Investing in local travel
We are investing in local transport to make it easier and safer for people walking, cycling, wheeling, and travelling by bus between communities in and around Bradley Stoke and Thornbury and on into Bristol.
Ynglŷn â'r prosiect
E-bost
Public transport and active travel improvements along the A38
Public transport and active travel improvements for Bradley Stoke Way
Alveston Hill
Consultation Archive
Llinell amser
Initial funding bid
Initial consultation
Initial consultations on design
Scheme design consultation (full design)
Funding submission (Bradley Stoke Way)
Funding submission (A38)
Funding approval (Bradley Stoke Way)
Funding approval (A38)
Construction - Bradley Stoke Way
Construction - A38
Construction - Alveston Hill
News
Overnight roundabout resurfacing in Bradley Stoke during November
As part of ongoing works, overnight resurfacing will be taking place at both Savages Wood Roundabout and Patchway Brook Roundabout during November.Savages Wood Roundabout - 2 to 9 NovemberOvernight re
A38 Fernhill junction closure
Work continues to progress well on the A38 and we will be moving on to our next stage at the junction of the A38 and Fernhill. The junction will be fully closed 24 hours a day for five weeks.Details o
Work due to start in Streamleaze, Thornbury
We are moving on to the next stage of the Alveston Hill project to improve pedestrian safety and provide more sustainable travel options. The scheme will improve walking and cycling routes, making loc
Sharing roadworks information
We are carrying out research to understand how residents find out about roadworks and what information they need. Complete our short survey, which should only take 5 to 10 minutes, and your feedback w
A38 northbound overnight closures near M5 junction 16
We will be carrying out overnight roadworks on the A38 Gloucester Road northbound between M5 Junction 16 and Over Lane from 22 to 26 September. To allow the work to be completed safely, the road will
A38 overnight resurfacing and Washingpool Hill Road junction works
Thank you for your continued patience while we deliver active travel and public transport improvements along the A38.Construction is progressing well, and we will soon move into the next phase of the
Alveston Hill Safety Works
We will be carrying out works on Alveston Hill from Monday 24 August. The works will take place overnight between 8pm and 6am over five nights, from Monday 24 August until 6am on Saturday 29 August.Du
Upcoming overnight road closure on Bradley Stoke Way
Notice of overnight resurfacing works - Bradley Stoke Way (24-31 August)Overnight resurfacing works will be carried out on Bradley Stoke Way, between Patchway Brook Roundabout and Savages Wood Roundab

