Mayer/David Road Storm Drain Project
Overview
As part of the City's commitment to build towards a sustainable and resilient future we are excited to invest in upcoming drainage and infrastructure improvements in the Mayer/David Road neighborhood. At its core, the goal of this project is to separate stormwater from the sanitary sewer system, significantly mitigating the risk of combined sewer overflows (CSOs) during high rainfall events. By reducing untreated sewage and stormwater discharge during heavy rainfalls, we're not only protecting the health and economy of the Casco Bay, but also the longevity of Portland's sewer system by exposing it to less variability with the changing climate.
Rather than joining the sewer system, stormwater will instead be passively detained and treated through streetside infrastructure, where debris and nutrients will be removed and flows will have a chance to infiltrate into the groundwater naturally. In large storm events, drainage infrastructure will route stormwater to the Capisic Brook, where it would have flowed naturally before development.
Installing drainage infrastructure will allow the opportunity for the City to provide other neighborhood infrastructure improvements, such as regrading and repair of the streets/sidewalks, opportunistic sewer renewal and waterline replacement in conjunction with the Portland Water District (PWD).
Project Location

Project Updates
During construction, weekly updates will be provided on work completed and what to expect in the following week.
Project Scope
Learn more about specific parts of the project below:
Why Here? Why Now?
The Mayer/David Neighborhood sits between the Capisic Brook and Fore River resulting in large amounts of fine silts and clays making up the base soils in the neighborhood. Since these soils drain slowly, intense rain events result in larger amounts of runoff as opposed to parts of the City with rocky loose soils. Fine soils also tend to expand and contract as the water concentration varies naturally, resulting in sidewalk and roadway degradation at a faster rate than we'd expect in better draining parts of town. A major part of this project will be installing underdrain to keep moisture from building up under the edges of the roadway and infiltrating only within systems designed to drain quickly without expanding.
The proximity of the neighborhood to the Capisic Brook also allows for stormwater discharge without having to route expensive storm drain far outside of the neighborhood or without the potential for creating flooding elsewhere that is not prepared to handle stormwater flows from outside of its watershed area.
Planning for this project began in 2020 after a Sewer overflow occurred. The City has also received complaints of icing in the roadway that creates dangerous driving conditions in the winter time. The sewer lines in this neighborhood are in largely good condition, but are undersized to handle the amount of stormwater that can enter the system during large storm events. As the climate changes, the expectation for Portland is that we will receive less frequent but more intense storms. Separating the combined sewer system will proactively remove stormwater from the sanitary sewer before the larger storms of the future have a chance to cause sewer back-up or overflow within the neighborhood or into the Casco Bay.
Mayer/David SD Draft Plans
Please note these are draft plans and have not been issued for construction. Construction level plans will be issued and posted here prior to bidding.
Timeline
Please note the Construction Timeline is subject to change based on Contract and Contractor availability
Design and Neighborhood Engagement
Bidding and Contract Execution
Construction
Contact Us
Jacob Cowley Water Resources Engineer - City of Portland Department of Public Works
Icing Hazard at the Corner of Mayer and David

Existing Sidewalk Condition

Anderson St Rain Garden
Design Comparable to the Proposed Mayer/David Road Systems