
Belmont Rec pond and wildlife area
Find out more information about the pond, its planting and habitats.
PlayZone Information
About our new pond and wildlife area
The pond was created in March 2026 by ReNature, in partnership with local volunteers and Haringey Parks department, to support wildlife at Belmont Recreation Ground. It includes shallow edges and deeper areas, making it easy for amphibians to move in and out. The pond will support wildlife such as frogs, newts, dragonflies and damselflies.
Planting for wildlife
The pond has been planted with a range of native species to support insects and aquatic life. These include:
- Myosotis scorpioides (Water forget-me-not)
- Juncus effusus (Common rush)
- Veronica beccabunga (Brooklime)
- Nymphaea alba (White waterlily)
- Persicaria amphibia (Amphibious bistort)
Wildflower areas and bee habitats
Excavated soil was separated into topsoil and London clay sub soil to create mounds of diverse substrates for different flowering plants. Thanet sand was used to add a soft, low nutrient medium to attract different plants and for mining bees to nest in. The mounds are planted with native wildflowers including:
- Achillea millefolium (Yarrow)
- Centaurea nigra (Common knapweed)
- Prunella vulgaris (Selfheal)
- Cynosurus cristatus (Crested dogstail)
- Leucanthemum vulgare (Oxeye daisy)
Additional habitats
Around the pond, you can find a range of features designed to help wildlife:
- Dead branches for insects and perching birds
- A small dead hedge of twigs for fungi, beetles and wood mice
- A mini hibernaculum for newts and slow worms
- A clay wall for mason and flower bees to nest in, covered by a small green roof
- A low, recycled rubble wall with clay mortar (for spiders and mason bees)
- Bee towers drilled with “beetle” holes for bees to nest in
We have already recorded mallard ducks, water boatmen, damselflies, broad bodied chasers, mining bees and mason bees using the site.
In September 2026, ReNature will be hosting an ecology walk around the pond and local area. More details to follow.
Wildlife pond plan
Discover more

Belmont Rec Masterplan development
Detail on the masterplan process and up to date masterplan design

Project Updates
Find out about key project milestones and information across the project lifecycle

PlayZone Information
We are sharing responses to some frequently asked questions regarding the new PlayZone in Belmont Rec.

Engagement Report
Following engagement held this Spring, we have now collated all information available for viewing in our engagement report. We have also provided an engagement summary.

Engagement Dates
Dates for in person, online and targeted engagement with local stakeholders.

Masterplan and sustainable drainage design survey (RIBA 3)
A short survey to help us understand whether the detailed designs successfully respond to the project priorities and to identify any further improvements before the design is finalised.

PlayZone location public vote
We have listened to all the feedback received across different engagement platforms and with different demographics. We appreciate there has been both support for and significant concerns raised around the PlayZone proposal.
As a result, we undertook an independent Preliminary Ecological Assessment and an appraisal of alternative locations across Belmont Rec and are now presenting 3 viable options for Public Vote to determine the best position for the PlayZone in Belmont Rec.

Friends of Belmont Rec: Masterplan survey
Masterplan developed by local residents from Merrett Houmøller Architects.

Belmont Rec general survey
A survey about current uses and aspirations of Belmont Rec.
Stay Informed
Follow our projects to get notified of upcoming engagements and the latest project related news.
