Find out how we’re lowering the risk of flooding from Farnley Wood Beck to properties around Churwell with our Flood Alleviation Scheme (FAS)
Why Farnley Wood Beck needs flood protection
[redundant culvert structure upstream of Elland Road]
Leeds City Council has secured funding to carry out a flood risk study and to deliver a flood alleviation scheme to address property flooding from Farnley Wood Beck. This beck has caused major flooding in the past, particularly in 2005. There is also frequent flooding of the highway in this area.
Our plans to reduce the risk of flooding

[A map of the area under consideration for this scheme]
Our investigation into potential solutions has identified that flood risk to Old Close from Farnley Wood Beck can be reduced significantly by removing the redundant culvert structure upstream of Elland Road to increase the capacity of the beck. In addition, we will be improving road drainage and conducting vegetation management along the channel to reduce the risk of woody debris causing blockages downstream.
Updates on our progress
Construction will begin on Monday 26th September 2022 and is expected to continue until early 2023, subject to weather conditions. Our contractors BMMjv will be on site between the hours of 08:00-18:00, Monday to Friday.
To allow the work to take place there will be temporary traffic management on Elland Road. This will consist of a single lane closure that will be in place outside of peak hours.
Contact us
Sign up to our Farnley Wood Beck FAS mailing list for regular updates on project progress.
Include ‘Farnley Wood Beck FAS' when you contact us for more information and updates:
Email: FRM@leeds.gov.uk
Discover more

Hybrid Ecologies: Creative Interpretation at Sheepscar Beck
There's a new engaging artwork coming to Sheepscar Beck, co-created by the local community and artist Katie Surridge, inspired by the hidden wildlife in our urban environment.

Farnley Wood Beck Natural Flood Management scheme
Find out how we're delivering NFM measures to help reduce flood risk

Leeds Flood Alleviation Scheme Legacy Information

Sheepscar Beck Flood Alleviation Scheme Legacy Information
Find out more about the scheme to repair and sustain the existing level of flood risk in the area.

Leeds Flood Alleviation Scheme Murals
Information on the installation of two murals on the Leeds FAS control room buildings

Consultation - Flood Risk Management Strategy
Have your say on our draft Local Flood Risk Management Strategy

Feedback on the Meanwood Valley Farm Demonstrator Site and Meanwood Rain Chain
A short survey to accompany the information given at the Meanwood Valley Farm Summer Fair

Thorner Beck Flood Alleviation Scheme Preferred Option
Have your say on the preferred option for reducing flood risk to properties in Thorner from Thorner Beck

Sheepscar Beck FAS
We aim to carry out repair works to sustain the existing level of flood risk in the area.
ਜਾਣਕਾਰੀ ਵਿੱਚ ਰਹੋ
ਆਉਣ ਵਾਲੀਆਂ ਗਤਿਵਿਧੀਆਂ ਅਤੇ ਪ੍ਰੋਜੈਕਟ ਸੰਬੰਧੀ ਤਾਜ਼ਾ ਖ਼ਬਰਾਂ ਬਾਰੇ ਸੂਚਨਾਵਾਂ ਲਈ ਸਾਡੇ ਪ੍ਰੋਜੈਕਟਾਂ ਨੂੰ ਫਾਲੋ ਕਰੋ।