Update on the Alveston Hill cycling and walking improvements
The road-based improvements on Alveston Hill are now complete, marking an important milestone for the project. We're continuing to progress plans for the off-road section of the route.As the detailed
Upcoming overnight closures on the A38
As part of our programme of active travel and public transport improvements along the A38, there will be a series of overnight road closures between 8pm and 6am this summer:Hazel Lane to Greenhill (Al
Bradley Stoke roadworks update
Work is progressing well in Bradley Stoke and we are preparing for the next phase. Thank you for your continued patience whilst we deliver improvements for drivers, pedestrians, public transport users
Bradley Stoke drop-in event - Tuesday 30 June (12-6pm)
Come and chat to us about the travel improvements we're delivering for Bradley Stoke. Meet the project team, share your feedback and find out more about upcoming works.We'll also be able to talk to yo
M4 overbridge work delayed
Work on the M4 overbridge on the A38, between Almondsbury and Hortham Lane, has been delayed. Unfortunately, adverse weather conditions this week mean we’ve had to postpone the work. As a result, ther
Bradley Stoke Way - temporary road closure
On Thursday 21 May, Bradley Stoke Way will be closed northbound from Savages Wood Roundabout to Patchway Brook Roundabout. The closure will be for four hours and in place from 8pm until midnight. 
A38 works to start in Almondsbury in May 2026
Work is progressing well on the A38 and we are preparing for the next phase. Thank you for your continued patience while we deliver active travel and public transport improvements on the A38. We will
A38 works in Thornbury starting 18 May 2026
Works are progressing well along the A38 and remain on schedule. We will be moving into the next phase at Thornbury on 18 May, and the information below, sets out what to expect and how you may be aff
Bradley Stoke Way roadworks update
We are pleased to confirm that the works on Bowsland Way will be completed shortly, and that the road will re-open fully from Sunday 19 April. Thank you for your patience during the construction perio
Footpath closure on Bradley Stoke Way
From 3 April, the footway on Bradley Stoke Way will be closed from just south of Wheatfield Drive to the Willow Brook Centre.This section, which we have been able to keep open until now, will be close
Bradley Stoke drop-in event - Monday 9 March
Come and chat to us about the travel improvements we're delivering for Bradley Stoke. Meet the project team, share your feedback and find out more about upcoming works.We'll also be able to talk to yo
A38 next phase to start
Progress continues on the A38 improvement scheme, with resurfacing now largely completed at the Church Road (Rudgeway), Hortham Lane (Almondsbury) and Thornbury Road (Alveston) junctions. These works,
Alveston Hill construction update
We are pleased to confirm that the works on Thornbury Road / Alveston Hill B4061 will be complete by the end of February, and that the road will fully re-open to traffic both ways from the morning of
Road closure changes on Bowsland Way from 28 February
From March, the current road closure on Bowsland Way will change. To prepare for this, there will be overnight closures at the junction with Patchway Brook Roundabout for three consecutive nights.Deta
Works on A38 and Alveston Hill from 2 February 2026
Work is on schedule on the A38 and Alveston Hill to deliver active travel and public transport improvements. We would like remind you of the next phase starting on 2 February 2026, and want to inform
Bradley Stoke Way works for 2026
Throughout 2026, roadworks will be in place between Savages Wood Roundabout and Aztec West Roundabout. Work will take place in stages, and we will update our website regularly so that you know what to
Overnight closures on A38 Gloucester Road
We’re continuing work to deliver improvements for active travel and public transport along the A38. As part of these works, there will be upcoming overnight road closures at three locations on Glouces
Bradley Stoke drop-in event - Wednesday 17 December
Bradley Stoke drop-in event - Wednesday 17 December, 3pm-7pmCome and chat to us about the travel improvements we're delivering for Bradley Stoke. Meet the project team, share your views and feedback,

Alveston Hill works update
Works have been progressing well on Alveston Hill and on 27 October we will move to the next phase of works, which will involve both a daytime one-way restriction and overnight full road closures. Clo
Overnight A38 junction closures 29 September - 6 October
Overnight road closures on the A38 Gloucester Road - 29 September to 6 October 2025 Closure detailsDates: 29 September to 6 October 2025 Times: Nightly from 8:00pm to 6:00am Location: There are three
Church Road, Rudgeway overnight closures
Work is progressing well on the A38 corridor and we will shortly undertake overnight works during August on Church Road, just off of the A38. Closure detailsDates: Monday 11 to Sunday 31 August Times:
Upcoming changes to Bradley Stoke Way closures
From July 20, we will move to the next phase of work on Bradley Stoke Way (northbound), as outlined below. Closure details: Dates: Sunday 20 July to end of December Location: One-way closure of Bradle
Hortham Lane, Almondsbury overnight closures
Work is progressing well on the A38 corridor and we are about to start work on Hortham Lane, Almondsbury, just off the A38. Closure details Dates: Monday 21 July to Sunday 10 August&nb
Baileys Court Road and Webbs Wood Road: Road closures in place from Saturday 21 June
The next round of road closures in Bradley Stoke will be in place from Saturday 21 June. This will involve a combination of full road and one-way closures. Some work will take place overnight. Fi
Bradley Stoke Way update May 2025
Works are progressing well in Bradley Stoke with a section of resurfacing due to be completed next week. Changes to the roadworks from 31 May Overnight road closures 31 May to 2 June Overnight on Sa
A38 and Alveston Hill project delivery update April 2025
We are progressing work on the A38 and Alveston Hill improvement schemes. There are several phases of roadworks. The below overnight closures are required to install narrow lanes and amend the existin
Alveston Hill Update March 2025
Important update on Alveston Hill improvements Following the approval of the Full Business Case for the Alveston Hill improvements in January - Decision- Thornbury to A38 (Alveston Hill Cycleway), imp
A38 Update March 2025
Important update on A38 improvements Following the approval of the Full Business Case for the A38 improvements in February, improvement works on the A38 are scheduled to start this Spring a
Decisions pending on projects to deliver active travel and public transport improvements on the A38 and Alveston Hill.
We wanted to provide an update on these two schemes which seek to improve public transport provision and make it safer and easier to walk, cycle or wheel. A38Following two periods of consultation
Construction to deliver improvements on Bradley Stoke Way due to start on 17 February 2025
Construction will start on Monday, 17 February to deliver improvements on Bradley Stoke Way. The work, which will improve options for public transport and active travel, is due to be completed by Dece
Notice of ground investigation work
From Monday 16 September, contractors Geotechnical Engineering Ltd will be carrying out ground investigation surveys on our behalf in a number of locations along the A38 Gloucester
Proposals for Alveston Hill scheme revised in response to public feedback
In response to public feedback, the project team and designers working on the pedestrian and cycling improvements in Alveston Hill have decided to adjust the proposals for the junction between Down Ro
Consultation reports published
The project teams are grateful to the hundreds of local people who shared their views via the consultations on the proposed pedestrian and cycling improvements for the A38, Alveston Hill and Bradley S

