 2,518,517 8,724 0.35%

CD 575272 576716 1444 0.25% 578338 1622 0.28% 580047 1709 0.30% 582,063 2,016 0.35%

E 1490155 1493898 3743 0.25% 1498097 4199 0.28% 1502526 4429 0.30% 1,507,748 5,222 0.35%

Haz 210128 210656 528 0.25% 211248 592 0.28% 211872 624 0.30% 212,609 737 0.35%

LACW Secondary 522752 524270 1518 0.29% 525704 1434 0.27% 527078 1374 0.26% 528,393 1,315 0.25%

LACWHH 922562 925241 2679 0.29% 927772 2531 0.27% 930198 2426 0.26% 932,518 2,320 0.25%

LACWNHH 10591 10622 31 0.29% 10651 29 0.27% 10679 28 0.26% 10,706 27 0.25%

Waste Stream 2017 2018 Growth tpa% Growth 2019 Growth tpa% Growth 2020 Growth tpa% Growth 2021 Growth t%pa Growth

AGR 10261 10261 12588 0.50% 10261 14157 0.56% 10261 14973 0.59% 10261 17708 0.70%

C&I 2505727 2518315 2910 0.50% 2532472 3272 0.56% 2547445 3460 0.59% 2565153 4093 0.70%

CD 579107 582017 7536 0.50% 585289 8476 0.56% 588749 8964 0.59% 592842 10601 0.70%

E 1500091 1507627 1063 0.50% 1516103 1195 0.56% 1525067 1264 0.59% 1535668 1495 0.70%

Haz 211529 212592 3055 0.58% 213787 2894 0.55% 215051 2781 0.52% 216546 2667 0.50%

LACW Secondary 525936 528991 5390 0.58% 531885 5109 0.55% 534666 4908 0.52% 537333 4706 0.50%

LACWHH 928182 933572 62 0.58% 938681 58 0.54% 943589 57 0.53% 948295 54 0.50%

LACWNHH 10656 10718 62 0.58% 10776 58 0.54% 10833 57 0.53% 10887 54 0.50%

LACW 2013/14 2014/15 change (t)

Change

(%) 2015/16 change (t) Change (%) 2016/17 change (t) Change (%) 2017/18

change

(t)

Change

(%)

total household

waste 305,359 305,618 259 0.08% 309,163 3,545 1.16% 314,931 5,768 1.87% 306,024 -8,907 -2.83%

LACW Source AMR

22/23 325,572 323,965 -1,607 -0.49% 331,043 7,078 2.18% 338,630 7,587 2.29% 333,895 -4,735 -1.40%

WYCA Growth Rates - Maximum

Growth

WYCA Growth Rates - baseline

Waste Stream

AGR

C&I

CD

E

Haz

LACW Secondary

LACWHH

LACWNHH

Waste Stream

AGR

C&I

CD

E

Haz

LACW Secondary

LACWHH

LACWNHH

LACW

total household

waste

LACW Source AMR

22/23

WYCA Growth Rates - Maximum

Growth

WYCA Growth Rates - baseline

2022

Growth

tpa

%

Growth 2023

Growth

tpa

%

Growth 2024

Growth

tpa

%

Growth 2025

Growth

tpa

%

Growth 2026

Growth

tpa

%

Growth

10261 0 0.00% 10261 0 0.00% 10261 0 0.00% 10261 0 0.00% 10261 0 0.00%

2529280 10,763 0.43% 2540953 11,673 0.46% 2551867 10,914 0.43% 2561769 9,902 0.39% 2570911 9,142 0.36%

584551 2,488 0.43% 587249 2,698 0.46% 589771 2,522 0.43% 592059 2,288 0.39% 594172 2,113 0.36%

1514192 6,444 0.43% 1521180 6,988 0.46% 1527714 6,534 0.43% 1533642 5,928 0.39% 1539115 5,473 0.36%

213517 908 0.43% 214503 986 0.46% 215424 921 0.43% 216260 836 0.39% 217032 772 0.36%

529715 1,322 0.25% 531057 1,342 0.25% 532395 1,338 0.25% 533719 1,324 0.25% 535039 1,320 0.25%

934851 2,333 0.25% 937219 2,368 0.25% 939581 2,362 0.25% 941917 2,336 0.25% 944247 2,330 0.25%

10732 26 0.24% 10760 28 0.26% 10787 27 0.25% 10814 27 0.25% 10840 26 0.24%

2022 Growth t%pa Growth 2023 Growth t%pa Growth 2024 Growth t%pa Growth 2025 Growth t%pa Growth 2026 Growth t%pa Growth

10261 21926 0.85% 10261 23879 0.92% 10261 22429 0.86% 10261 20437 0.78% 10261 18940 0.71%

2587079 5067 0.85% 2610958 5519 0.92% 2633387 5184 0.86% 2653824 4723 0.78% 2672764 4377 0.71%

597909 13126 0.85% 603428 14296 0.92% 608612 13427 0.86% 613335 12235 0.78% 617712 11339 0.71%

