Improving Down Lane Park Together.

Improving Down Lane Park Together.

Making Down Lane Park Better – Together!

Since 2022, we’ve been working with the community to improve Down Lane Park, N17.

Phases 1 & 2b are complete! Have a look at what’s been delivered and read answers to your FAQs.

What’s next?

If you want to find out more about the future plans, explore our Future Phases FAQs for all the details.

About the project

Email

Timeline

Forming the Community Design Group

December 2021 - January 2022
Bringing together 10 representatives from the local community, from a range of interest groups: community groups, active travel, youth, residents' association, sports clubs, park user groups, disability + Cllrs Ruth Gordon and Mike Hakata, Cabinet Leads for Placemaking and Co-designing green spaces.

Laying the foundations of co-design

February 2022 - May 2022
Council and Community Design Group coming together; agreeing Terms of Reference; Design by Consensus capacity building workshop; understanding opportunities & constraints; walkabout of the park, study visits to other London parks

Co-design: Park concept designs (Options 1 & 2)

May 2022 - September 2022
Five design workshops with (landscape architectural) design team; exploring uses and locations; prioritisation; focus on play, maintenance, and costs; group and round table discussions

Public Engagement # 1

3rd October 2022 - 23rd October 2022
In person engagement event 11.00-4.00pm, Sat 8th October at Living Under One Sun in Down Lane Park; In person engagement event 3.30 -7.00pm, Thurs, 13th October at Mitchley Road Hall; In person 'pop up' engagement event 10.30am - 1.00pm, Sat, 22nd October in Down Lane Park; 3rd - 23rd Oct, outdoor public exhibition of engagement boards and design options by the Tennis Courts in Down Lane Park; 3rd - 23rd October, engagement on-line survey on Commonplace

Independent Design Review # 1

19th October 2022 - 19th October 2022
Independent design scrutiny and advice from Urban Design London's Environmental Design Review Panel, supported by the Mayor of London's Green & Resilient Spaces Fund.

Co-design: Park (detailed) & Community Hub (concept) design

October 2022 - May 2023
Three design workshops with (landscape + building architectural) design team; developing preferred design option for the park; and exploring location, function and form of Community Hub building; focus on play, maintenance, and costs; group and round table discussions

Public Engagement # 2

15th May 2023 - 28th May 2023
A mix of in-person and on-line engagement activity seeking feedback on a single 'preferred' design option for the park and options for a permanent Community Hub building

Independent Design Review # 2

17th May 2023 - 17th May 2023
Independent Design review from Haringey Council's Quality Review Panel

Assessing cost, affordability & equality

June 2023 - Oct 2023
Calculating the cost of designs and optimising both design and cost; assessing the affordability of the Community Hub building; assessing the equalities impact of preferred designs

Planning Application & Planning Authority decision

November 2023 - February 2024
Submit Planning Application to Local Planning Authority seeking approval for proposed designs; approximate 10-12 week consideration period; Local Planning Authority 'determination' to grant or refuse; Planning Applications Committee 5th February 2024

Detailed Construction Design (Phase 1 works)

September 2023 - December 2023
Preparation of detailed construction design drawings for Phase 1 of Works Programme

Delivery (Construction) Phase 1 Improvement Works

15th January 2024 - 4th August 2024
new and enhanced, wider and resurfaced pathways, supportive user comfort and active travel tree, meadow, and under planting, supporting habitat creation and biodiversity Sustainable Urban Drainage (SuDS) basins and improved drainage, supporting climate change resilience canopy lifting, new lighting, and better natural surveillance, supporting improved safety new and improved entrances, supporting improved safety, connectivity, and access

Construction Design (Phases 2-4)

November 2023 - February 2024
Detailed construction design of remaining phases of the landscape masterplan and Community Hub building, including café and garden; Cost Planning; optimising costs and designs

Delivery (Construction) Phase 2b Improvement Works

August 2024 - December 2024
Construction of Phase 2b of the park improvement works, infrastructure, play, planting, lighting and seating improvements to the remainder of the northern part of the park

Reviewing cost, affordability and resident priorities (Phase 2a and Phase 3)

2025
A review of proposed savings for the remaining phases of the project, including the new Community Hub building, café and garden, sports courts and new play area.