Planning application submitted for new off-road greenway
We have submitted a planning application for a new off-road greenway, including a two-way cycle track with segregated footpath, along Alveston Hill. The greenway will run through fields from the B406
Thank you and next steps
👍 Thank you to everyone who has taken the time to complete our recent surveys on investment in active and sustainable travel. We have had comments back from more than 1,500 South Gloucestershire resi
Drop-in engagement event: Almondsbury, Thursday, 14 December
We are coming to Almondsbury to hear your views on proposed travel improvements. Have your say on the proposals to provide better options for pedestrians, cyclists and bus users. - Thursday 14 Decemb
Drop-in engagement event, Almondsbury
We are coming to Almondsbury to hear your views on our proposed travel improvements. Have your say on the proposals to improve options for pedestrians, cyclists and bus users. - Thursday 14 December -
Still time to have your say
Thank you to everyone who has taken part in our travel improvement consultation so far. We’ve already had feedback from hundreds of local residents and stakeholders on proposals to improve active and
Drop-in engagement event at Thornbury Library on Monday 6 November, 6pm to 8pm
We would like to talk to you about our proposals to improve travel options along the A38, B4061 Thornbury Road / Alveston Hill and Bradley Stoke Way. This event is being held as part of the council’s
Drop-in engagement event at Alveston Methodist Church on Wednesday 15 November, 4pm to 6.30pm
We would like to talk to you about our proposals to improve travel options along the A38, B4061 Thornbury Road/Alveston Hill and Bradley Stoke Way. Date: Wednesday 15 November Venue: Alveston Metho
Online engagement event via Microsoft Teams on Monday 27 November, 12pm to 1pm
We would like to talk to you about our proposals to improve travel options along the A38, B4061 Thornbury Road / Alveston Hill and Bradley Stoke Way. Log on, listen to a short presentation and talk ab
Online engagement event via Microsoft Teams on Monday 27 November, 6pm to 7pm
We would like to talk to you about our proposals to improve travel options along the A38, B4061 Thornbury Road / Alveston Hill and Bradley Stoke Way. Log on, listen to a short presentation and talk ab
Drop-in engagement event at Willowbrook Shopping Centre, Bradley Stoke on Tuesday 28 November, 10am to 12pm
We would like to talk to you about our proposals to improve travel options along the A38, B4061 Thornbury Road / Alveston Hill and Bradley Stoke Way. This event is being held as part of the council’s
Come and talk to us
The project team will be holding a series of drop-in events over the next six weeks where members of the public will be able to talk to us, find out more about the proposals and ask questions. There w
Cyfarfod â'r tîm

This consultation is being run by South Gloucestershire Council. Your feedback will only be visible to officers working for the council. We will analyse the results and share summary reports with councillors and other decision-makers and the public.

