
Project Overview
Learn more about the project and view proposals
Haringey Civic Centre Redevelopment
Project Overview
The Civic Centre, located at 255 High Road, Wood Green, London N22 8LE, was the first civic centre of its size to be built from scratch after the Second World War.
Now, the Grade II listed building is being fully redeveloped. The 66-year-old site will gain a new annex, high-quality office space, and restored civic areas all designed to be shared with the community in the heart of Wood Green.
Celebrating heritage and improving sustainability
We’re restoring the historic building to create a welcoming and functional space for residents and council staff, while celebrating its character and rich local history. Sustainability is a key part of the design, with eco-friendly systems and materials being integrated throughout.
Once complete, the Civic Centre will accommodate more than 800 council staff and hundreds of visitors, with space for local people and community groups. It’s set to become a source of civic pride for the borough.
Work is underway
Construction is now underway, led by contractor Sisk, working in partnership with architects Hawkins\Brown and planning and heritage consultants Montagu Evans. Together, they’re making sure the building’s heritage is protected and enhanced.
Design and building works are progressing, with historically important features being preserved and restored, while the rest of the building is being modernised to meet future needs.
The refurbished Civic Centre is expected to reopen in summer 2026, creating a modern landmark that reflects the borough’s values and ambitions.
A space for all
This redevelopment allows the council to bring its core office accommodation together on one site creating a flexible, accessible environment that supports new ways of working and better service delivery for residents.
The site will also be open to the community, with improvements to the surrounding landscape to maximise public access. This includes a new woodland garden area, which will be co-designed with local residents.
Here’s what the new Civic Centre will offer:
- Office space: Council teams will be based here, with layouts designed to support collaboration and integration across departments.
- Civic & Democratic Functions: The Council Chamber and Committee Rooms will be used flexibly for meetings, training, and events.
- Shared Space: A multi-function co-working and collaboration area will be available for staff, partners, and visitors by appointment — with a mix of touchdown spaces, meeting rooms, and breakout zones.
- Sustainability: The building will be energy-efficient, designed using Passive Haus principles, and will include on-site energy generation.
This project is also the first step in reducing the number of council offices in Wood Green — helping deliver savings and freeing up Station Road sites for future housing and economic growth.
Delivering high-quality design
The project has been developed in line with LB Haringey’s Development Management DPD Policy DM1: Delivering High Quality Design.
The Quality Review Panel Report (18 January 2023) stated:
“The panel warmly supports the proposals for the Haringey Civic Centre, which will give a valued heritage asset an extended lease of life in public service.
The project team has responded well to the comments from the previous review (held on 27 April 2022) and presented a scheme that is sensitive, works well, and is in keeping with the spirit of the original building.”
You can view images of the Civic Centre before its closure, along with CGI visuals showing how the restored building will look, below.
Civic Centre (before closure)
Civic Centre CGI's (External)
Civic Centre CGI's (Internal)
View the Civic Centre Redevelopment Proposals here:
Haringey Civic Centre - A new home for Haringey Council.pdf
Site Context and History.pdf
Heritage and Conservation.pdf
Design principles - An environment to enrichen lives.pdf
Reception and movement - Access and Security.pdf
Internal layouts - Transforming working culture.pdf
Workspace design - A flexible working environment .pdf
Landscape - Accessibility and inclusivity.pdf
A sustainable future.pdf
Facilities - Amenities to support the working environment.pdf
Planning Application
The planning application for the project has approved.
You can see the planning application online by entering the below reference:
There is a separate application for the Listed Building Consent:
Discover more

Civic Centre Time Capsule
A Time Capsule is coming to Haringey.

Celebrating creativity in our community
We are collaborating with local creative facilitator Damali Ibreck and nearby schools to create vibrant artworks that will brighten the Civic Centre development hoardings.

Construction underway
Progress being made on the Civic Centre

Civic Voices
Share your experiences and memories of Haringey’s Civic Centre

Document Library
Click here for supporting documents

All news on the Civic Redevelopment
All news on the Civic Centre redevelopment

You said, we are listening
See our responses to people's feedback

Engagement Events
A summary of all engagement events held
Stay Informed
Follow our projects to get notified of upcoming engagements and the latest project related news.