Planning Application & Planning Authority decision

2025

Start on Site: Phase 2a Improvement Works

2026
Construction of Community hub, Cafe and Garden

Start on Site: Phase 3 Improvement Works

2026
Construction of Phase 3 of the park improvement works, including new children's play area, new basketball and netball courts, planting and hard landscaping to southern section of the park

News

43 items

Pop‑Up Engagement Event at Down Lane Park

Join us at our pop‑up engagement event and help shape the new under‑12s play area at Down Lane Park.We’ll be sharing our updated plans for the park and inviting children, families and local residents

Posted:
View Update

Pop-up engagement event on Saturday 24 January in Down Lane Park.

Join our pop-up engagement event and help co-design the new under-12s play area. In the new year we will be hosting a community pop-up event to share the councils updated plans for Down Lane Park

Posted:
View Update
wswqd0mkrnh9xtj9oiiw.png

Work is in progress to improve community facilities in Down Lane Park!

We’re moving forward with improvements to make Down Lane Park an even better place for the community to enjoy. Here’s what’s coming:New Playground & Entrance: The former bowling green will stay cl

Posted:
View Update
yrwndwwonphuleptyyxj.jpg

Fun activities for free in Down Lane Park

Haringey Council are extending their summer programme of free activities at Down Lane Park on until the end of October, and have added some new activities for different ages. Just turn up to join in t

Posted:
View Update
kezfpweroxkyeaijxi2b.jpg

Feedback Summary and Project Update

Thank you to everyone who responded to the online survey and attended the in-person meetings in May and thank you for your patients while we collated and reviewed all of your feedback.We have produced

Posted:
View Update
Play tower at Down Lane Park

Last chance to complete our Feedback Form!

Remember to have your say on future improvements to Down Lane Park by completing our feedback form online, which is due to close Friday 30th May.Your comments will be used to inform the next steps for

Posted:
View Update
c9y778l1qxbimwjclkbf.png

Opportunity to feedback on our plans for future phases at Down Lane Park

We have launched an online feedback form so you can feedback on the revised plans for future phases at Down Lane Park.You can view the revised plans for future phases and share your feedback here

Posted:
View Update
jxezphlfzighbzcdhlnk.png

Design Proposals Workshop, this evening, 6-7pm at Welbourne Primary

We look forward to welcoming residents and park users to the workshop this evening from 6-7pm at Welbourne Primary School. Please use the entrance gate from High Cross Road. At the workshop offic

Posted:
View Update
image credit: Levitt Bernstein Architects

Design Proposals Workshop - Wednesday 14th May 6-7pm

The next workshop is scheduled for Wednesday 14th May from 6-7pm at Welbourne Primary School. As before, please use the entrance gate from High Cross Road. At this workshop we will invite residents an

Posted:
View Update
Down Lane Park

Down Lane Park Design Proposals Workshop

Hi All,Thank you for your patience while we obtained confirmation of our room booking for this evenings meeting. We will be hosting this evening workshop at Harris Academy Tottenham Secondary Sch

Posted:
View Update
Down Lane Park

UPDATED: Down Lane Park Community Q&A and Updates Meeting

Dear All, Thank you for your patience while we finalised a venue for tomorrow evenings Q&A meeting. Unfortunately, there has been limited availability, so it has taken some time to find

Posted:
View Update
Down Lane Park

Down Lane Park Q&A and Updates meeting

Dear Park User,I hope you are well and that you are enjoying the completed Phase 1 and 2b of the improvements to Down Lane Park.It is disappointing news that Living Under One Sun have decided not to c

Posted:
View Update
gpayvs2dxw1idayyvdyb.jpg

Second phase of Down Lane Park improvements are complete!

The new play area for young people over 12 opened at the end of December, significantly enhancing the park's facilities. The latest play facilities in the park include: A new 11-meter play tower with

Posted:
View Update
chjec8qogdyr2ivo9tr9.jpg

Community Activities in the Park and plans for the Woodland Play Area (Phase 2b)

Neighbourhood Green and Healthy Living Festival Join Living Under One Sun for a day of family activities, live music, and food, at the Neighbourhood Green and Healthy Living Festival this Saturda

Posted:
View Update
DLP_Banner%20Option%202.jpg

Phase 2b Improvements. Access restrictions and Diversions

Down Lane Park Improvements (Phase 2b) are underway, continuing until December 2023. As part of our exciting programme of green and open spaces improvements the next phase of the Down Lane P

Posted:
View Update
3862%20site%20photos_KD%20230724.jpg

First phase of Down Lane Park Improvements complete!

First phase of Down Lane Park improvements are now open to the public On Friday 2nd August the remaining phase 1 works opened to the public, concluding the delivery of the phase 1 improvements, c

Posted:
View Update
IMG-20240717-WA0006%201.jpg

Down Lane Park Phase 1 works are almost complete!