Contact Team
If you have questions relating to this project, you should contact us by email.
Llinell amser
Initial funding bid
Initial consultation
Initial consultations on design
Scheme design consultation (full design)
Funding submission (Bradley Stoke Way)
Funding submission (A38)
Funding approval (Bradley Stoke Way)
Funding approval (A38)
Construction - Bradley Stoke Way
Construction - A38
Construction - Alveston Hill
News
Overnight roundabout resurfacing in Bradley Stoke during November
As part of ongoing works, overnight resurfacing will be taking place at both Savages Wood Roundabout and Patchway Brook Roundabout during November.Savages Wood Roundabout - 2 to 9 NovemberOvernight re
A38 Fernhill junction closure
Work continues to progress well on the A38 and we will be moving on to our next stage at the junction of the A38 and Fernhill. The junction will be fully closed 24 hours a day for five weeks.Details o
Work due to start in Streamleaze, Thornbury
We are moving on to the next stage of the Alveston Hill project to improve pedestrian safety and provide more sustainable travel options. The scheme will improve walking and cycling routes, making loc
Sharing roadworks information
We are carrying out research to understand how residents find out about roadworks and what information they need. Complete our short survey, which should only take 5 to 10 minutes, and your feedback w
A38 northbound overnight closures near M5 junction 16
We will be carrying out overnight roadworks on the A38 Gloucester Road northbound between M5 Junction 16 and Over Lane from 22 to 26 September. To allow the work to be completed safely, the road will
A38 overnight resurfacing and Washingpool Hill Road junction works
Thank you for your continued patience while we deliver active travel and public transport improvements along the A38.Construction is progressing well, and we will soon move into the next phase of the
Alveston Hill Safety Works
We will be carrying out works on Alveston Hill from Monday 24 August. The works will take place overnight between 8pm and 6am over five nights, from Monday 24 August until 6am on Saturday 29 August.Du
Upcoming overnight road closure on Bradley Stoke Way
Notice of overnight resurfacing works - Bradley Stoke Way (24-31 August)Overnight resurfacing works will be carried out on Bradley Stoke Way, between Patchway Brook Roundabout and Savages Wood Roundab

Update on the Alveston Hill cycling and walking improvements
The road-based improvements on Alveston Hill are now complete, marking an important milestone for the project. We're continuing to progress plans for the off-road section of the route.As the detailed
Upcoming overnight closures on the A38
As part of our programme of active travel and public transport improvements along the A38, there will be a series of overnight road closures between 8pm and 6am this summer:Hazel Lane to Greenhill (Al
Bradley Stoke roadworks update
Work is progressing well in Bradley Stoke and we are preparing for the next phase. Thank you for your continued patience whilst we deliver improvements for drivers, pedestrians, public transport users
Bradley Stoke drop-in event - Tuesday 30 June (12-6pm)
Come and chat to us about the travel improvements we're delivering for Bradley Stoke. Meet the project team, share your feedback and find out more about upcoming works.We'll also be able to talk to yo
M4 overbridge work delayed
Work on the M4 overbridge on the A38, between Almondsbury and Hortham Lane, has been delayed. Unfortunately, adverse weather conditions this week mean we’ve had to postpone the work. As a result, ther
Bradley Stoke Way - temporary road closure
On Thursday 21 May, Bradley Stoke Way will be closed northbound from Savages Wood Roundabout to Patchway Brook Roundabout. The closure will be for four hours and in place from 8pm until midnight. 
A38 works to start in Almondsbury in May 2026
Work is progressing well on the A38 and we are preparing for the next phase. Thank you for your continued patience while we deliver active travel and public transport improvements on the A38. We will
A38 works in Thornbury starting 18 May 2026
Works are progressing well along the A38 and remain on schedule. We will be moving into the next phase at Thornbury on 18 May, and the information below, sets out what to expect and how you may be aff
Bradley Stoke Way roadworks update
We are pleased to confirm that the works on Bowsland Way will be completed shortly, and that the road will re-open fully from Sunday 19 April. Thank you for your patience during the construction perio
Footpath closure on Bradley Stoke Way
From 3 April, the footway on Bradley Stoke Way will be closed from just south of Wheatfield Drive to the Willow Brook Centre.This section, which we have been able to keep open until now, will be close
Bradley Stoke drop-in event - Monday 9 March
Come and chat to us about the travel improvements we're delivering for Bradley Stoke. Meet the project team, share your feedback and find out more about upcoming works.We'll also be able to talk to yo
A38 next phase to start
Progress continues on the A38 improvement scheme, with resurfacing now largely completed at the Church Road (Rudgeway), Hortham Lane (Almondsbury) and Thornbury Road (Alveston) junctions. These works,
Alveston Hill construction update
We are pleased to confirm that the works on Thornbury Road / Alveston Hill B4061 will be complete by the end of February, and that the road will fully re-open to traffic both ways from the morning of
Road closure changes on Bowsland Way from 28 February
From March, the current road closure on Bowsland Way will change. To prepare for this, there will be overnight closures at the junction with Patchway Brook Roundabout for three consecutive nights.Deta
Works on A38 and Alveston Hill from 2 February 2026
Work is on schedule on the A38 and Alveston Hill to deliver active travel and public transport improvements. We would like remind you of the next phase starting on 2 February 2026, and want to inform
Bradley Stoke Way works for 2026
Throughout 2026, roadworks will be in place between Savages Wood Roundabout and Aztec West Roundabout. Work will take place in stages, and we will update our website regularly so that you know what to
Overnight closures on A38 Gloucester Road
We’re continuing work to deliver improvements for active travel and public transport along the A38. As part of these works, there will be upcoming overnight road closures at three locations on Glouces
Bradley Stoke drop-in event - Wednesday 17 December
Bradley Stoke drop-in event - Wednesday 17 December, 3pm-7pmCome and chat to us about the travel improvements we're delivering for Bradley Stoke. Meet the project team, share your views and feedback,