1548794 1851 0.85% 1563090 2016 0.92% 1576517 1893 0.86% 1588752 1725 0.78% 1600091 1599 0.71%

218397 2690 0.50% 220413 2735 0.51% 222306 2735 0.50% 224031 2713 0.50% 225630 2712 0.49%

540023 4747 0.50% 542758 4827 0.51% 545493 4827 0.50% 548206 4787 0.50% 550918 4787 0.49%

953042 54 0.50% 957869 56 0.51% 962696 55 0.50% 967483 55 0.50% 972270 55 0.50%

10941 54 0.50% 10997 56 0.51% 11052 55 0.50% 11107 55 0.50% 11162 55 0.50%

2018/19

change

(t)

Change

(%) 2019/20

change

(t)

Change

(%) 2020/21

change

(t)

Change

(%) 2021/22

change

(t)

Change

(%) 2022/23

change

(t)

Change

(%)

317313 ###### -4.97% 319691 2,378 0.75% 335,972 16,281 5.09% 340,466 4,494 1.34%

Waste Stream

AGR

C&I

CD

E

Haz

LACW Secondary

LACWHH

LACWNHH

Waste Stream

AGR

C&I

CD

E

Haz

LACW Secondary

LACWHH

LACWNHH

LACW

total household

waste

LACW Source AMR

22/23

WYCA Growth Rates - Maximum

Growth

WYCA Growth Rates - baseline

2027

Growth

tpa

%

Growth 2028

Growth

tpa

%

Growth 2029

Growth

tpa

%

Growth 2030

Growth

tpa

%

Growth 2031

Growth

tpa

%

Growth

10261 0 0.00% 10261 0 0.00% 10261 0 0.00% 10261 0 0.00% 10261 0 0.00%

2579667 8,756 0.34% 2588232 8,565 0.33% 2596430 8,198 0.32% 2604788 8,358 0.32% 2613224 8,436 0.32%

596196 2,024 0.34% 598176 1,980 0.33% 600070 1,894 0.32% 602002 1,932 0.32% 603952 1,950 0.32%

1544357 5,242 0.34% 1549484 5,127 0.33% 1554392 4,908 0.32% 1559396 5,004 0.32% 1564446 5,050 0.32%

217771 739 0.34% 218494 723 0.33% 219186 692 0.32% 219892 706 0.32% 220604 712 0.32%

536334 1,295 0.24% 537582 1,248 0.23% 538794 1,212 0.23% 539992 1,198 0.22% 541143 1,151 0.21%

946532 2,285 0.24% 948734 2,202 0.23% 950873 2,139 0.23% 952987 2,114 0.22% 955019 2,032 0.21%

10867 27 0.25% 10892 25 0.23% 10916 24 0.22% 10941 25 0.23% 10964 23 0.21%

2027 Growth t%pa Growth 2028 Growth t%pa Growth 2029 Growth t%pa Growth 2030 Growth t%pa Growth 2031 Growth t%pa Growth

10261 18208 0.68% 10261 17869 0.66% 10261 17158 0.63% 10261 17551 0.64% 10261 17772 0.65%

2690972 4208 0.68% 2708841 4130 0.66% 2725999 3965 0.63% 2743550 4057 0.64% 2761322 4107 0.65%

621920 10900 0.68% 626050 10697 0.66% 630015 10273 0.63% 634072 10506 0.64% 638179 10640 0.65%

1610991 1537 0.68% 1621688 1509 0.66% 1631961 1448 0.63% 1642467 1482 0.64% 1653107 1500 0.65%

227167 2667 0.48% 228676 2576 0.47% 230124 2507 0.45% 231606 2383 0.43% 233106 2392 0.43%

553585 4707 0.48% 556161 4545 0.47% 558668 4425 0.45% 561051 4205 0.43% 563443 4223 0.43%

976977 54 0.48% 981522 52 0.46% 985947 51 0.45% 990152 48 0.42% 994375 49 0.43%

11216 54 0.48% 11268 52 0.46% 11319 51 0.45% 11367 48 0.42% 11416 49 0.43%

2023/24

change

(t)

Change

(%)

average %

growth rate

329,365 11,101 3.26% 0.90%

0.37% Excluding 2020/21

Waste Stream

AGR

C&I

CD

E

Haz

LACW Secondary

LACWHH

LACWNHH

Waste Stream

AGR

C&I

CD

E

Haz

LACW Secondary

LACWHH

LACWNHH

LACW

total household

waste

LACW Source AMR

22/23

WYCA Growth Rates - Maximum

Growth

WYCA Growth Rates - baseline

2032

Growth

tpa

%

Growth 2033

Growth

tpa

%

Growth 2034

Growth

tpa

%

Growth 2035

Growth

tpa

%

Growth 2036

Growth

tpa

%

Growth

10261 0 0.00% 10261 0 0.00% 10261 0 0.00% 10261 0 0.00% 10261 0 0.00%

2621490 8,266 0.32% 2629540 8,050 0.31% 2637430 7,890 0.30% 2645200 7,770 0.29% 2645278 78 0.00%

