North Yate Highway improvements

The schemes

When developers are granted permissions to build major new housing schemes, they are required to put money aside to deliver improvements to local roads, walkways and other highway infrastructure to support those new homes.

Having listened to the views of local people, South Gloucestershire Council is proposing to use funding from the construction of the Ladden Garden Village and Peg Hill developments to improve local highway, pedestrian and cycle facilities within North Yate. The improvements are designed to support your travel options - however you choose to get around. We are asking for feedback on four specific proposals:

  1. Capacity improvements on Goose Green Way to ease traffic and congestion,
  2. Road safety improvements for Eastfield Drive,
  3. Improvements to make it easier and safer to walk or cycle to Brimsham Green school and Yate town centre,
  4. Investigate junction improvements at Southfield Way/Wickwar Road to improve safety and ease delays for drivers

Map showing the four schemes

In evaluating the proposals, we would encourage respondents to consider the different associated costs and benefits. This includes the costs and disruption involved with construction and the ongoing potential benefits in reducing congestion and encouraging more positive ways of getting around.

To help you with this, we have produced graphics which ‘grade’ each of the proposals against five factors. Each factor is scored between one and three.

Chart showing potential impact of each of the four schemes

Overview of the four schemes

Scheme 1: Capacity improvements on Goose Green Way to ease traffic and congestion

The Council is working to increase the proportion of local journeys which are completed by walking, wheeling, cycling, and other active travel options. However, with more homes in north Yate have come more vehicles, more journeys and more traffic and congestion. At key peak times, we are seeing congestion and delays on Goose Green Way.

 The primary aim of this proposal would be to ease congestion and improve the flow of traffic.

Council engineers have identified the most effective way to achieve this would be by increasing capacity at key junctions. This would be done by:

  • Adding new traffic lanes,
  • Changing signal phasing, and 
  • Optimising lane arrangements.

Scheme 2: Road safety improvements for Eastfield Drive 

Residents have expressed concern about the speed people drive on roads where they live. With increasing local traffic, this is becoming increasingly dangerous and so we are proposing measures to reduce vehicle speed and improve road safety. Measures are targeted on Eastfield Drive and include:

  • a new 20mph speed limit,
  • new pedestrian crossing south of Pear Tree Hey,
  • new traffic calming speed tables.

* A separate consultation is ongoing regarding 20mph speed limits on residential roads in Ladden Garden Village, including Eastfield Drive. The measures proposed would support compliance to the proposed 20mph speed limit.

Scheme 2 technical drawings

Scheme 3: Improvements to make it easier and safer to walk or cycle to Brimsham Green school and Yate town centre

Parents and pupils at Brimsham Green school have told us about issues which make it harder for them to walk or cycle to school. And people living to the north of Yate have asked for better and safer options to allow them to get to the town centre leaving their car behind.

This scheme is intended to achieve both these priorities through new and improved junction crossings and a dedicated off-road active travel route. In providing alternative options to driving, we hope to reduce congestion at peak times on the junctions along Goose Green Way.

The improvements would include:

  • new sections of path between Ladden Garden Village and Brimsham Green school,
  • a new pedestrian crossing at the south end of Randolph Avenue,
  • a new diagonal crossing at the Broad Lane and Greenways Road junction to allow pedestrians to cross both roads in one go,
  • widening the existing off-road route along Goose Green Way to separate cyclists from people walking,
  • a new pedestrian crossing on Station Road to allow easier access to Yate town centre.

Scheme 4: Investigate junction improvements at Southfield Way/Wickwar Road to improve safety and ease delays for drivers

Delays on Southfield Way at peak times may occur as a result of drivers looking to turn onto Wickwar Road struggling to find gaps in traffic. 

We are therefore proposing to investigate new traffic signals at this junction to explore whether this might ease congestion and improve road safety.

Scheme 4 technical drawings