The improvements on a map

Maps showing the key changes proposed for the junction

Grovesend Road/A38 junction improvements

Map graphics of key changes

The proposal includes changes which will increase capacity, reduce congestion and improve safety. Key design features include:

  • A38 northbound would be widened to provide a new dedicated left turn lane at the junction with Grovesend Road,
  • A new 3m cycle track will be provided on the northbound side of the A38. This will be combined with a dropped kerb to allow cyclists heading down Grovesend Road to leave the carriageway and access the new cycle track,
  • A new 2m wide single carriageway cycle lane will also be provided for cyclists continuing north on the A38. These two features are provided to consolidate and improve the existing cycling features already present at the junction,
  • Additional space will be created on the A38 by combining the existing northbound straight on lane with the right turn lane. Traffic modelling has indicated that this reallocation of road space will be beneficial for future traffic flows,
  • The work will also include an amendment to the existing traffic signals through the introduction of a left turn filter for the new dedicated left turn lane,
  • The proposed widening also provides additional space on Grovesend Road to introduce dedicated left and right queuing lanes for traffic emerging on to the A38. 

These are shown graphically in the PDFs linked to below.