Visit Nantucket, MA Homepage
Stormwater AI generated image

Stormwater Management Bylaw Approval & Implementation

The Town of Nantucket is developing a Stormwater Management Bylaw to establish a comprehensive, equitable, and sustainable framework for managing stormwater runoff, protecting water resources, and maintaining drainage infrastructure.

Background

During the 2026 Annual Town Meeting, residents voted to pass a Stormwater Bylaw (Article 71) which provides a foundation to establish a fair, equitable, and sustainable system for using and maintaining the Town's Stormwater System. The Bylaw authorizes the Select Board to establish a Stormwater Utility to administer rules and regulations, issue stormwater permits and manage dedicated funding through a Stormwater Utility Fee and Enterprise Fund. This new approach will help to control runoff from development, prevent pollutants from entering the storm drain system, promote groundwater recharge, prevent flooding and erosion, and extend the life of stormwater infrastructure.

What is Happening Now?

  • The Town has developed a set of draft regulations for review and public input. These have been reviewed and edited by Town Counsel during the development process to ensure they are legally defensible and enforceable.
  • A draft of the regulations is provided on this page, along with a comment form to gather public input on the draft regulations. Smaller stakeholder meetings will be scheduled for a workshop style discussion of specific topics as needed to address specific concerns.
  • A final version of the regulations will be presented to the Select Board for approval and adoption at a public hearing. The Town has solicited feedback from internal departments throughout the development of these draft regulations but would like to receive input from stakeholders before delivering a final draft for review by the Select Board.
  • The draft regulations will be presented for review at Town boards and commissions, including ConCom, Planning Board, Water Commissioners, and Board of Health to ensure compatibility with existing Town regulations.
  • The regulations will be administered by the Stormwater Utility with oversight of the Select Board. These regulations address many stormwater related activities including illicit discharges, stormwater management for construction and land development activities, and management of the Stormwater Utility Fee.

Project Timeline

2026 Annual Town Meeting

May 4, 2026
Stormwater Bylaw approved by voters

Stormwater Bylaw under review of the Attorney General

May 2026 - Present

Stormwater Regulations developed and reviewed internally by Town staff

Summer 2026

Contact Us

Call 508-228-7200
Follow Us

Stay Informed

Stay in the loop with all the latest updates on upcoming engagements and project news by signing up for notifications.