Community Design Group Phase 1 Sneak Preview Earlier this week Tottenham Hale Ward and Cabinet Member for Placemaking & House Building Cllr Ruth Gordon met with members of the&

Posted:
View Update
Join Haringey Council and TCV to learn how to build a dead hedge for wildlife at Down Lane Park, as part of our improvement works. We will meet outside Living Under One Sun, on Saturday 29 June 2024 at 10am. The workshop ends at 2:30pm. Booking is essential, book your place on Eventbrite. Link below.

Learn to build a dead hedge for wildlife at Down Lane Park, as part of the improvement works.

Join us at Down Lane Park on Saturday 29 June, 10am - 2:30pm and learn how to build a dead hedge as part of ongoing improvement works! As part of the ongoing improvements to Down Lane Park, TCV H

Posted:
View Update
Join Living Under One Sun and Go Grow With Love for a 10 week land based programme to learn all about our food and land heritage, organic food growing, soil care, preparation, cultivation, harvest and land maintenance. The course will be running 10am-3pm on Thursdays from 16th May - 25th July (no session on 30th May) at the Living Under One Sun Allotment, East Hale Allotments, Mill Mead Road, N17 9QU. Please contact chloe@livingunderonesun.co.uk for more information.

Opportunity for women and girls to boost their green skills

Join Living Under One Sun and Go Grow With Love for a 10 week land based programme to learn all about food and land heritage, organic food growing, soil care, preparation, cultivation, harvest an

Posted:
View Update
Working together to improve Down Lane Park. An architectural impression of what the new wildflower swales will look like once completed.

Phase 1 Improvements: Frequently Asked Questions, January 2024 - June 2024 (April Update)

Tree management works will be undertaken in Down Lane Park in the week commencing Monday 22 April.  The works will involve lifting low tree canopies, trimming around lighting columns, and re

Posted:
View Update
Counsellors and members of the Community Design Group inspect Phase 1 improvement works

Community Design Group Phase 1 site visit

Down Lane Park Phase 1 Site Visit On Saturday, 9th March Haringey Cllrs Ruth Gordon, Mike Hakata, Emily Arkell, and Sean O’Donovan met in Down Lane Park with members of the Community Design

Posted:
View Update
Image showing the extent of Phase 1 works, access restrictions, and diversion routes

Phase 1 Improvement Works: Frequently Asked Questions (FAQs)

Thank you to everyone who have been in touch about the Down Lane Park improvement project. We are working hard to minimise the disruption caused by the Phase 1 works, as we will in subsequent Phases.

Posted:
View Update
19fe9053-fdbb-40f0-a57e-f4be8285b363.jpg

Co-designed improvements to Down Lane Park given go ahead

Community-led plans for the wide-scale transformation of Down Lane Park for the benefit of the Tottenham Hale community have taken a huge step forward. On Monday evening, Haringey Council’s Planning S

Posted:
View Update
cf31b5e6-c3b1-4233-8e42-da4fd70d96c2.jpg

Phase 1 park improvements to start on site 15th January 2024

Phase 1 of improvements to Down Lane Park will start on site on Monday, 15th January 2024. Following nearly two years of co-design with the local community, 20 co-design meetings with the local Commu

Posted:
View Update
4e080ee9-6fa1-4f47-8775-818f8c277e37.png

Co-designed improvements to Down Lane Park submitted for planning

Community-led plans to deliver major improvements to Down Lane Park in Tottenham Hale have been submitted to Haringey Council. You can view a selection of key images illustrating the proposals by clic

Posted:
View Update
47de41a3-d0d1-4374-9590-c3b1e03dfd9e.jpg

Get involved! Join the Park User & Community Forum and help select the committee for this next year.

The Down Lane Park User and Community Forum will be holding it’s Annual general Meeting on Saturday 11 November from 2-3:30pm at Living Under One Sun Community Hub. This is a big milestone for the gr

Posted:
View Update
d6725e53-bfff-4657-a602-d5dfd4419b98.png

Summary of Public Engagement & Landscape Masterplan

Since February 2022 Haringey Council and a Community Design Group (CDG) made up of local residents and community representatives, have been working with landscape architects Levitt Bernstein Associate

Posted:
View Update
c28663c8-1544-43ff-9542-938cb199184b.jpg

Improved community access to Harris Academy Tottenham sports and performance hire facilities

