The Retrofit Process
Retrofitting domestic buildings under the PAS2035 process is a new standard. Find out about how it works here.
Haringey Retrofit Consultations
About the Haringey Retrofit
Time for a retrofit assessment
The retrofit assessment should take around one to two hours.
The retrofit and repairs
Outstanding repairs will be recorded in the surveyors' documents. Rectifying existing repairs will be dependent on the type of works needed to remedy these and whether they are complementary to the retrofit process.
Some issues such as cracks, repointing, damp or leaks will all need to be remediated prior to the installation of insulation. Other issues identified as urgent will be dealt with through our repairs team.
Preparations for the retrofit assessment
Please ensure that the retrofit assessor can have clear access to all rooms to take photos and measurements without obstruction. If you’re unable to facilitate access and remove obstructions for any reason, please speak to us about this at your earliest convenience.
As part of our retrofit process across the borough we would like you to participate in our home user survey, please scan the QR code below or follow this link:

The survey will take 8-10 minutes to complete, and it will focus on how you use your home. The survey will be shared again with you after your retrofit, to measure improvements and monitor any changes.
If a member of your household is vulnerable, or if you need this information in another language, please let us know so that we can provide the appropriate support.
We will continue to update you at every stage of the process and at www.haringey.gov.uk/retrofit
After the assessment
If your home is rated as ‘EPC D’ or below by the assessment, we will prepare proposals for retrofit works to discuss and agree with you.
During this process, we can estimate savings, in a similar way to an Energy Performance Certificate (EPC), by looking at how you use your home and the amount of people you live with.
We will then go out to market to find a suitable contractor to deliver the works.
We will support you at every stage of the delivery process and provide you with certificates and usage instructions, for any new equipment we’ve installed, once the work is completed.
We will also follow up with you to see how the improvements have affected your comfort and energy consumption.
Changes to the appearance your home
Some measures such as external wall insulation will alter the external appearance of your property by thickening the depth of the wall itself and having a render or brick slip finish. Some of the works such as replacement windows and doors will also be different from your existing ones.
The image below shows an example of a property with external wall insulation.
The designs will be subject to conversations with Haringey Council’s planning department, to ensure that they are in keeping with your existing home.

Leaving your home during the works
At the installation stage, whether you stay in your home or not will depend on the type of works taking place. Some works are external and shouldn’t affect you. Some internal works may require you to leave your home (or a specific room) for a short time. We will ensure you have plenty of notice and know how long the work will take. We will do our best to keep any disruption to a minimum but appreciate that construction work can be noisy.
Damages resulting from works
Any damage caused by these construction works will be rectified during the snagging or defects and liability period. The retrofit assessments will serve as a record and we will verify any damages against this. The need for internal redecoration and reinstatement of garden decking, awnings or satellite dishes should all be recorded before works begin so we can ensure they are included in the delivery plan.
Retrofit timescale
This will vary in line with the proposal for each home. You will be given a timeframe for the works to be carried out at the design stage and we will keep you informed throughout the process.
Proposed Measures

1. Roof: whilst most properties have loft insulation, the amount of insulation will be increased at loft level to reduce heat lost through the roof.
2. Walls: thick external wall insulation (known as EWI) will dramatically reduce the amount of heat lost through the brick walls.
3. Stopping drafts: improving the airtightness of the walls, roof, windows and doors can lead to a big reduction in the heating used, and also make the rooms much more comfortable.
4. Windows and doors: high performance double glazed windows and well insulated external doors will be fitted or re-fitted to keep the heat inside, and reduce noise from outside.
5. Floor: water resistant insulation will be used around the walls at low level to avoid losing heat from the floor to the surrounding ground outside.
6. Repairs / damp / mould: any issues that have been identified in the surveys such as cracks, gaps, leaky gutters, damp patches or mould will be repaired during the work to each home.
7. Ventilation: replacement extract fans in kitchens and bathrooms, along with trickle vents in windows, to maintain indoor air quality and reduce condensation. Any recently installed fans may be retained

If you have any further questions regarding the retrofit programme please email the retrofit team:
retrofit@haringey.gov.uk
Discover more

Wave 3
The council received a grant from SHF Warm Homes to deliver retrofit of 400 council homes.

Freeholder Retrofit Advice
Information for home owners who are interested in retrofit works

Coldfall Retrofit Information
Find out about the Coldfall retrofit including contact details for the retrofit team and key Haringey stakeholders

The Retrofit Assessment
The retrofit assessment is part of PAS2035 statutory process and is the first step in the retrofit process. A retrofit installer cannot add energy saving improvements to your home without a valid retr

About the Haringey council retrofit programme
What retrofit means, and why Haringey Council is rolling it out across the borough.
Stay Informed
Follow our projects to get notified of upcoming engagements and the latest project related news.