Project

Chestnut improvements

Find out more about Chesnut Estate Public Area improvements

The Tottenham Hale Green & Open Spaces Strategy

Chesnut Estate Public Areas

Find out more about Chestnut Estate Public Area improvements, works underway and completed.

A group of people riding bikes on a road

<p>Description automatically generated" class="fr-fic fr-dii" /></p><p><strong>Chesnut Road Phase 2</strong></p><p>Chesnut Road Phase 2 is part of our wider <a href=Tottenham Hale Streets and Spaces Programme.

It builds on the design and engagement undertaken on Chesnut Road phase 1, creating a pedestrian-led environment with additional planting and high-quality paving materials which will calm traffic and improve conditions for walking and cycling. 

The following improvements have been agreed and planned with local residents for phase 2:

  • Newlon Housing Trust to deliver a new play area and reinstate lawn as part of development works.
  • Haringey Council to reinstate Fairbanks Lawn to its original condition upon completion of the works to Walter Tull House. This will be delivered as part of the Welbourne development.
  • Haringey Council to take possession of Courtyard 3 to use as a site during the Chesnut Road Phase 2 works and to facilitate residents’ access as required during the works period.

Engagement to date

  • Engagement was carried out with residents on the Chesnut Estate in Autumn 2023 comprising liaison with the Chesnut RA, a drop-in session at Protheroe House and targeted engagement with residents around Fairbanks Road regarding proposals for new play facilities as part of the Monument Way development.
  • This engagement process gave residents the opportunity to view and ask questions about the proposals for Chesnut Road alongside other works in the vicinity of the estate.

We have also:

  • Held police safety meetings, community safety and design out crime walks with residents around the playground/Fairbanks lawn.
  • Estate greening walk with tree officers, staff and architects including residents from Protheroe House.
  • Letter drops by staff and door knocking on a playground survey.

Review all the designs and engagement information.

Haringey Council is investing over 1.75 million pounds into the scheme with support from the Mayor of London.

The construction will be carried out by our Highways team contractor who is delivering all of the Tottenham Hale Streets and Spaces works.

Programme of activity

  • The Chesnut Road works have started on-site in July 2024, and to complete by March 2025.
  • The programme has been directly informed by the completion of works at Monument Way and Walter Tull. The works to Chesnut Road could not commence until the construction works completed.

If you have any questions about the scheme, please email tottenhamregeneration@haringey.gov.uk

Check out the following documents

people walking on a sidewalk

Chesnut Phase 1 improvements

The Chesnut Road public realm improvement project completed in November 2019 and was the first project to be delivered from the Tottenham Hale Green and Open Spaces Strategy.

The objectives were to:

  • Better connect Down Lane Park to Tottenham High Road, improve access to open spaces for local residents with a new cycle and pedestrian route, as part of the wider ‘Quiet-ways’ project
  • Create a ‘Pocket park’ with leisure facilities and playful public spaces for Chesnut estate residents and more to enjoy
  • Create a safe welcoming and inclusive space for all
  • Make sure the project was future proof and easily maintained

The following improvements were delivered:

  • Informal play spaces along the route that incudes climbing & balancing frame wooden features, a scooter track and play boulders
  • An outdoor gym for all ages
  • Improved lighting, including feature lighting along the route
  • CCTV
  • Flooding prevention features that includes Rain Gardens and Swales
  • Wooden sculptures both large and small that also serves as playable art for children to enjoy
  • Hard and soft landscaping improvements, including those open green spaces either side of the route

Haringey Design Awards

In Oct 2021, Haringey held the Haringey Design Awards at Alexandra Palace Theatre. Winners were announced in eight categories on the night and Chesnuts Road won the Placemaking Award. 

Find out more about the awards here.

Stay Informed

Follow our projects to get notified of upcoming engagements and the latest project related news.