During co-design and throughout public engagement in Oct -Dec ’22 and May ’23 residents and park users told us that the sports facilities in Down Lane Park (Artificial Grass Pitch and Tennis courts) a

Posted:
View Update
fdb22b4c-233b-485b-9134-46f052bb03be.jpg

Transformation of Tottenham Hale open spaces gets £6m cash boost

Community-led plans to deliver two of the most ambitious parks projects in the capital have moved a step closer thanks to a massive £6m cash injection from Haringey Council. View the full update her

Posted:
View Update

Thank you for your support and participation - June 23

We would like to take a moment to express our thanks to each and every one of you who joined us at our events and workshops and took the time to complete our survey. Your presence, enthusiasm, and unw

Posted:
View Update

Cllr Ruth Gordon invites residents and park users to feedback on proposals for Down Lane Park

Cllr Ruth Gordon, Cabinet Member for House-Building, Placemaking and Development, invites residents and park users to attend one of a series of public engagement events or complete the on-line survey

Posted:
View Update
d7cd50c1-03fb-4567-bb34-52a295b7e3b6.jpg

Down Lane Park public engagement and on-line survey now live! Have your Say!

Two weeks of public engagement inviting resident and park user feedback on the latest design proposals for Down Lane Park is now live! The first of two themed workshops on ‘sports, recreation and spac

Posted:
View Update
5acdec4f-7d55-43fe-9d1c-0d121196786a.jpg

Help shape plans to improve Down Lane Park

See the updated park design proposals – Monday 15 May to Sunday 28 May. The latest park design proposals draw on the valuable feedback and advice provided by park users and residents, received through

Posted:
View Update
d13ae511-f4be-4719-8027-8b024ecf46c8.jpg

Community-led plans to improve Down Lane Park get £750,000 funding boost

Community-led plans to improve Down Lane Park have received a £750,000 boost from the Mayor of London’s Green and Resilient Spaces Fund (GRSF) round two. The project received GRSF development funding

Posted:
View Update
418e6180-8ff7-4f7d-a29a-886de7e775aa.jpg

Down Lane Park Improvement – Community Researchers

When we engaged around the early stage designs for Down Lane Park in October 2022, we didn’t reach as many young people as we would have liked. To address this the Council has been working with young

Posted:
View Update
c31527df-65ca-43c8-b06c-c9df94ba564a.jpg

Down Lane Park Improvement - Engagement Summary (findings to date)

Thank you to everyone who shared their thoughts on plans for early-stage designs for Down Lane Park. In total, we welcomed 100 people to three in-person engagement events and received 134 responses t

Posted:
View Update
2525b3bd-da8d-4059-bca3-76bd8b43cb92.jpg

Frequently Asked Questions - Update on Ashley Gardens development, Ashley Road, Tottenham Hale

Frequently Asked Questions - Update on Ashley Gardens development, Ashley Road, Tottenham Hale Down Lane Park_Frequently Asked Questions_Dec 2022.pdf Further to the FAQs and clarifications shared by t

Posted:
View Update
2dba528d-e36f-4f67-8e99-60cacb18956c.jpg

Survey prize draw winners receive ASDA vouchers

The three-week period of public engagement around early-stage design options for Down Lane Park has now concluded. Over 100 people came to our face-to-face engagement events, and we received 118 compl

Posted:
View Update
2b19f5af-140c-46db-8b3b-4e13098ef3f3.jpg

Come to a ‘pop up’ engagement event in Down Lane Park, 10.30 – 1.00pm, Saturday, 22nd October

We’ll be in Down Lane Park 10.30 – 1.00pm, Saturday 22nd October to talk to you about the two early-stage design options for Down Lane Park. Please do come along, see the park design options, talk to

Posted:
View Update
44940ef5-c625-4ba0-8d1f-326f7298300b.jpg

Eary stage design options for Down Lane Park subjected to independent design review

Supported by the Mayor of London, the two early-stage design options for Down Lane Park have been reviewed by Urban Design London's Environmental Design Review Panel. UDL is a not-for-profit organ

Posted:
View Update
1b6f25fd-e0d1-4d99-b3ee-c34d43f40957.jpg

View the models of the two design options we're engaging around and provide your feedback

Join us at our next in person 'drop in' engagement event 3.30 - 7.00pm, Thursday, 13th October 2022 at Mitchley Road Hall, N17 9HG

Posted:
View Update
1ba921a7-ff91-4557-a9c0-0bdc0744d26d.jpg

Down Lane Park Outdoor Public Exhibition: Come and see and provide feedback on the early-stage design options

