Project

Resident update: sandblasting works underway - Debden block

As part of the External Major Works Programme, sandblasting works started last week (week commencing Monday 8 December) at Debden block. This process is an essential step to prepare concrete surfaces

Broadwater Farm Estate

As part of the External Major Works Programme, sandblasting works started last week (week commencing Monday 8 December) at Debden block. This process is an essential step to prepare concrete surfaces for repair and painting. 

Why sandblasting is needed: 

  • Removes contaminants: Over time, concrete collects dirt, grease, and other substances. Sandblasting cleans these away to ensure new coatings stick properly. 

  • Creates a textured surface: The process roughens the concrete, providing a strong grip for new materials. This prevents issues like peeling or chipping later. 

  • Improves durability: Proper preparation means repairs and coatings last longer, saving costs in the future. 

  • Removes weak layers: Damaged or unsound concrete is stripped away, leaving a solid base for treatment. 

  • Prepares for new applications: Old paint or coatings are removed so new finishes can bond effectively. 

In summary, sandblasting creates a clean, strong surface that ensures repairs and painting are successful and long-lasting. 

Protective measures being undertaken for your safety
We appreciate this work is noisy and can cause additional dust and debris.  

You may have seen the extra boarding and surface covering. DCK have put these in place to reduce noise and contain debris. 

Warning signs are also in place directing pedestrians and residents to use alternative walkways and entrance/exit routes during sandblasting works to Debden’s balconies and undercroft car park spaces. Please do not ignore these signs—they are for your safety. 

Ongoing works across the estate
These works will continue across the estate as the programme progresses. Even if works are not happening directly to your block now, it’s important to be aware of the works and what’s involved. 

Thank you for your cooperation as we carry out these essential improvements. 

Visit the external major works programme page for all the latest information. 

Stay Informed

Follow our projects to get notified of upcoming engagements and the latest project related news.