605862 1,910 0.32% 607722 1,860 0.31% 609546 1,824 0.30% 611342 1,796 0.29% 611360 18 0.00%

1569395 4,949 0.32% 1574214 4,819 0.31% 1578937 4,723 0.30% 1583589 4,652 0.29% 1583635 46 0.00%

221302 698 0.32% 221981 679 0.31% 222647 666 0.30% 223303 656 0.29% 223310 7 0.00%

542248 1,105 0.20% 543308 1,060 0.20% 544321 1,013 0.19% 545333 1,012 0.19% 546343 1,010 0.19%

956970 1,951 0.20% 958840 1,870 0.20% 960629 1,789 0.19% 962414 1,785 0.19% 964197 1,783 0.19%

10986 22 0.20% 11008 22 0.20% 11028 20 0.18% 11049 21 0.19% 11069 20 0.18%

2032 Growth t%pa Growth 2033 Growth t%pa Growth 2034 Growth t%pa Growth 2035 Growth t%pa Growth 2036

Growth

tpa

%

Growth

10261 17468 0.63% 10261 17066 0.61% 10261 16778 0.60% 10261 16572 0.59% 10261 0 0.00%

2778790 4037 0.63% 2795856 3944 0.61% 2812634 3878 0.60% 2829206 3830 0.59% 2845889 16,683 0.59%

642216 10458 0.63% 646160 10217 0.61% 650038 10044 0.60% 653868 9921 0.59% 657723 3,855 0.59%

1663565 1475 0.63% 1673782 1440 0.61% 1683826 1417 0.60% 1693747 1399 0.59% 1703734 9,987 0.59%

234581 2302 0.41% 236021 2211 0.39% 237438 2119 0.37% 238837 2119 0.37% 240245 1,408 0.59%

565745 4062 0.41% 567956 3902 0.39% 570075 3740 0.37% 572194 3740 0.37% 574314 2,120 0.37%

998437 46 0.40% 1002339 45 0.39% 1006079 43 0.37% 1009819 43 0.37% 1013560 3,741 0.37%

11462 46 0.40% 11507 45 0.39% 11550 43 0.37% 11593 43 0.37% 11636 43 0.37%

Waste Stream

AGR

C&I

CD

E

Haz

LACW Secondary

LACWHH

LACWNHH

Waste Stream

AGR

C&I

CD

E

Haz

LACW Secondary

LACWHH

LACWNHH

LACW

total household

waste

LACW Source AMR

22/23

WYCA Growth Rates - Maximum

Growth

WYCA Growth Rates - baseline

Growth 2017 to 2036

Growth (t)

Total %

Growth

Av % Growth

0 0.00% 0.00%

156,149 6.27% 0.33%

36,088 6.27% 0.33%

93,480 6.27% 0.33%

13,182 6.27% 0.33%

23,591 4.51% 0.24%

41,635 4.51% 0.24%

478 4.51% 0.24%

Growth (t)

Total %

Growth

Av % Growth

0 0.00% 0.00%

340,162 13.58% 0.71%

78,616 13.58% 0.71%

203,643 13.58% 0.71%

28,716 13.58% 0.71%

48,378 9.20% 0.48%

85,378 9.20% 0.48%

980 9.20% 0.48%

Forecast Arisings

Median Growth

Waste Stream Baseline % Growth 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

2017 2018 Forecast

AGR 2,900 0.00% 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900

C&I 909,900 0.33% 912,903 915,915 918,938 921,970 925,013 928,065 931,128 934,201 937,284 940,377 943,480

CD 272,500 0.00% 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500

E 706,100 0.00% 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100

Haz 76,800 0.33% 77,053 77,308 77,563 77,819 78,076 78,333 78,592 78,851 79,111 79,372 79,634

LACW see 2023 0.37% 323,100 324,295 325,495 326,700 327,908 329,122

Total 2,310,999 2,315,515 2,320,047 2,324,595 2,329,157 2,333,736

Maximum Growth

Waste Stream Baseline % Growth 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

2017 2018 Forecast

AGR 2,900 0.50% 2,915 2,929 2,944 2,958 2,973 2,988 3,003 3,018 3,033 3,048 3,064

C&I 909,900 0.50% 914,450 919,022 923,617 928,235 932,876 937,540 942,228 946,939 951,674 956,432 961,215

CD 272,500 0.33% 273,399 274,301 275,207 276,115 277,026 277,940 278,857 279,778 280,701 281,627 282,557

E 706,100 0.33% 708,430 710,768 713,113 715,467 717,828 720,197 722,573 724,958 727,350 729,750 732,159

Haz 76,800 0.50% 77,184 77,570 77,958 78,348 78,739 79,133 79,529 79,926 80,326 80,728 81,131

LACW see 2023 0.40% 323,100 324,392 325,690 326,993 328,301 329,614

Total 2,340,898 2,350,583 2,360,309 2,370,077 2,379,887 2,389,738

difference = 29,900 35,068 40,262 45,482 50,729 56,003

2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042

2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900

946,593 949,717 952,851 955,996 959,150 962,315 965,491 968,677 971,874 975,081 978,299 981,527 984,766 988,016

