2017 Project 24: New Path Connection – Crosstown Bridge/Tunnel Engineering
Status: Completed
Location: HWY 74 S at Crosstown Rd
Proposed Project Year: 2017
Original Project Budget: $20,000
Project Description:
Engineering only to determine feasibility and possible location of a bridge or tunnel crossing HWY 74 near Crosstown Rd.
Final Update
Public Works has walked the area to scope out the terrain and get preliminary data. The next step will be to contract with an engineering firm for a feasibility study and cost estimate. Crossing the railroad at grade will be difficult and will increase project costs dramatically. Peachtree City anticipates completing this project in 2023. The feasibility study has been completed, the findings can be viewed by clicking "Project Feasibility Study" in the Documents below.
SPLOST Funds Over Budget: $800
SPLOST Actuals Total Cost of Project: $20,800