Photo near the George Inn pub in Walton
Project

You Said, We Did

View a list of the key changes compared to the previous stage of engagement

Trees, planting and sustainable drainage

You Said, We Did - Changes to the proposals compared to engagement stage 2

Following the second stage of engagement, the plans were reviewed, changed where applicable and developed in more detail, taking into account the feedback we received for local stakeholders as well as further survey work. This has included removing some proposals where they received particularly low support or significant opposition overall. 

The key issues raised by respondents by area were:

Following feedback from the second round of engagement, proposals have been updated to make the streets in this area safer, healthier and more attractive with appropriate vehicle speed limits and improved facilities for walking, wheeling and cycling. The list below shows key changes for each area.

Updated proposals for Area 1 - which covers the streets surrounding Bridge Street.

  • New raised tables and tactile crossings at Bridge Street junctions.
  • Wayfinding signs to Thames Path and River Walk.
  • Bollards to prevent footway over-running.
  • Resurfaced footways and widened pedestrian areas.

Updated Proposals for Area 2 – Manor Road and Surrounding Roads

  • Raised tables and tactile crossings at Manor Road / Hillrise and Dudley Road junctions.
  • Relocated lamp columns and introduction of planters/greening.
  • Improved junction visibility and reduced on-street parking close to corners.
  • Full resurfacing and kerb realignments to aid accessibility and drainage.

Updated Proposals for Area 3 – Felix Road and Franklyn Road

  • Verge conversions to sustainable drainage (SuDS) features.
  • Added tree pits, planters, and pedestrian buildouts.
  • Wayfinding signage to the Thames River Path.

For the full designs, please see the pdfs in the relevant tiles for each area where updates have been shown in red text. To have your say, please submit your views via the survey at the bottom of each tile.

For more information on parking, please visit the parking tile on the commonplace page.

Discover more

ces2h6zcylgldqo2r9tk.jpg

Stage 3 Engagement Report

Read our engagement stage 3 report which describes the engagement process and summarises responses received

Posted:
Read More
qoewuubd2p7kntnrugtx.jpg

Trees, planting and sustainable drainage

Find out more about the proposals for planting in Walton-on-Thames and how you can get involved

Posted:
Read More
Photo of parking sign (generic)
Closed

Parking in Walton-on-Thames

View information on parking in the Walton-on-Thames LSI

Project:Walton Local Street Improvements
Photo of highway Sunbury Lane and Franklyn Road
Closed

Felix Road and Franklyn Road (Area 3)

View the updated design proposals for Felix Road, Franklyn Road and surrounding roads

Project:Walton Local Street Improvements
Photo of Manor Road
Closed

Manor Road and surrounding roads (Area 2)

View the updated design proposals for Manor Road and surrounding roads

Project:Walton Local Street Improvements
Photo of highway on Bridge Street near The Bear, Walton
Closed

Bridge Street and surrounding roads (Area 1)

View the updated design proposals for Bridge Street and surrounding roads

Project:Walton Local Street Improvements
Photo showing 20mph roundel
Closed

Area wide measures

Find out more and give your feedback on the area wide measures

Project:Walton Local Street Improvements
ozbjdrjpjxcm3fqs0azj.webp

Stage 2 Engagement Report

Read our engagement stage 2 report below which describes the engagement process and summarises the responses received during the second stage of engagement for the Walton-on-Thames Local Street Improv

Posted:
Read More
fcyxf7srax5doqgeyalt.jpg
Closed

Survey

This survey was used for engagement stage 2 and is now closed

Project:Walton Local Street Improvements

Stay Informed

Follow our projects to get notified of upcoming engagements and the latest project related news.