This is to provide an update on which suggested changes have made it into the final design, which did not, and the reasons for it.
Engagement Dates
Dear Residents,
We are excited to let you know that we have agreed the final amendments to the playground improvement works at Lordship Recreation Ground with the successful supplier. This summary is to explain why some suggested changes have made it into the final design, while others did not.
Colours:
Some survey comments expressed a preference for greens/more neutral colours that blend in with the park setting and asked whether greens and browns could be used instead of red and grey. Red was largely replaced with green as a result, apart from accents on the mound platform to the slide (this was to make the connection with existing red pieces).
The grey ‘castle’ tops and wall panels were retained to avoid the equipment looking too similar to proposed new equipment in nearby Downhills Park which features a green and beige colour scheme. This is being produced by the same supplier which would have compounded similarities.
Equipment:
We have slightly tweaked accessible/sensory features to create more variation: replaced a sensory panel with a rain wheel and added a musical piece (pentatonic cam chimes).
We have also added flat/static monkey bars to replace the trapeze rings that had been initially proposed.
Connectivity/sightlines:
We removed some fencing panels and included a connecting pathway between the nature area to the toddler area to make it easier for parents to move between/keep an eye on different areas within the playground.
Changes that couldn’t be considered:
- Could the embankment slide be wider to add variation – unfortunately a wider slide couldn’t be accommodated with the existing levels, and changing the levels wasn’t feasible within the budget
- Add more toddler cradle swing seats – due to budget and spatial constraints, more toddler swings couldn’t be accommodated
Additional notes on the budget and impacts on the design:
A small number of items couldn’t been included in the contract budget under the originally submitted design, and we needed to find savings within the scheme to pay for them. They included repairs of existing play equipment, the provision of informal play equipment in the area of the historic multi-play unit outside the fenced area which will be removed, and the preparation of the area under the old zipline to become a rock garden in future.
We solved this by omitting a 3D frog and lady bird from the scheme. They would have been located in the proposed nature area which should feature natural looking materials. We also moved some of the Robinia balancing pieces not requiring safety surface from the mound to the area of the historic climbing piece. Lastly, we reduced the extent of resurfacing in the nature area to retain the existing grassed area patch for a future planting area.
You can also find the overall Engagement Summary Report linked below, which was used to develop the high-level specification for the playground that the tender documents were based on, and includes online survey data diagrams as well as summaries of survey responses and individual engagement sessions.
Check out the following documents
Discover more

Lordship Recreation Ground Playground - Public Vote
We will share up to three design options online for local residents to pick their favourite early in the new year 2026 (exact dates to be confirmed).

Engagement Dates
Want to have your say in-person? Find out how else you can be involved and how else you can feed into the process.

Lordship Recreation Ground Community Survey
Have your say online via our consultation survey
Stay Informed
Follow our projects to get notified of upcoming engagements and the latest project related news.