Have your say ! The engagement boards display the two park design options we are seeking feedback on, as well as more information about the proposed approach and options for entrances and boundaries

Posted:
View Update
7fd51b8f-71de-4c7f-a0f1-dff7a9c723fa.jpg

Down Lane Park Improvement Engagement Events, 3rd - 23rd October 2022

11.00 -4.00pm, Saturday 8th October at Living Under One Sun Community Hub in Down Lane Park, N17 9EX 3.30 - 7.00pm, Thursday, 13th October at Mitchley Road Hall, Mitchley Road, N17 9HG or You can view

Posted:
View Update

Meet the team

London Borough of Haringey
London Borough of Haringey

Haringey Council is leading this project, working with the Community Design Group and our appointed design team, lead by Levitt Bernstein Architects.

At the start of this year, we set out to develop a vision for the future of Down Lane Park. Together we have developed two early design options which we want to hear your feedback on.

Read London Borough of Haringey privacy policy

Levitt Bernstein
Levitt Bernstein

Levitt Bernstein is a multi-disciplinary practice of architects, landscape architects and urban designers. For the Down Lane Park project we are leading a design team of others specialists in areas such as lighting, ecology, drainage, inclusive access and structural engineering.

We are proud to be involved in this transformative project, working with
the community design group and realising ambitions local people have for Down Lane Park. We have a strong track-record in public park design and have devised new masterplans for several public parks in London. These have included inclusive play, sports and leisure provision, new planting strategies, sustainable drainage principles and public art integration.

We are award-winning designers and place great emphasis in putting the needs of people at the heart of our work. Each of our projects is unique but the driving force behind every one is the desire to create an
environment that is beautiful, sustainable and functional.

DLP
Down Lane Park Community Design Group

The Community Design Group (CDG), made up of volunteers local community representatives and elected Councillors, is working with the design team to shape the design proposals for the park, supported by Council officers.

As local residents, representatives of different interest groups, and park users they bring an in-depth knowledge of the area and lived-experience to the project.

Coherent Cities
Coherent Cities

Coherent Cities helps organisations communicate, collaborate and compete more coherently, based on the premise that all successes – and most failures – come back to people. We believe the way to give projects and teams more traction is by helping the people involved be more effective, whether that’s through confidence, sector intelligence, inclusion, finding common language or finding the right partners.

Director Lisa Taylor is the connector and core of the company, delivering the services on this site. We also coordinate associate input, adding socio-economic, placemaking and masterplanning consultancy; political, policy and demographic research; sustainability assessment; cross-sector recruiting; organisational development and more.

Huntley Cartwright
Huntley Cartwright

Huntley Cartwright provide Quantity surveying and construction cost management advice.

We control and manage project costs from inception to completion with integrated risk, change and value management procedures.

We are able to advise on procurement and contract strategies, prepare tender documentation, administer the tender process and manage the appointment of the contractor.

During the construction stage we value work completed, prepare regular financial reports, agree the cost of changes and on completion, agree the final account. At all stages, we manage and keep clients informed of the final project cost.

Read Huntley Cartwright privacy policy

THD Consulting Engineers
THD Consulting Engineers

THD Consulting Engineers was established in 2005 and offers comprehensive Mechanical, Electrical and Plumbing (MEP) design service from concept to completion led by highly experienced engineers.

Civic Engineers
Civic Engineers

We are engineers with a passion and expertise in the design and delivery of high quality award winning buildings, structures and public spaces.

Our engineering skills cover both structural and civil, including movement, highways, flood risk, drainage, sustainable drainage and earthworks amongst others.

Civic Engineering is the fusion of all these skills. We believe this fusion of expertise is essential to resolving the complex and competing needs of our towns and cities, leading to the design of innovative, sustainable and economically viable structures, neighbourhoods and environments, where we seek to work with the prevailing geography of a place

Read Civic Engineers privacy policy

Light Follows Behaviour
Light Follows Behaviour

Light Follows Behaviour has a fresh approach to lighting design: more inclusive, more meaningful, more engaging. Light is the powerful tool we use to change spaces and cities.

Based in London we go wherever our projects take us, because the place and its people are the most important and inspiring starting points.

We are strategic thinkers with a critical understanding of how urban design and architecture flourish through light. Transforming cities and spaces needs collective, radical approaches; so through our work we weave the disciplines of social researchers, urban planners, architects, brand designers, and (other) lighting designers. Their knowledge, skills and experiences allow us to deliver the strategies that build unique and sustainable experiences of light.