Markfield Park Playground - Summary of Final Engagement on Play Equipment

This is to provide an update on which suggested changes have made it into the final design, which did not, and the reasons for it.

Markfield Park Engagement Dates

Dear Residents,

We are excited to let you know that we have agreed the final amendments to the playground improvement works at Markfield Park with the successful supplier. This summary is to explain why some suggested changes have made it into the final design, while others did not.

Overall approach:

Following the survey on play equipment tweaks and further engagement with local councillors during March 2025, the design has been adjusted to strengthen play opportunities for older children. This has informed several changes to the originally submitted design, which are outlined below.

Equipment:

We have increased the focus on climbing and more challenging play by enhancing the main climbing offer. This includes the addition of monkey bars and an inclined climbing slope as separate features, and the retention and repair of the existing rope climber.

We are also retaining and repairing the existing toddler climbing piece, additionally to repairs of existing toddler play equipment. We thereby ensure value for money while maintaining and improving provision for younger children, by adding a new play boat to the playground.

In response to requests, we have included an additional swing seat for older children, as well as including a combined junior/adult (‘you and me’) seat on the existing toddler swing frame.

The trampoline that was initially proposed as an optional item has been removed from the design to allow budget to be reallocated towards improving the overall play value for a higher number of children.

We had comments on seating and can confirm that existing will be retained, and additional formal and informal seating provided within the works.

Layout and materials:

The layout has been adjusted to improve the relationship between play elements, including relocating the play boat into the grassed area, closer to the toddler area. This helps strengthen connections between areas within the playground and improves usability.

We have also considered requests for more natural finishes. While timber swing supports are not achievable within the available budget, we have included painting the metal swing frames in a colour that will blend in better with the proposed Robinia timber features.

Changes that couldn’t be considered:

Installation of a zipline – although requested during consultation and supported by councillors, this cannot be accommodated within the available space and budget for this phase of works. We will continue to explore opportunities to deliver this in future as part of a separate as yet unfunded project adjacent the existing playground.

Installation of a sensory feature – one suggestion to provide a tree as sensory feature will not be fully realised as part of the works; we will however look into turning a beech tree trunk into a sensory item as part of a separate as yet unfunded project.

Installation of a crawling tunnel – this fell outside the budget.

Additional notes on the budget and impacts on the design:

In order to accommodate the requested improvements, particularly those enhancing provision for older children, we have needed to make savings elsewhere within the scheme. This has included omitting optional items such as the trampoline and thermoplastic play markings, and limiting planting works within the contract. Planting works will be delivered as a separate project once the main playground works have been completed.

You can also find the overall Engagement Summary Report linked below, which was used to develop the high-level specification for the playground that the tender documents were based on, and includes online survey data diagrams as well as summaries of survey responses and individual engagement sessions.