Visit Sheridan, WY Homepage
Terra-Turner Waterline Replacement Project Update for the Week of 7/15/2024
Project

Terra-Turner Waterline Replacement Project Update for the Week of 7/15/2024

Terra-Turner Waterline Replacement Project Update for the Week of 7/15/2024

Terra-Turner Waterline Replacement Project

Main construction activity and items to watch for:

The Contractor will continue work as follows:

  • Install valley gutter across Riverside St.
  • Cutting asphalt around valve boxes in the streets and installing concrete collars
  • Clean up

Planned location of construction and road closures for week of 7/15:

  • Riverside – Will be closed at the intersection with Terra beginning on Monday through Thursday.
  • S. Sheridan Ave. – Open

Terra Ave. – Open

Access:

Terra Ave: Street is open to local through traffic. Please watch for crews installing concrete collars and follow cones and signage.

Sheridan Ave: Street is open. Please watch for crews installing concrete collars and follow cones and signage.

Riverside: The road will be closed east of the intersection with Terra. Access will be from the east off Coffeen Ave. for residents east of Terra and west, off of S. Sheridan Ave. for those west of Terra.

Other items of note to watch for:

Please try to limit parking on the streets.

Stay Informed

Get notified on upcoming engagements and the latest project related news.