Terra-Turner Waterline Replacement Project Update for the Week of 6/3/2024
Project

Terra-Turner Waterline Replacement Project Update for the Week of 6/3/2024

Terra-Turner Waterline Replacement Project Update for the Week of 6/3/2024

Terra-Turner Waterline Replacement Project

Main construction activity and items to watch for:

The Contractor will continue work as follows:

· Prepping and placing asphalt on S. Sheridan Ave. – Asphalt is scheduled for Wednesday

· Excavating and installing waterline on the east end of Riverside St.

· Work on Terra Ave. will include cleanup and prepping for asphalt.

· There will also be work on concrete preparation and placement of parking areas and curb and gutter on Turner/Terra and Sheridan Ave.

Planned location of construction and road closures for week of 6/3:

· S. Sheridan Ave. will be one-way (north to south) for local through traffic.

· Terra Ave. is now open for local traffic.

· Riverside - The street is closed to through traffic. Road closure is on the east end.