Alveston Hill works update
Works have been progressing well on Alveston Hill and on 27 October we will move to the next phase of works, which will involve both a daytime one-way restriction and overnight full road closures. Clo
Overnight A38 junction closures 29 September - 6 October
Overnight road closures on the A38 Gloucester Road - 29 September to 6 October 2025 Closure detailsDates: 29 September to 6 October 2025 Times: Nightly from 8:00pm to 6:00am Location: There are three
Church Road, Rudgeway overnight closures
Work is progressing well on the A38 corridor and we will shortly undertake overnight works during August on Church Road, just off of the A38. Closure detailsDates: Monday 11 to Sunday 31 August Times:
Upcoming changes to Bradley Stoke Way closures
From July 20, we will move to the next phase of work on Bradley Stoke Way (northbound), as outlined below. Closure details: Dates: Sunday 20 July to end of December Location: One-way closure of Bradle
Hortham Lane, Almondsbury overnight closures
Work is progressing well on the A38 corridor and we are about to start work on Hortham Lane, Almondsbury, just off the A38. Closure details Dates: Monday 21 July to Sunday 10 August&nb
Baileys Court Road and Webbs Wood Road: Road closures in place from Saturday 21 June
The next round of road closures in Bradley Stoke will be in place from Saturday 21 June. This will involve a combination of full road and one-way closures. Some work will take place overnight. Fi
Bradley Stoke Way update May 2025
Works are progressing well in Bradley Stoke with a section of resurfacing due to be completed next week. Changes to the roadworks from 31 May Overnight road closures 31 May to 2 June Overnight on Sa
A38 and Alveston Hill project delivery update April 2025
We are progressing work on the A38 and Alveston Hill improvement schemes. There are several phases of roadworks. The below overnight closures are required to install narrow lanes and amend the existin
Alveston Hill Update March 2025
Important update on Alveston Hill improvements Following the approval of the Full Business Case for the Alveston Hill improvements in January - Decision- Thornbury to A38 (Alveston Hill Cycleway), imp
A38 Update March 2025
Important update on A38 improvements Following the approval of the Full Business Case for the A38 improvements in February, improvement works on the A38 are scheduled to start this Spring a
Decisions pending on projects to deliver active travel and public transport improvements on the A38 and Alveston Hill.
We wanted to provide an update on these two schemes which seek to improve public transport provision and make it safer and easier to walk, cycle or wheel. A38Following two periods of consultation
Construction to deliver improvements on Bradley Stoke Way due to start on 17 February 2025
Construction will start on Monday, 17 February to deliver improvements on Bradley Stoke Way. The work, which will improve options for public transport and active travel, is due to be completed by Dece
Notice of ground investigation work
From Monday 16 September, contractors Geotechnical Engineering Ltd will be carrying out ground investigation surveys on our behalf in a number of locations along the A38 Gloucester
Proposals for Alveston Hill scheme revised in response to public feedback
In response to public feedback, the project team and designers working on the pedestrian and cycling improvements in Alveston Hill have decided to adjust the proposals for the junction between Down Ro
Consultation reports published
The project teams are grateful to the hundreds of local people who shared their views via the consultations on the proposed pedestrian and cycling improvements for the A38, Alveston Hill and Bradley S

