9d43dbd2-0ade-47e3-bb5c-bab405c32abd.jpg
Project

Noel Park

Find out more about the project.

Noel Park

Noel Park

Housing is a top priority for Haringey Council. There are around 3,000 families living in temporary accommodation, and over 10,000 people on the waiting list for council housing. We are committed to delivering a new generation of council homes for local people. Our preference is to build as many of these new council homes ourselves, on our own land wherever possible.

You can find out more about our ambitious plans across the borough at haringey.gov.uk/haringey-homes

Proposals for Noel Park, N22 include:

  • Building two new homes on separate sites located on Farrant Avenue and Morley Avenue. Both properties will be let at council rents.
  • At each location, we propose to build a two-storey, three bedroom house with front and rear gardens.
  • The Morley Avenue proposal involves the removal of three existing garages.
  • On Farrant Avenue, we propose removing two existing garages.
  • Current Site

    The location of the proposal for Farrant Avenue is shown below:

    The location of the proposals for Morley Avenue is shown here:

    Proposed designs of the new homes

    Both proposed homes have been designed with respect to the character of Noel Park Conservation Area and reflect the appearance of neighbouring properties.

    Floor plans

    Both homes will be built to the same specifications. The footprint of the proposed homes reflect the shape of the site and neighbouring plots. It widens towards the rear to accommodate a large living, kitchen and dining area which opens up onto the back garden. The remainder of the ground floor provides additional living space, storage and a WC. The first floor presents two bedrooms and a bathroom with the third bedroom provided in the roof space. More detail on these proposals can be viewed in our document library.

    Building materials and landscaping

    Haringey Council is committed to ensuring that new homes will be environmentally sustainable, with a target of achieving zero carbon where possible. Each new home will have high levels of insulation and other features that will keep running costs low. They will be constructed with responsibly sourced and environmentally friendly materials.

    The approximate timeline for both sites is shown below, though please note our public consultation is now taking place in November:

    Arhoswch yn wybodus

    Dilynwch ein prosiectau i gael hysbysiadau am weithgareddau sydd ar ddod a'r newyddion diweddaraf am brosiectau.