Street view of Ferry Lane
Project

Ferry Lane (phase 1)

Phase 1 of Ferry Lane improvements

Projects underway in Tottenham Hale

Ferry Lane improvements

Background

In 2021, Haringey Council improved part of Ferry Lane,  which forms a key route into the borough and to the centre of Tottenham Hale.

The improvements extend from the junction of Millmead Road and continue eastwards along Ferry Lane up to the borough boundary with Walthamstow. The improvements made along the route encourage residents and visitors to stay longer to appreciate the distinct character of the route with its adjoining open spaces and waterways either side.

The improvements to Ferry Lane include the following:

  • Raised cycle lanes that are separated from the traffic to protect cyclists from motorists. They have also served to change driver behaviour and reduce vehicle speeds along the route.
  • Footpath improvements and re-surfacing of the road.
  • New sustainable drainage system to manage flooding, through the creation of swales (shallow, wide and vegetated channels that are designed to slow down the flow of water) within The Paddock and Rain Gardens along Ferry Lane; these also contribute to the existing rich wildlife through soft planting and biodiversity enhancements.

  • De-cluttering and removal of the large and unattractive lighting structure that was referred to as the ‘Razor light’, situated next to Ferry Lane bridge.
  • New trees and planting along the front of The Paddock and the junction with Bream Close.
  • Installation of new street lighting columns to indicate the entrance to Tottenham Hale. The lights are LED energy-efficient and environmentally sensitive by reducing light pollution.

  • Artwork features along the route that are centred around the theme of the wetland environment and the transition from the District Centre at Tottenham Hale to the Walthamstow Wetlands.

Stay Informed

Follow our projects to get notified of upcoming engagements and the latest project related news.