Virginia’s first in-river park is about to start construction on the Roanoke River! This project resulted from over a decade of advocacy and analysis supported by Roanoke’s outdoor community. Roanoke Outside conducted a feasibility study for an in-river whitewater park and released the results in December 2015. The study assessed multiple site options in the Roanoke Valley, and this work informed the City’s selection of the final project site. The design of the In-River Park has grown to include access points and whitewater features stretching from under Memorial Bridge downstream through Vic Thomas and Wasena Parks to the first Wiley Drive low-water bridge.

The final design was developed over two years of engagement and collaboration with residents, stakeholders, and regulatory agencies. Local paddlers prioritized a design that accommodated consistent use at typical Roanoke River flows for frequent after-work laps. The paddling community was also eager to see a diversity of features for training, both for more experienced boaters’ skill-building and for teaching those new to whitewater sports. Plans include waves, calm eddies, and more; this variety of features will create opportunities for surfing, eddy hopping, and slalom-style attainment maneuvers while remaining welcoming and approachable for tubers and stand-up paddleboarders.

In-River parks have the potential to be more than just playgrounds for paddle sports enthusiasts. This project is designed to be a vital community hub and offer prime destinations for outdoor-recreation-based tourism. More broadly, other river users are excited to see new ADA access points, a wading area for families, and seating areas on the stone terraces for viewing river activity.

Another key element of the project is connectivity to the Roanoke River Greenway, an important pedestrian link across the City into neighboring localities. This linkage encourages easy access for those without a vehicle, and supports the City’s goal to make the region’s wonderful outdoor recreation assets more accessible close to home. The project is also positioned minutes from downtown and adjacent to vibrant neighborhood center businesses in Wasena, Grandin Village, and the West End. This central location will support the region’s outdoor economy growth through the recreation, retail, hospitality, and culinary sectors that will host visitors from throughout the region.

Check back in frequently for progress updates as the project starts construction this summer!


Summer 2026 River Access Points

In-River Park Design Renderings

Manténgase informado

Reciba notificaciones sobre los próximos compromisos y las últimas noticias relacionadas con el proyecto.

Cindy McFall
Cindy McFall
Director de Parques y Recreación

Fases del proyecto

Construction on Site A: ADA access point under Memorial Bridge

Completed November 2025

Construction Site F: Upstream of the first Wiley Drive low water bridge

December 2025

Construction Site B: Underneath the Wasena pedestrian bridge

Late 2026

Actualizaciones del proyecto

Fechas importantes

1
dic 2015

Estudio de viabilidad publicado

Los resultados encuentran que el sitio de Wasena Park es una ubicación factible para un proyecto de parque en el río. • El estudio de viabilidad fue preparado para Roanoke Outside, ese enlace se puede encontrar aquí: https://roanokeoutside.com/wp-content/uploads/2018/02/Roanoke_Report.pdf

1
jul 2022

Fondos

La ciudad de Roanoke asigna $2 millones en fondos ARPA al proyecto.

1
jul 2023

Diseños publicados

Roanoke Parks and Recreation publica diseños esquemáticos propuestos.

3
ago 2023

Participación de la comunidad

Parques y Recreación de Roanoke realiza una reunión pública para discutir el proyecto con la comunidad.

27
dic 2024

Construction Contract Finalized

A $5.6 million construction contract was finalized with the successful bidder, Environmental Quality Resources, to move forward with three of the five planned in-river feature and access points when permits are finalized in 2025.

9
ene 2025

DEQ Permit Received

City received the Department of Environmental Quality's Virginia Water Protection Permit for the project, one of several permits required for construction

5
mar 2025

US Fish and Wildlife Service's Formal Biological Opinion Received

City received the US Fish and Wildlife Service's formal Biological Opinion on the project, a key milestone in the US Army Corps of Engineer's permit review process.