272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500

706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100

79,897 80,161 80,425 80,691 80,957 81,224 81,492 81,761 82,031 82,302 82,573 82,846 83,119 83,393

330,339 331,562 332,789 334,020 335,256 336,496 337,741 338,991 340,245 341,504 342,768 344,036 345,309 346,586

2,338,330 2,342,940 2,347,565 2,352,206 2,356,863 2,361,536 2,366,224 2,370,929 2,375,650 2,380,387 2,385,140 2,389,909 2,394,694 2,399,496

2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042

3,079 3,094 3,110 3,125 3,141 3,157 3,172 3,188 3,204 3,220 3,236 3,253 3,269 3,285

966,021 970,851 975,705 980,584 985,486 990,414 995,366 1,000,343 1,005,344 1,010,371 1,015,423 1,020,500 1,025,603 1,030,731

283,489 284,425 285,363 286,305 287,250 288,198 289,149 290,103 291,060 292,021 292,984 293,951 294,921 295,894

734,575 736,999 739,431 741,871 744,319 746,775 749,240 751,712 754,193 756,682 759,179 761,684 764,198 766,720

81,537 81,945 82,354 82,766 83,180 83,596 84,014 84,434 84,856 85,280 85,707 86,135 86,566 86,999

330,932 332,256 333,585 334,919 336,259 337,604 338,955 340,310 341,672 343,038 344,410 345,788 347,171 348,560

2,399,632 2,409,569 2,419,548 2,429,570 2,439,635 2,449,743 2,459,895 2,470,090 2,480,329 2,490,612 2,500,940 2,511,311 2,521,727 2,532,188

61,303 66,629 71,983 77,364 82,772 88,208 93,671 99,161 104,679 110,226 115,800 121,403 127,033 132,693

Waste Stream Med Growth Max Growth

AGR 2,900 3,285

C&I 988,016 1,030,731

CD 272,500 295,894

E 706,100 766,720

Haz 83,393 86,999

LACW 346,586 348,560

2,900

988,016

272,500

706,100

83,393

346,586

3,285

1,030,731

295,894

766,720

86,999

348,560

A G R C & I C D E H A Z L A C W

PROJECTED WASTE ARISINGS BY

2042 UNDER TWO SCENARIOS

Med Growth Max Growth

Future Management Profiles

Scenario 1 - Recycling target led

Management Profile at end of Plan Period (2042)

Other Recovery

Waste Stream Recycling (%)

Non haz

Energy from

Waste (%)

Beneficial

use (%) Landfill (%)

Haz Waste

Treatment

(%)

AGR 75% 24% 0% 1%

C&I 75% 24% 0% 1%

CD 95% 4% 0% 1%

E 5% 0% 95% 0% 95% 4% 1%

Haz 0% 0% 0% 5% 95% 0.05 0 0

LACW 65% 34% 0% 1%

Scenario 2 - residual waste target led

Management Profile at end of Plan Period (2042) (to achieve 287kg/head residual waste by 2042)

Other Recovery

Waste Stream Recycling (%)

Non haz

Energy from

Waste (%)

Beneficial

use (%) Landfill (%)

Haz Waste

Treatment

(%)

AGR 79% 20% 0% 1%

C&I 79% 20% 0% 1%

CD 95% 4% 0% 1%

E 5% 0% 95% 0% 95% 4% 1%

Haz 0% 0% 0% 5% 95% 0.05 0 0

LACW 79% 20% 0% 1%

Residual waste arisings - reducing to 287kg per person by 2042

Residual waste arisings - reducing to 287kg per person by 2042

If residual waste arising is 2021 is taken as 521,088

And population in 2021 is taken as 812,000

And population growth rate is 0.75%

Year

Population

% Pop

increase

total

residual

waste (t)

kg/person

2021

812,000 0.75 521,088 642

2022 818,090 0.75 511,177 625 HIC CDE

2023 824,226 0.75 501,088 608 Coincinerator

6,860 0

2024 830,407 0.75 490,819 591 MSW

incinerator

387,183 0

2025 836,635 0.75 480,367 574 efw

incinerator

0 0

2026 842,910 0.75 469,732 557 coincinerator

0 0

2027 849,232 0.75 458,909 540 combustion 0 0

2028 855,601 0.75 447,898 523 sub-total 394,043

2029 862,018 0.75 436,696 507 landfill

(nonhaz)

126,493 19,693

2030

868,483 0.75 425,301

490

landfill

(SNRHW

cell)

552 557

2031 874,997 0.75 413,710 473 subtotal 127,045 20,250

2032 881,560 0.75 401,921 456 Total 521,088 20,250

2033 888,171 0.75 389,933 439

2034 894,832 0.75 377,742 422

2035 901,544 0.75 365,346 405

2036 908,305 0.75 352,743 388

2037 915,118 0.75 339,930 371

2038 921,981 0.75 326,905 355

2039 928,896 0.75 313,666 338

2040 935,863 0.75 300,210 321

2041 942,882 0.75 286,534 304

2042 949,953 0.75 272,637 287

355

Residual waste requiring management at 2042 = 272,637 21

17

Non haz Residual Waste

Arising (WDI 2021)

