bnazxentxqjcwpadm36w.jpg
Project

Bruce Castle PlayZone Information

All project information including designs, planning information and project updates.

Bruce Castle Park

Project Updates

Design amendments 

  • We intended to install a 4G infill artificial turf pitch as part of the portfolio of four PlayZones across the borough, to accommodate high demand for high quality football pitches. This was originally designated for Downhills Park, but after comparing both consultation results, we will have the 4G pitch at Bruce Castle. This is because football and artificial turf were rated as more popular at Bruce Castle and to ensure basketball provision remains in Downhills Park.

  • We will be installing backless seating and bins between the new PlayZone and remaining court so spectators are able to sit in both directions and create more flow between both spaces. 

  • The new footpath that will be installed will curve with the natural contour of the landscape towards Lordship Lane. 

 

Booking system 

  • The booking system and programme will respond to community desire for mixed open access and booked/coaching sessions. The recommendation is for open access 3-6pm on weekdays and 9-12pm and 3-6pm on weekends. This system will be managed by Haringey Council and can be further refined based on testing and feedback. 

  • Signage and clear instructions on how to book will be provided. 

  • Floodlighting will only be activated during booked sessions, and floodlighting will not extend beyond 9pm. This would be the same operational times as we have in other parks. 

 

Other concerns 

  • The remaining MUGA will only get an upgrade to its surface and markings, subject to funding becoming available. 

  • The location of the table tennis will be monitored post-installation to determine whether moving this to a different location would ease concerns about anti-social behaviour. 

  • In August, we had an independent ecologist conduct site surveys in order to assess the current ecological state, key ecological constraints and opportunities associated with the project, possible mitigation requirements and any further surveys required. This has identified mature trees with potential for bat roosting habitat which will require considerate lighting design. We are currently undertaking further bat surveys and working with our internal lighting department and contractors to ensure lighting is appropriate.  

Steel Warriors 

  • Steel Warriors are currently seeking external funding to deliver the calisthenics gym in Bruce Castle. If successful, recommendations will be made for inclusive design and introductory, women’s only and family programming.  

  • Location close to the PlayZone facility will be recommended and further appraisal will be conducted. 

  • Concerns regarding anti-social behaviour will be assessed and monitored by enforcement officers. 

 

Our full engagement report is available here for viewing here. 

Final Design

Planning Application

The Bruce Castle PlayZone planning application is now live and full details can be viewed here: PlayZone Application, Advert Consent. 

Discover more

jre6atggvhl0cl76lqwt.png
Open

Improvements to the Paddling Pool

Haringey Council are surveying the Paddling Pool and once any essential repairs are carried out we would like to her your ideas on improvements, currenty examples include:
Sun shades
Improved seating
Improved surfacing around the pool edge.

Project:Bruce Castle Park
Participate Now
xxmnb3qrwbutw11aqh5u.jpg

Bruce Castle Park - Summary of Final Engagement on Play Equipment

This is to provide an update on which suggested changes have made it into the final design, which did not, and the reasons for it.

Posted:
Read More
Bruce Castle Park photo showing grass and trees in summer

Bruce Castle Park Playground - Public Vote

We will share up to three design proposals with local residents to pick their favourite early in the new year 2026 (exact dates to be confirmed).

Posted:
Read More
bird-s-eye-view-clouds-field-102726_rqgjxq.jpg

Bruce Castle PlayZone and Calisthenics Engagement Report

Following engagement held this Spring/Summer, we are happy to share our engagement report which has been utilised in finalising the PlayZone design and programming, alongside informing next steps for

Posted:
Read More
nkgjj2gjiepozra79t4x.jpg
Closed

Bruce Castle Park Playground - Have your say on the winning proposal!

We need your feedback on the design for the playground until 29/03/2026.

Project:Bruce Castle Park
Bruce Castle Park - grass area and large trees
Closed

Bruce Castle Park Playground - Public Vote is now open!

We have now received two designs to be voted on by the local residents.

Project:Bruce Castle Park
mmfav5axkvnzwkccawjh.jpg
Closed

Bruce Castle Park PlayZone & Calisthenics Gym Equipment Survey

Give your feedback on the PlayZone upgrade to the current Multi Use Games Area (MUGA) and proposals for Calisthenics gym equipment in the park.

Project:Bruce Castle Park
Bruce Castle Park Playground
Closed

Bruce Castle Park Playground Consultation Survey

Have your say online via our consultation survey

Project:Bruce Castle Park
txbhcpup7rqroumq6hpr.jpg

Engagement Dates

Want to have your say in-person? Find out how else you can be involved and feed into the process.

Posted:
Read More

Stay Informed

Follow our projects to get notified of upcoming engagements and the latest project related news.