Town of Renfrew Master Servicing Plan

The Town of Renfrew (Town) is undertaking a comprehensive review of its existing potable water, stormwater, and wastewater systems to better understand their current condition and evaluate their capacity to support future growth. As part of this initiative, the Town will update their Master Servicing Plan (study area shown in Figure 1). Based on the study findings and input from technical agencies and the public, the recommended Master Plan is as shown in the attached key plan. The Master Plan identifies the recommended infrastructure to service the future growth of the Town while minimizing environmental impacts. The recommended Master Plan incorporates the comments received from the public and agencies during the study. The main components are listed below. While the Master Plan addresses need and justification and a broad level, more detailed studies for each of the projects included in the Master Plan will be done later following the Municipal Class Environmental Assessment.

The Master Servicing Plan is available here:
https://townofrenfrew-my.sharepoint.com/:b:/g/personal/abishop_renfrew_ca/IQCe7tQR_3YrS7zhnDOZH5VOAbDfPlh5ekxlYGWrDgJf-94?e=xkyLHu


The study is being undertaken in accordance with Approach #1 of the Master Planning Process, as outlined in Section A.2.7.1. of the Municipal Class Environmental Assessment (MCEA) document (2024). As such the Master Servicing Plan will address Phases 1 and 2 of the MCEA process and would therefore become the basis for, and be used in support of, future investigations for the specific Schedule B and C projects identified within it.

Please forward any comments to the study team members by May 30, 2026. Thereafter, the Master Plan will be reviewed and revised taking into consideration the comments that are received from the public. The recommended Master Plan will be presented to Town Council for approval.

Please visit the Town’s study website or contact one of the following study team members if you would like to learn more about this project, be added to the project mailing list, provide comments, or have any accessibility requests:

Marc Telmosse, P.Eng.
Project Manager (Consultant)
Stantec Consulting Ltd.
Tel: 613-415-7655
Email: Marc.Telmosse@stantec.com

Andrea Bishop, P.Eng.
Director of Infrastructure, Public Works &
Engineering
Town of Renfrew
Tel: 613-432-4848x306
Email: abishop@renfrew.ca

All personal information included in your request – such as name, address, telephone number and property location – is collected, under the authority of section 30 of the Environmental Assessment Act and is collected and maintained for the purpose of creating a record that is available to the general public. As this information is collected for the purpose of a public record, the protection of personal information provided in the Freedom of Information and Protection of Privacy Act (FIPPA) does not apply (s.37). Personal information you submit will become part of the available public record unless you request that your personal information remain confidential.

This Notice was issued on May 1, 2026.

Figure 1

Stay Informed

Get notified on upcoming engagements and the latest project related news.

Important Dates

30
mai 2026

Comments and Feedback Deadline

Comments on the proposed Master Planning Process are due by May 30, 2026.