Other Recovery

For 287kg/hd residual waste

Waste

Stream

Waste arising

(max growth)

Recycling

(%) Recycling (t)

Non haz

Energy from

Waste (%)

Non haz

Energy from

Waste (t)

Beneficial

use (%)

Beneficial

use (t)

Non Haz

Landfill (%)

Non Haz

Landfill (t)

Haz waste

treatment

(%)

Haz waste

treatment t)

Haz waste

landfill (%)

Haz waste

landfill (t

Recycling 79% AGR 3,285 79% 2,595 20% 657 0% 0 1% 33 0% 0 0% 0

EfW 20% C&I 1,030,731 79% 814,277 20% 206,146 0% 0 1% 10,307 0% 0 0% 0

Landfill 1% CD 295,894 95% 281,100 4% 11,836 0% 0 1% 2,959 0% 0 0% 0

E 766,720 5% 38,336 0% 0 95% 728,384 0% 0 0% 0 0%

Haz 86,999 0% 0 0% 0 0% 0 0% 0 95% 82,649 5% 4,350

LACW 348,560 79% 275,362 20% 69,712 0% 0 1% 3,486 0% 0 0% 0

2,532,188 88% 11% 1% 16,785

Non-inert

non haz 1,382,576 79% 1,092,235 20% 272,708 0% 0 1% 13,826

CHECK 276,515 Haz landfill = 0

3,807

SCENARIO 1: Median Growth

Recycling Targets lead

Year Waste Type

Projected

Waste

Arisings

(Tonnes)

Recycling

Capacity

Requirement

(Tonnes)

Energy from

Waste Capacity

Requirement

(Tonnes)

Benefical Use

(Tonnes)

Landfill

Capacity

Requirement

(Tonnes)

Haz Landfill

Capacity

Requireme

nt (Tonnes)

Haz waste

treatment Recycling EfW

Non haz

Landfill Haz Landfill

Benefical

Use

2042 AGR 2,900 2,175 696 0 493 0 0 LACW+C&I CD Haz LACW+C&I CD Haz

2042 C&I 988,016 741,012 237,124 0 163,615 0 0 966,293 258,875 0 354,963 10,900 0 267,647 69,049 670,795

2042 CD 272,500 258,875 10,900 0 46,325 0 0 365,863

2042 E 706,100 35,305 0 670,795 0 0 0

2042 Haz 83,393 0 0 0 0 4,170 79,224

2042 LACW 346,586 225,281 117,839 0 57,214 0

2,399,496 1,262,648 366,559 670,795 267,647 4,170

Note: Projected Waste Arisings are calculated as: Baseline Waste Arisings * (1 + Growth Rate)^(Year - Base Year)

Management Requirements (e.g., Recycling) are calculated as: Projected Waste Arisings * Management Profile (%).

Landfill requirements

N.B. Assumes landfilling at rate anticpated at the end of the plan period over the life of the plan period

WDI 2023 Non Haz LF

Non Haz

(SNRHW) cell

Haz merchant

LF Inert LF

Total haz

waste

landfilled

Non haz

waste

landfilled

HIC waste received at Landfill = 37,396 82,606 0 0 120,002

Inert/C&D waste received at landfill = 111,503 55,573 76,340 20,981

Haz waste received at landfill = 4,980 1,481 5,581 0 12,042

Totals = 153,879 139,660 81,921 20,981

Totals

Waste Type Waste Type 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 Non-haz Haz

AGR Arisings 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900

LF 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 493 0

C&I Arisings 937,284 940,377 943,480 946,593 949,717 952,851 955,996 959,150 962,315 965,491 968,677 971,874 975,081 978,299 981,527 984,766 988,016

LF 9,373 9,404 9,435 9,466 9,497 9,529 9,560 9,592 9,623 9,655 9,687 9,719 9,751 9,783 9,815 9,848 9,880 163,615 0

CD Arisings 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500 272,500

LF 2,725 2,725 2,725 2,725 2,725 2,725 2,725 2,725 2,725 2,725 2,725 2,725 2,725 2,725 2,725 2,725 2,725 46,325 0

E Arisings 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100 706,100

LF 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Haz Arisings 79,111 79,372 79,634 79,897 80,161 80,425 80,691 80,957 81,224 81,492 81,761 82,031 82,302 82,573 82,846 83,119 83,393

LF 3,956 3,969 3,982 3,995 4,008 4,021 4,035 4,048 4,061 4,075 4,088 4,102 4,115 4,129 4,142 4,156 4,170 0 69,049

LACW Arisings 326,700 327,908 329,122 330,339 331,562 332,789 334,020 335,256 336,496 337,741 338,991 340,245 341,504 342,768 344,036 345,309 346,586

