Artist's impression of Civic Centre
Project

Project Overview

Learn more about the project and view proposals

Haringey Civic Centre Redevelopment

Project Overview

The Civic Centre, located at 255 High Road, Wood Green, London N22 8LE, was the first civic centre of its size to be built from scratch after the Second World War.

Now, the Grade II listed building is being fully redeveloped. The 66-year-old site will gain a new annex, high-quality office space, and restored civic areas all designed to be shared with the community in the heart of Wood Green.

Celebrating heritage and improving sustainability

We’re restoring the historic building to create a welcoming and functional space for residents and council staff, while celebrating its character and rich local history. Sustainability is a key part of the design, with eco-friendly systems and materials being integrated throughout.

Once complete, the Civic Centre will accommodate more than 800 council staff and hundreds of visitors, with space for local people and community groups. It’s set to become a source of civic pride for the borough.

Work is underway

Construction is now underway, led by contractor Sisk, working in partnership with architects Hawkins\Brown and planning and heritage consultants Montagu Evans. Together, they’re making sure the building’s heritage is protected and enhanced.

Design and building works are progressing, with historically important features being preserved and restored, while the rest of the building is being modernised to meet future needs.

The refurbished Civic Centre is expected to reopen in summer 2026, creating a modern landmark that reflects the borough’s values and ambitions.

A space for all

This redevelopment allows the council to bring its core office accommodation together on one site creating a flexible, accessible environment that supports new ways of working and better service delivery for residents.

The site will also be open to the community, with improvements to the surrounding landscape to maximise public access. This includes a new woodland garden area, which will be co-designed with local residents.

Here’s what the new Civic Centre will offer:

  • Office space: Council teams will be based here, with layouts designed to support collaboration and integration across departments.
  • Civic & Democratic Functions: The Council Chamber and Committee Rooms will be used flexibly for meetings, training, and events.
  • Shared Space: A multi-function co-working and collaboration area will be available for staff, partners, and visitors by appointment — with a mix of touchdown spaces, meeting rooms, and breakout zones.
  • Sustainability: The building will be energy-efficient, designed using Passive Haus principles, and will include on-site energy generation.

This project is also the first step in reducing the number of council offices in Wood Green — helping deliver savings and freeing up Station Road sites for future housing and economic growth.

Delivering high-quality design

The project has been developed in line with LB Haringey’s Development Management DPD Policy DM1: Delivering High Quality Design.

The Quality Review Panel Report (18 January 2023) stated:

“The panel warmly supports the proposals for the Haringey Civic Centre, which will give a valued heritage asset an extended lease of life in public service.
The project team has responded well to the comments from the previous review (held on 27 April 2022) and presented a scheme that is sensitive, works well, and is in keeping with the spirit of the original building.”

You can view images of the Civic Centre before its closure, along with CGI visuals showing how the restored building will look, below.

Civic Centre (before closure)

Civic Centre CGI's (External)

Civic Centre CGI's (Internal)

Planning Application

The planning application for the project has approved. 

You can see the planning application online by entering the below reference:

HGY/2023/1043

There is a separate application for the Listed Building Consent:

HGY/2023/1044

Stay Informed

Follow our projects to get notified of upcoming engagements and the latest project related news.