Main construction activity and items to watch for:
The Contractor will continue work as follows:
· Prepping and placing asphalt on S. Sheridan Ave. – Asphalt is scheduled for Wednesday
· Excavating and installing waterline on the east end of Riverside St.
· Work on Terra Ave. will include cleanup and prepping for asphalt.
· There will also be work on concrete preparation and placement of parking areas and curb and gutter on Turner/Terra and Sheridan Ave.
Planned location of construction and road closures for week of 6/3:
· S. Sheridan Ave. will be one-way (north to south) for local through traffic.
· Terra Ave. is now open for local traffic.
· Riverside - The street is closed to through traffic. Road closure is on the east end.