Planning application submitted for new off-road greenway
We have submitted a planning application for a new off-road greenway, including a two-way cycle track with segregated footpath, along Alveston Hill. The greenway will run through fields from the B406
Thank you and next steps
👍 Thank you to everyone who has taken the time to complete our recent surveys on investment in active and sustainable travel. We have had comments back from more than 1,500 South Gloucestershire resi
Drop-in engagement event: Almondsbury, Thursday, 14 December
We are coming to Almondsbury to hear your views on proposed travel improvements. Have your say on the proposals to provide better options for pedestrians, cyclists and bus users. - Thursday 14 Decemb
Drop-in engagement event, Almondsbury
We are coming to Almondsbury to hear your views on our proposed travel improvements. Have your say on the proposals to improve options for pedestrians, cyclists and bus users. - Thursday 14 December -
Still time to have your say
Thank you to everyone who has taken part in our travel improvement consultation so far. We’ve already had feedback from hundreds of local residents and stakeholders on proposals to improve active and
Drop-in engagement event at Thornbury Library on Monday 6 November, 6pm to 8pm
We would like to talk to you about our proposals to improve travel options along the A38, B4061 Thornbury Road / Alveston Hill and Bradley Stoke Way. This event is being held as part of the council’s
Drop-in engagement event at Alveston Methodist Church on Wednesday 15 November, 4pm to 6.30pm
We would like to talk to you about our proposals to improve travel options along the A38, B4061 Thornbury Road/Alveston Hill and Bradley Stoke Way. Date: Wednesday 15 November Venue: Alveston Metho
Online engagement event via Microsoft Teams on Monday 27 November, 12pm to 1pm
We would like to talk to you about our proposals to improve travel options along the A38, B4061 Thornbury Road / Alveston Hill and Bradley Stoke Way. Log on, listen to a short presentation and talk ab
Online engagement event via Microsoft Teams on Monday 27 November, 6pm to 7pm
We would like to talk to you about our proposals to improve travel options along the A38, B4061 Thornbury Road / Alveston Hill and Bradley Stoke Way. Log on, listen to a short presentation and talk ab
Drop-in engagement event at Willowbrook Shopping Centre, Bradley Stoke on Tuesday 28 November, 10am to 12pm
We would like to talk to you about our proposals to improve travel options along the A38, B4061 Thornbury Road / Alveston Hill and Bradley Stoke Way. This event is being held as part of the council’s
Come and talk to us
The project team will be holding a series of drop-in events over the next six weeks where members of the public will be able to talk to us, find out more about the proposals and ask questions. There w
Team
Let's introduce you to the team
Commonplace facilitates this conversation on behalf of the team made up of the organisations listed here. The information you provide will only be used for the purposes stated in each organisation’s privacy policy.

This consultation is being run by South Gloucestershire Council. Your feedback will only be visible to officers working for the council. We will analyse the results and share summary reports with councillors and other decision-makers and the public.

Proposals
Public transport and active travel improvements along the A38

A38 & Alveston Hill Improvements
Please complete this survey if you'd like to provide feedback on the improvements planned for the A38 and Alveston Hill

Bradley Stoke Way Improvements
Please complete this survey if you'd like to provide feedback on the improvements planned for the Bradley Stoke Way