LF 3,267 3,279 3,291 3,303 3,316 3,328 3,340 3,353 3,365 3,377 3,390 3,402 3,415 3,428 3,440 3,453 3,466 57,214 0

267,647 69,049

Non-haz 15,394 15,437 15,480 15,523 15,567 15,610 15,654 15,698 15,742 15,786 15,831 15,875 15,920 15,965 16,010 16,055 16,100 251,547

Haz 3,956 3,969 3,982 3,995 4,008 4,021 4,035 4,048 4,061 4,075 4,088 4,102 4,115 4,129 4,142 4,156 4,170 64,880

Totals (linear reduction): Non-haz 120,002 114,534 109,065 103,597 98,128 92,660 87,191 81,723 76,254 70,786 65,317 59,849 54,380 48,912 43,443 37,975 32,506 27,038 21,569 16,101 1,001,324

Haz 12,042 11,628 11,213 10,799 10,385 9,971 9,556 9,142 8,728 8,313 7,899 7,485 7,070 6,656 6,242 5,828 5,413 4,999 4,585 4,170 112,271

BUoL 670,795 670,795 670,795 670,795 670,795 670,795 670,795 670,795 670,795 670,795 670,795 670,795 670,795 670,795 670,795 670,795 670,795 11,403,515

Non haz landfil capacity required over the plan period = 1,001,324

Haz landfil capacityrequired over the plan period = 112,271

Beneficial Use on Land 11,403,515

Actual Non haz landfill at 2023 (WDI) = 120,002 Haz landfill at 2023 (WDI) = 12,042

Non haz Landfill by 2042 if targets met = 16,100 Non haz Landfill by 2042 if targets met = 4,170

Difference = 103,902 Difference = 7,872

No. of years = 19 No. of years = 19

Linear reduction per year = 5468.5 Linear reduction per year = 414.3

SCENARIO 2 Maximum Growth

Residual Waste Target Lead

Year Waste Type

Projected

Waste

Arisings

(Tonnes)

Recycling

Capacity

Requirement

(Tonnes)

Energy from

Waste Capacity

Requirement

(Tonnes)

Benefical Use

(Tonnes)

Landfill

Capacity

Requirement

(Tonnes)

Haz Landfill

Capacity

Requireme

nt (Tonnes)

Haz waste

treatment Recycling EfW

Non haz

Landfill Haz Landfill

Benefical

Use

2042 AGR 3,285 2,595 657 0 493 0 0 LACW+C&I CD Haz LACW+C&I CD Haz

2042 C&I 1,030,731 814,277 206,146 0 168,421 0 0 1,089,640 281,100 0 275,858 11,836 0 275,361 71,078 728,384

2042 CD 295,894 281,100 11,836 0 49,000 0 0 287,694

2042 E 766,720 38,336 0 728,384 0 0 0

Haz 86,999 0 0 0 0 4,350 82,649

LACW 348,560 275,362 69,712 0 3,486 0 0

2,532,188 1,411,671 288,351 728,384 221,399 4,350

Note: Projected Waste Arisings are calculated as: Baseline Waste Arisings * (1 + Growth Rate)^(Year - Base Year)

Management Requirements (e.g., Recycling) are calculated as: Projected Waste Arisings * Management Profile (%).

Landfill requirements

Totals

Waste Type Waste Type 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 Non-haz Haz

Benefical

Use on Land

AGR Arisings 3,033 3,048 3,064 3,079 3,094 3,110 3,125 3,141 3,157 3,172 3,188 3,204 3,220 3,236 3,253 3,269 3,285

LF 30 30 31 31 31 31 31 31 32 32 32 32 32 32 33 33 33 537 0

C&I Arisings 951,674 956,432 961,215 966,021 970,851 975,705 980,584 985,486 990,414 995,366 1,000,343 1,005,344 1,010,371 1,015,423 1,020,500 1,025,603 1,030,731

LF 9,517 9,564 9,612 9,660 9,709 9,757 9,806 9,855 9,904 9,954 10,003 10,053 10,104 10,154 10,205 10,256 10,307 168,421 0

CD Arisings 280,701 281,627 282,557 283,489 284,425 285,363 286,305 287,250 288,198 289,149 290,103 291,060 292,021 292,984 293,951 294,921 295,894

LF 2,807 2,816 2,826 2,835 2,844 2,854 2,863 2,872 2,882 2,891 2,901 2,911 2,920 2,930 2,940 2,949 2,959 49,000 0

E Arisings 727,350 729,750 732,159 734,575 736,999 739,431 741,871 744,319 746,775 749,240 751,712 754,193 756,682 759,179 761,684 764,198 766,720

LF 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Haz Arisings 80,326 80,728 81,131 81,537 81,945 82,354 82,766 83,180 83,596 84,014 84,434 84,856 85,280 85,707 86,135 86,566 86,999

LF 4,016 4,036 4,057 4,077 4,097 4,118 4,138 4,159 4,180 4,201 4,222 4,243 4,264 4,285 4,307 4,328 4,350 0 71,078

LACW Arisings 326,993 328,301 329,614 330,932 332,256 333,585 334,919 336,259 337,604 338,955 340,310 341,672 343,038 344,410 345,788 347,171 348,560

