Addiscombe East traffic improvement proposals
We would like feedback on ideas to trial new traffic improvement measures in the Addiscombe East area. This will take place on Elgin Road, Havelock Road, Outram Road and Ashburton Road (commonly known as the ‘’HOME ladder’’ roads).
Local residents, the HOME Residents Association (HRA), along with ward councillors have voiced their concerns about high traffic volumes, congestion, poor driver behaviour, and general safety on these roads.
Current concerns:
Local residents have reported that the affected roads experience:
- High levels of rat-running traffic, as drivers use the roads to avoid congestion on both Addiscombe and Lower Addiscombe roads
- Increased speeds, noise and congestion
- Unsafe environment for children, people with mobility impairments and cyclists
Local residents have asked us to act and respond to their concerns.
Existing traffic calming measures:
The roads already benefit from several measures that are intended to manage traffic including:
- Road humps
- Northbound one way working on Ashburton Road
- A 20mph limit
- A vehicle weight restriction (except for loading)
Proposed changes:
- Priority working arrangements: new buildouts (small traffic islands) that reduce the road width (narrowing) at key points which will reduce the volume of traffic on the roads
- Cycle safety: bypasses allowing cyclists to navigate the narrowed points safely.
- Signs & road markings: new high visibility signage, upgrade current signs and refresh existing markings
- The installation of the priority working arrangements would require a reduction of parking spaces on each of the roads.
Benefits of the proposals:
- Reduction of of rat-running along the roads
- Less noise
- Slower vehicle speeds
- Improved overall road safety for vulnerable road users and cyclists
- If after the trial the scheme becomes permanent, we will look to install SuDS within some of the traffic islands. SuDS help to manage rainwater naturally, reduce the risk of surface flooding and add greenery that enhances the streetscape.
Feedback from the survey will be analysed and considered as part of the decision on whether trial scheme is progressed.
This survey closes at midnight on Sunday 29 March.
Drawings that show where the changes would be made are available below.
Check out the following documents
Stay Informed
Follow our projects to get notified of upcoming engagements and the latest project related news.
