Preliminary works complete
Preliminary works to treat Japanese Knotweed are now complete, May 2023.
The Paddock Enhancement Project
Works completed to remove Japanese Knotweed

The first phase of the comprehensive enhancement scheme to improve The Paddock community nature reserve was completed in May 2023, allowing The Paddock to fully re-open to the public.
Our specialist contractors, Ebsford Environmental Ltd., successfully cleared the significant Japanese Knotweed infestations and decades of fly-tipping that have blighted the site.
Using the ‘cell burial’ method of excavating, sealing and burying the Japanese Knotweed in a geo-textile membrane, The Paddock has been largely cleared of the Knotweed that was colonising the site and depriving native species of their habitat.
With each area of Knotweed that was excavated, tonnes of historic fly-tipping and dumped building waste was discovered, making the task of burying the Knotweed rhizomes more complicated. The contractors discovered enough dumped vehicle parts to re-build a car! 30 tonnes of rubbish in total!
The cleared Knotweed has now been encapsulated in 6,400 sq.m. of geo-textile membrane, creating a secure cell with a life of 50 years. The cell has been capped with over 3,300 tonnes of soil, delivered to the site in 234 truckloads sourced from a local supplier to keep environmental impacts to a minimum.
The cleared space in now a new meadow as well as new ‘wet meadow’ or boggy area. The meadow will be planted with wildflowers to improve the biodiversity of The Paddock, while the wet meadows will help diversify the range of habitats on site.
Ebsford Environmental have kindly sponsored and undertaken hydro-seeding of the meadow, ensuring that the planting can become established through the Spring.
Due to the challenges of undertaking excavations close to the waterway, some of the Japanese Knotweed infestations close to the River Lee have been left in situ. These will be treated through a sensitive chemical treatment programme.
With the completion of this first phase of enhancement works, plans for the main works to improve the path network, entrance areas, visitor facilities and landscaping can now be progressed for implementation in late 2024/25 following the procurement of contractors.
For full information on why this work is needed can be found on the Japanese Knotweed at The Paddock page.
The Conservation Volunteers
To celebrate the completion of the first phase works, there will be a community event on 27 May 2023 (12noon – 1.30pm) open to the whole community, where families and individuals can get hands-on helping TCV to plant the meadow areas, take part in a crafts workshop, and go on a self-guided trail around The Paddock. The Paddock Design Team will also be on hand to share information about the Paddock Enhancement Programme For more details, please visit: www.tcv.org.uk/thepaddock
Discover more

Japanese Knotweed works: FAQs
Answers to all your Frequently Asked Questions about the works to clear Japanese Knotweed.

The Paddock Enhancement Project
Find out out about our proposals to transform The Paddock.

About The Paddock
Find out more about The Paddock.

Japanese Knotweed treatment
Learn more about our proposals to treat infestations of Japanese Knotweed at the Paddock.

Visitor centre
Learn more about our proposals for a new visitor centre.

Habitat access and protection
Learn more about our proposals for natural forms of protection and seating areas.

Getting closer to nature
Learn more about our proposals for a new pond and open riverside hide.

Movement and accessibility
Learn more about our proposals for primary routes, secondary routes and access points.

Proposed masterplan
Learn more about the proposed Paddock Masterplan, showing pathways, access points, wildlife hide and visitor building.
Stay Informed
Follow our projects to get notified of upcoming engagements and the latest project related news.