LF 3,270 3,283 3,296 3,309 3,323 3,336 3,349 3,363 3,376 3,390 3,403 3,417 3,430 3,444 3,458 3,472 3,486 57,404 0

275,361 71,078

Non-haz (2042) 16,785 0

Haz (2042) 4,350 0

Totals: Non-haz 120,002 114,570 109,137 103,705 98,272 92,840 87,407 81,975 76,542 71,110 65,677 60,245 54,812 49,380 43,947 38,515 33,082 27,650 22,217 16,785 1,024,157

Haz 12,042 11,637 11,232 10,828 10,423 10,018 9,613 9,208 8,804 8,399 7,994 7,589 7,184 6,780 6,375 5,970 5,565 5,160 4,756 4,351 129,016

Benefical use on land 728,384 728,384 728,384 728,384 728,384 728,384 728,384 728,384 728,384 728,384 728,384 728,384 728,384 728,384 728,384 728,384 728,384 12,382,520

Non haz landfil capacity required over the plan period = 1,024,157

Haz landfil capacity required over the plan period = 129,016

Beneficial Use on Land required over the plan period = 12,382,520

Actual Non haz landfill at 2023 (WDI) = 120,002 Haz landfill at 2023 (WDI) = 12,042

Non haz Landfill by 2042 if targets met = 16,785 Non haz Landfill by 2042 if targets met = 4,350

Difference = 103,217 Difference = 7,692

No. of years = 19 No. of years = 19

Linear reduction per year = 5432.5 Linear reduction per year = 404.8

Existing waste management capacity

C’posting

Haz waste

treat’t

(Tpa) (Tpa)

Agricultural N/A 0 N/A N/A N/A N/A 0 0

Commercial

and Industrial

(C&I)

1,238,805 40,000 434,100 0 0 0 0 0

Construction

and

Demolition

(C&D)

427,929 0 110,513 0 0 0 0 0

Excavation 0 0 0 398,818 501,086 0 0 0

Hazardous 103 0 0 0 0 0 21,559 30,150

LACW 1,040,931 14,339 200,000 0 0 0 0 0

Total 2,707,768 54,339 744,613 899,904 0 0 21,559 30,150 4,458,333

Haz waste

TFS (Tpa)

Waste

Stream

Recycling

(Tpa)

EFW (Tpa)

Beneficial

Use

(Tonnes)

Non Haz

Landfill (T)

Haz Landfill

(T)

Ball Park Waste Management Capacity Gaps/Surplus

Key

Surplus

Gap

Median Growth

Recycling Targets lead

Haz waste

treatment

Composting

(Tpa) (Tpa)

Agricultural N/A N/A N/A see below see below 0 0 0

Commercial and

Industrial (C&I)

497,793 196,976 0 see below see below 0 0 40,000

Construction and

Demolition (C&D)

169,054 99,613 0 see below see below 0 0 0

Excavation -35,305 0 -10,503,611 see below see below 0 0 0

Hazardous 103 0 0 see below see below 21,559 -49,074 0

LACW 815,650 82,161 0 see below see below 0 0 14,339

Total 1,447,295 378,750 -10,503,611 -1,001,324 -112,271 21,559 -49,074 54,339

Total waste management requirements = 2,399,496

Total existing waste management capacity = 4,458,333

Capacity Gap/Surplus = 2,058,837

Maximum Growth

Residual Waste Target lead

Haz waste

treatment

Composting

(Tpa) (Tpa)

Agricultural N/A N/A N/A see below see below 0 0 0

Commercial and

Industrial (C&I)

424,528 227,954 0 see below see below 0 0 40,000

Construction and

Demolition (C&D)

146,829 98,677 0 see below see below 0 0 0

Excavation -38,336 0 -11,482,616 see below see below 0 0 0

Hazardous 103 0 0 see below see below 21,559 -52,499 0

LACW 765,569 130,288 0 see below see below 0 0 14,339

Total 1,298,693 456,919 -11,482,616 -1,024,157 -129,016 21,559 -52,499 54,339

Total waste management requirements = 0

Total existing waste management capacity = 0

Capacity Gap/Surplus = 0

Haz waste

TFS (Tpa)

Waste Stream

Recycling

(Tpa)

EFW (Tpa)

Beneficial

Use

(Tonnes)

Non Haz

Landfill

(T)

Haz Landfill

(T)

Haz Landfill

(T)

Haz waste

TFS (Tpa)

Waste Stream

Recycling

(Tpa)

EFW (Tpa)

Beneficial

Use

(Tonnes)

Non Haz

Landfill

(T)

Haz waste

treatment

Composti

ng

(Tpa) (Tpa)

Agricultural[

1]

N/A N/A N/A see total beloswee total below 0 0 0

C&I 498,000 197,000 0 see total beloswee total below 0 0 40,000

C&D 169,000 100,000 0 see total beloswee total below 0 0 0

Excavatio

n

-35,300 0 -10,500,000 see total beloswee total below 0 0 0

Hazardous 103 0 0 see total beloswee total below 21,559 -49,000 0

LACW 815,600 82,200 0 see total beloswee total below 0 0 14,300

Total 1,447,403 379,200 -10,500,000 -1,001,324 -112,271 21,559 -48,813 54,300

Haz waste

treatment

Composti

ng

(Tpa) (Tpa)

Agricultural[

1]

N/A N/A N/A see total beloswee total below 0 0 0

C&I 424,500 228,000 0 see total beloswee total below 0 0 40,000

C&D 147,000 98,600 0 see total beloswee total below 0 0 0

Excavatio

n

-38,300 0 -11,483,000 see total beloswee total below 0 0 0

Hazardous 100 0 0 see total beloswee total below 21,600 -52,500 0

LACW 766,700 130,600 0 see total beloswee total below 0 0 14,300

Total 1,300,000 457,200 -11,483,000 -955,965 -109,927 21,600 -52,500 54,300

[1] Agricultural waste management capacity gaps have not been separately identified as it is assumed the small quantities arising for

management off site would be managed at sites managing C&I and C&D waste.

Haz

Landfill

(T)

Haz waste

TFS (Tpa)

Waste

Stream

Recycling

(Tpa)

EFW

(Tpa)

Beneficial

Deposit (T)

Non Haz

Landfill

(T)

Haz

Landfill

(T)

Haz waste

TFS (Tpa)

Waste

Stream

Recycling

(Tpa)

EFW

(Tpa)

Beneficial

Deposit (T)

Non Haz

Landfill

(T)

[1] Agricultural waste management capacity gaps have not been separately identified as it is assumed the small quantities arising for

management off site would be managed at sites managing C&I and C&D waste.

Year Region ONS code Jpp Order Authority

Authority

type

Residual

household waste

per household

(kg/household)

(Ex NI191)

Percentage of

household waste

sent for reuse,

recycling or

composting (Ex

NI192)

Percentage of

municipal waste

sent to landfill (Ex

NI193)

Collected

household waste

per person (kg) (Ex

BVPI 84a)

2023-24 Yorkshire andE H0u8m00b0e0r35 91 Leeds City CounciUl MnitBaCry 530.5 35.3% 0.1% 366.1

Total local

authority

collected

waste

(tonnes)

Household -

total waste

(tonnes)

Household -

waste sent

for recyclingcompostingreuse

(tonnes)

Household

dry recyclingreuse

(tonnes)

Household

green recyclingreuse

(tonnes)

Household -

waste not

sent for

recycling

(tonnes)

Household - regular

collection (not

recycled) (tonnes)

Household - civic

amenity sites (not

recycled) (tonnes)

Household - other

sources (not recycled)

(tonnes)

Household -

estimated rejects

(tonnes) - See

"Notes" sheet for

detail on rejects

calculation.

Nonhousehold

-

total waste

(tonnes)

Nonhousehold

-

waste sent

for recyclingcompostingreuse

(tonnes)

Nonhousehold

-

waste not

sent for

recycling

(tonnes)

Nonhousehold

-

estimated

rejects

(tonnes)

Local

authority

collected

waste - sent

for recyclingcompostingreuse

(tonnes)

Local

authority

collected

waste - not

sent for

recycling

(tonnes)

Local

authority

collected -

estimated

rejects

(tonnes)

329,365 306,657 108,331 61,520 46,811 198,326 155,831 17,182 15,239 10,074 22,708 11,239 11,469 - 119,570 209,795 10,074

2013/14 2014/15 change (t) Change (%) 2015/16 change (t) Change (%) 2016/17 change (t) Change (%) 2017/18 change (t) Change (%) 2018/19 change (t) Change (%) 2019/20 change (t)

total

household

waste 305,359 305,618 259 0.08% 309,163 3,545 1.16% 314,931 5,768 1.87% 306,024 -8,907 -2.83%

LACW

Source AMR

22/23 325,572 323,965 -1,607 -0.49% 331,043 7,078 2.18% 338,630 7,587 2.29% 333,895 -4,735 -1.40% 317313 -16,582 -4.97% 319691 2,378

2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24

LACW

Source AMR

22/23 tonnes 323,965 331,043 338,630 333,895 317313 319691 335,972 340,466 329,365

2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24

Percentage growth -0.49 2.18 2.29 -1.4 -4.97 0.75 5.09 1.34 3.26

2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24

Percentage growth -0.49 2.18 2.29 -1.4 -4.97 0.75 1.34 3.26

2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2021/22 2023/24

-0.49 2.18 2.29 -1.4 -4.97 0.75 1.34 3.26

0

0.2

0.4

0.6

0.8

1

1.2

Chart Title

0

0.2

0.4

0.6

0.8

1

1.2

Chart Title

0

0.2

0.4

0.6

0.8

1

1.2

Chart Title

Change (%) 2020/21 change (t) Change (%) 2021/22 change (t) Change (%) 2022/23 change (t) Change (%) 2023/24 change (t) Change (%) average % growth rate

0.75% 335,972 16,281 5.09% 340,466 4,494 1.34% 329,365 11,101 3.26% 0.90%

0.37%